Eden Hills
Dubai Hills EstateH&H
Eden Hills is an off-plan project by H&H in Dubai Hills Estate, with 158 homes on 3 floors. DLD’s last inspection, on 26 Oct 2026, found it 4% built.
- Built
- 4%
- Handover
- Q4 2026
- Sales in 12 months
- No sales
- Homes
- 158
About
A villa community near Dubai Hills with 301 villas of 5 and 6 bedrooms and 29 plots for building your own home. Its three neighbourhoods are laid out around a central wadi, a green valley with walking trails. Residents share places to meet along the paths.
- 5-bed and 6-bed villas
- Plots to build your own home
- Central wadi with walking trails
Shared facilities
- Central wadi
- Walking trails
- Places to meet
Progress
- Q1 2025Building started
- Oct 2026Last inspection · 4%
- Q4 2026Planned handover
Location
Drive times
- Downtown Dubai20min
- Dubai Airport (DXB)30min
- Dubai Marina22min
By car. Jumeirah Public Beach, the nearest beach, is 8.6 km away.
Rated schools
No rated schools within 5 km
Getting around
- Hadaeq Mohammed Bin RashidGold Line · opens 20325 minwalk
- EquitiRed Line6.3 kmaway
- MeydanEtihad Rail · planned6.6 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB19 kmaway
Developer
- 1 finished
- 8 being built, on time
- 1 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- Eden Hills L.L.C
Also being built by H&H
| Project | Handover | Built |
|---|---|---|
| Eden House The ParkAl Wasl | Q1 2027Being built | 64% |
| Dubai Harbour Residences (Area 1)Dubai Marina | Q1 2028Being built | 30% |
| Dubai Harbour Residences (Area 3)Dubai Marina | Q1 2028Being built | 35% |
| Aman Residences DubaiJumeirah 2 | Q4 2028Being built | 1% |
| Rosewood Residences DubaiJumeirah 2 | Q4 2028Being built | 0% |
More questions about Eden Hills
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 4% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.
About AED 56k a year for a studio, AED 90k for a 1-bed, AED 140k for a 2-bed and AED 250k for a 3-bed in Hills Estate, a gross yield of about 6.1% Estimate.
Of H&H’s 10 projects on DLD’s record, 1 are finished. Of the 8 being built, none is past its planned date.
In Dubai Hills Estate, 20 minutes by car to Downtown Dubai and 30 to Dubai Airport (DXB). Equiti Metro station on the Red Line is 6.3 km away.
More nearby
Off-plan nearby
- Ellington House IVFrom AED 2.08M70% built · Handover not on record
- 399 Hills Park ANo sales0% built · Handover not on record
- HillsedgeFrom AED 1.87M26% built · Planned Q1 2029
- Greenside ResidenceFrom AED 1.62M93% built · Handover not on record
- Soho The BerkeleyNo sales46% built · Planned Q4 2026
- Vida Residences HillsideFrom AED 1.94M10% built · Planned Q2 2029
