Skip to content

Ellington House IV

Dubai Hills EstateEllington

FromAED 2.08M1 bed · 914 sq ft

Ellington House IV is an off-plan project by Ellington in Dubai Hills Estate, with 108 homes on 9 floors. DLD’s last inspection, on 26 Oct 2026, found it 70% built.

Built
70%
Handover
Not on record
Since launch
Up 8%1 bed price per sq ft
Homes
108

About

Ellington House IV is a 9-floor building of 108 homes in Dubai Hills Estate, its bright front facing the Dubai Hills Golf Course. Homes run from 1-bed to 4-bed flats, with 1-bed flats the largest group, and many look over the golf course and skyline. Residents share a clubhouse, golf lockers with a golf wash and a dog wash area.

  • Golf lockers and golf wash
  • Dog wash area
  • Golf course and skyline views

Shared facilities

  • Leisure and lounge pool
  • Shaded kids’ pool
  • Indoor and outdoor kids’ play areas
  • Golf lockers and golf wash
  • Dog wash area
  • Fitness studio
  • Clubhouse
  • Outdoor lounge and dining area

Progress

70%built
  1. Q4 2023Building started
  2. Feb–Apr 2024Launch sales · 28
  3. Oct 2026Last inspection · 70%

Prices

Price per sq ft

2,503 AED/sq ft9 sales in 12 months

Typical price by size

1 bed
AED 2.08M914 sq ft · 2,508 AED/sq ft · 5 sales
2 beds
Not enough sales2 sales
3 beds
Not enough sales2 sales

Against 14 Hills Estate off-plan projects with 10 or more sales

  • Lowest2,135AED/sq ft
  • Typical2,439AED/sq ft
  • Ellington House IV2,503AED/sq ft
  • Highest2,800AED/sq ft

Latest sales

Plus 1 newer sale, newest first
9 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
11 Nov 20261 bed New8172,264AED 1.85M
Jul 2026 · 3 sales
24 Jul 20261 bed8172,507AED 2.05M
24 Jul 20261 bed9142,279AED 2.08M
23 Jul 20263 beds1,8672,812AED 5.25M
May 2026 · 1 sale
11 May 20262 beds1,3702,336AED 3.2M
Apr 2026 · 1 sale
27 Apr 20261 bed8172,503AED 2.05M
Mar 2026 · 1 sale
2 Mar 20262 beds1,3592,502AED 3.4M
Feb 2026 · 1 sale
18 Feb 20263 beds1,8672,491AED 4.65M
Jan 2026 · 1 sale
28 Jan 20261 bed9142,654AED 2.43M
Nov 2025 · 1 sale
18 Nov 20251 bed9142,749AED 2.51M

Homes

108 homes by size

  • 1 bed45%49 homes · 817–914 sq ft · 4 layouts
  • 2 beds38%41 homes · 1,337–1,385 sq ft · 3 layouts
  • 3 beds15%16 homes · 1,867–5,825 sq ft · 3 layouts
  • 4 beds2%2 homes · 2,425 sq ft · 1 layout

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.08M

Location

Drive times

  • Downtown Dubai20min
  • Dubai Airport (DXB)30min
  • Dubai Marina22min

By car. Jumeirah Public Beach, the nearest beach, is 7.3 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Hadaeq Mohammed Bin RashidGold Line · opens 203222 minwalk
  • EquitiRed Line5.2 kmaway
  • MeydanEtihad Rail · planned6.5 kmaway
  • Al JaddafHigh-speed rail · planned14 kmaway
  • Dubai InternationalDXB19 kmaway
Area guideHills EstateFinished homesAED 2,274/sq ft1-bed rentAED 90k/yrGross yieldEstimate6.1%

Developer

  • 18 finished
  • 25 being built, on time
  • 7 past their planned date
  • 1 not started
Escrow bank
Emirates Islamic Bank
Legal name
EH4 Development L.L.C

Also being built by Ellington

Ellington’s other projects
ProjectHandoverBuilt
The PortmanJVCQ3 2025Past planned date79%
UH West BY EllingtonJLTQ1 2026Past planned date71%
UH East BY EllingtonJLTQ1 2026Past planned date47%
The QuaysideBusiness BayQ1 2026Past planned date55%
The Waterside Villas BY EllingtonMajanQ2 2026Past planned date32%
All 51 Ellington projects
Questions

More questions about Ellington House IV

From AED 2.08M for a 914 sq ft 1-bed, the lowest typical price paid in the 12 months.

108 homes on 9 floors: 49 1-bed flats of 817–914 sq ft, 41 2-bed flats of 1,337–1,385 sq ft, 16 3-bed flats of 1,867–5,825 sq ft and 2 4+ bed flats of 2,425 sq ft.

Up 8% for 1-bed flats, per sq ft.

About AED 90k a year for a 1-bed, AED 140k for a 2-bed and AED 250k for a 3-bed in Hills Estate, a gross yield of about 6.1% Estimate.

Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.08M.

In Dubai Hills Estate, 20 minutes by car to Downtown Dubai and 30 to Dubai Airport (DXB). Equiti Metro station on the Red Line is 5.2 km away.

More nearby

How the numbers work

FromAED 2.08MSee it on the map