
UH West by Ellington
Jumeirah Lake TowersEllington
UH West by Ellington is an off-plan project by Ellington in Jumeirah Lake Towers, with 377 homes on 37 floors. DLD’s last inspection, on 26 Oct 2026, found it 71% built.
- Built
- 71%
- Handover
- Q1 2026
- Sales in 12 months
- 45
- Homes
- 377
About
UH West is a 37-floor building of 377 homes in Jumeirah Lake Towers, part of Ellington’s UH development, looking over Jumeirah Islands. Most homes are 1-bed flats, with some studios, 2-bed flats and a few 3-bed flats. Shared spaces include a skate park, an aerial yoga studio and a space for artists in residence.
- Skate park and lounge
- Aerial yoga studio
- Artist-in-residence space
Shared facilities
- Lap and leisure pool
- Kids’ splash pad
- Padel court
- Climbing walls
- Aerial yoga studio
- Cinema room
- Podcast room
- Record lounge
Progress
- Q2 2023Building started
- Sep–Nov 2023Launch sales · 2
- Q1 2026Planned handover · passed
- Oct 2026Last inspection · 71%
Prices
Price per sq ft
Typical price by size
- Studio
- Not enough sales2 sales
- 1 bed
- AED 1.66M879 sq ft · 1,826 AED/sq ft · 23 sales
- 2 beds
- AED 2.5M1,282 sq ft · 2,030 AED/sq ft · 18 sales
- 3 beds
- Not enough sales2 sales
Against 17 JLT off-plan projects with 10 or more sales
- Lowest1,053AED/sq ft
- UH West by Ellington1,924AED/sq ft
- Typical2,441AED/sq ft
- Highest3,104AED/sq ft
4th lowest of 17 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 1 sale | ||||
| 8 Oct 2026 | 2 beds | 1,441 | 2,071 | AED 2.98M |
| Sep 2026 · 3 sales | ||||
| 24 Sep 2026 | 1 bed | 879 | 1,825 | AED 1.6M |
| 3 Sep 2026 | Studio | 449 | 1,863 | AED 836k |
| 2 Sep 2026 | 1 bed | 854 | 1,669 | AED 1.43M |
| Aug 2026 · 4 sales | ||||
| 31 Aug 2026 | Studio | 449 | 2,116 | AED 950k |
| 27 Aug 2026 | 2 beds | 1,202 | 2,016 | AED 2.42M |
| 17 Aug 2026 | 2 beds | 1,254 | 1,874 | AED 2.35M |
| 3 Aug 2026 | 1 bed | 838 | 2,247 | AED 1.88M |
| Jul 2026 · 2 sales | ||||
| 14 Jul 2026 | 1 bed | 843 | 1,519 | AED 1.28M |
| 13 Jul 2026 | 2 beds | 1,272 | 2,044 | AED 2.6M |
| Jun 2026 · 6 sales | ||||
| 25 Jun 2026 | 1 bed | 956 | 1,615 | AED 1.54M |
| 24 Jun 2026 | 2 beds | 1,272 | 1,926 | AED 2.45M |
| 22 Jun 2026 | 2 beds | 1,282 | 2,428 | AED 3.11M |
| 8 Jun 2026 | 2 beds | 1,254 | 1,915 | AED 2.4M |
| 2 Jun 2026 | 1 bed | 854 | 1,756 | AED 1.5M |
| 2 Jun 2026 | 1 bed | 912 | 1,972 | AED 1.8M |
| May 2026 · 2 sales | ||||
| 25 May 2026 | 2 beds | 1,290 | 2,053 | AED 2.65M |
| 15 May 2026 | 2 beds | 1,403 | 2,143 | AED 3.01M |
| Mar 2026 · 5 sales | ||||
| 30 Mar 2026 | 1 bed | 854 | 1,961 | AED 1.68M |
| 30 Mar 2026 | 1 bed | 843 | 1,963 | AED 1.66M |
| 18 Mar 2026 | 1 bed | 879 | 1,825 | AED 1.6M |
| 12 Mar 2026 | 1 bed | 956 | 1,816 | AED 1.74M |
| 9 Mar 2026 | 3 beds | 1,876 | 1,826 | AED 3.43M |
| Feb 2026 · 5 sales | ||||
| 23 Feb 2026 | 2 beds | 1,202 | 2,103 | AED 2.53M |
| 18 Feb 2026 | 1 bed | 927 | 1,888 | AED 1.75M |
| 10 Feb 2026 | 1 bed | 879 | 1,945 | AED 1.71M |
| 3 Feb 2026 | 1 bed | 877 | 1,881 | AED 1.65M |
| 2 Feb 2026 | 1 bed | 956 | 2,249 | AED 2.15M |
| Jan 2026 · 2 sales | ||||
| 13 Jan 2026 | 2 beds | 1,254 | 2,418 | AED 3.03M |
| 13 Jan 2026 | 1 bed | 877 | 1,603 | AED 1.41M |
| Dec 2025 · 4 sales | ||||
| 29 Dec 2025 | 2 beds | 1,450 | 2,069 | AED 3M |
| 11 Dec 2025 | 1 bed | 877 | 1,921 | AED 1.69M |
| 9 Dec 2025 | 2 beds | 1,272 | 2,241 | AED 2.85M |
| 5 Dec 2025 | 2 beds | 1,287 | 1,924 | AED 2.48M |
| Nov 2025 · 11 sales | ||||
| 25 Nov 2025 | 1 bed | 921 | 1,748 | AED 1.61M |
| 25 Nov 2025 | 2 beds | 1,333 | 1,763 | AED 2.35M |
| 25 Nov 2025 | 1 bed | 921 | 1,792 | AED 1.65M |
| 24 Nov 2025 | 2 beds | 1,290 | 1,872 | AED 2.42M |
| 24 Nov 2025 | 1 bed | 854 | 2,459 | AED 2.1M |
| 21 Nov 2025 | 1 bed | 928 | 1,724 | AED 1.6M |
| 19 Nov 2025 | 2 beds | 1,282 | 1,936 | AED 2.48M |
| 10 Nov 2025 | 3 beds | 1,878 | 2,058 | AED 3.87M |
| 10 Nov 2025 | 1 bed | 927 | 1,807 | AED 1.68M |
| 4 Nov 2025 | 1 bed | 879 | 2,403 | AED 2.11M |
| 3 Nov 2025 | 2 beds | 1,403 | 1,710 | AED 2.4M |
Homes
377 homes by size
- Studio9%34 homes · 407–476 sq ft · 4 layouts
- 1 bed57%215 homes · 817–1,115 sq ft · 15 layouts
- 2 beds30%114 homes · 1,202–1,747 sq ft · 13 layouts
- 3 beds4%14 homes · 1,878–2,191 sq ft · 2 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.4MLocation
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)39min
- Dubai Marina14min
By car. JBR Beach, the nearest beach, is 2.0 km away.
Rated schools
- EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good1.2 kmaway
- The Winchester School - DUBAIUK · Very good3.7 kmaway
Getting around
- DMCCRed Line12 minwalk
- Jumeirah Lakes TowersDubai Tram14 minwalk
- Al YalayisEtihad Rail5.9 kmaway
- Al Maktoum AirportHigh-speed rail · planned19 kmaway
- Al Maktoum InternationalDWC19 kmaway
Area guideJLTFinished homesAED 1,451/sq ft1-bed rentAED 82k/yrGross yieldEstimate7.1%Developer
- 18 finished
- 25 being built, on time
- 7 past their planned date
- 1 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- Ellington Properties Development L.L.C
Also being built by Ellington
| Project | Handover | Built |
|---|---|---|
| The PortmanJVC | Q3 2025Past planned date | 79% |
| UH East BY EllingtonJLT | Q1 2026Past planned date | 47% |
| The QuaysideBusiness Bay | Q1 2026Past planned date | 55% |
| The Waterside Villas BY EllingtonMajan | Q2 2026Past planned date | 32% |
| The Lakeview Villas BY EllingtonMajan | Q3 2026Past planned date | 10% |
More questions about UH West by Ellington
From AED 1.66M for a 879 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 2.5M.
Q1 2026, the planned date in DLD’s register.
No. It is 8 months past its planned date, and was 71% built at DLD’s last inspection on 26 Oct 2026.
377 homes on 37 floors: 34 studios of 407–476 sq ft, 215 1-bed flats of 817–1,115 sq ft, 114 2-bed flats of 1,202–1,747 sq ft and 14 3-bed flats of 1,878–2,191 sq ft.
About AED 58k a year for a studio, AED 82k for a 1-bed, AED 120k for a 2-bed and AED 168k for a 3-bed in JLT, a gross yield of about 7.1% Estimate.
Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.4M.
In Jumeirah Lake Towers, 26 minutes by car to Downtown Dubai and 39 to Dubai Airport (DXB). DMCC Metro station on the Red Line is a 12-minute walk.
More nearby
Off-plan nearby
- Saba 4From AED 2.42M30% built · Planned Q2 2027
- UH East by EllingtonFrom AED 985k47% built · Past planned date
- Eltiera HeightsFrom AED 2.11M3% built · Planned Q4 2028
- Serenia District - WestFrom AED 2.1M3% built · Planned Q4 2028
- Eltiera ViewsFrom AED 2.06M0% built · Planned Q4 2029
- Viewz 2 by DanubeFrom AED 1.02M65% built · Past planned date
Finished buildings nearby
Typical next door AED 1,724/sq ft · 12 buildings within a 10-minute walk
- Bonnington Tower Hotel & Residence Dubai1,767AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Gold Crest Views 21,683AED/sq ft1-bed rent AED 78k/yr · 10-minute walk
- Orra The Embankment - Tower 11,415AED/sq ft1-bed rent AED 110k/yr · 10-minute walk
- Icon 21,281AED/sq ftNot enough rents · 10-minute walk
- MBL Royal2,088AED/sq ft1-bed rent AED 115k/yr · 10-minute walk
- MBL Residence2,023AED/sq ft1-bed rent AED 100k/yr · 10-minute walk
- Concorde Tower1,252AED/sq ft1-bed rent AED 77k/yr · 10-minute walk
- Me Do Re2,228AED/sq ft1-bed rent AED 125k/yr · 10-minute walk
- Dubai Star1,378AED/sq ft1-bed rent AED 80k/yr · 10-minute walk
- Jumeirah Heights Clusters1,765AED/sq ftNot enough rents · 10-minute walk
- Gold Crest Executive1,823AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Icon 11,213AED/sq ftNot enough rents · 10-minute walk
- New Dubai Gate 21,374AED/sq ft1-bed rent AED 83k/yr
- Lake City Tower1,339AED/sq ft1-bed rent AED 75k/yr
- Lake Terrace1,596AED/sq ft1-bed rent AED 80k/yr
- Global Lake View1,378AED/sq ft1-bed rent AED 70k/yr