
Serenia District - West
Jumeirah IslandsPalma
Serenia District - West is an off-plan project by Palma in Jumeirah Islands, with 419 homes on 42 floors. DLD’s last inspection, on 26 Oct 2026, found it 3% built.
- Built
- 3%
- Handover
- Q4 2028
- Since launch
- Down 3%1 bed price per sq ft
- Homes
- 419
About
West Residence at Serenia District is a 42-floor building of 419 homes in Jumeirah Lake Towers, beside Jumeirah Islands. Most homes are 1-bed flats, with 2-bed and 3-bed flats, their interiors drawn from Japanese design ideas. The Serenia Signature Clubhouse inside the building holds a wellness centre, an infinity pool and shops.
- Clubhouse inside the building
- Japanese-inspired interiors
- Views of Jumeirah Islands
Shared facilities
- Serenia Signature Clubhouse
- Infinity pool
- Wellness centre
- Shops
Progress
- Q1 2025Building started
- Mar–May 2025Launch sales · 239
- Oct 2026Last inspection · 3%
- Q4 2028Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 2.1M840 sq ft · 2,456 AED/sq ft · 49 sales
- 2 beds
- Not enough sales1 sale
- 3 beds
- Not enough sales1 sale
Against 17 JLT off-plan projects with 10 or more sales
- Lowest1,053AED/sq ft
- Serenia District - West2,441AED/sq ft
- Highest3,104AED/sq ft
9th lowest of 17 · AED per sq ft in 12 months
Latest sales
Plus 3 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 9 Nov 2026 | 1 bed New | 853 | 2,559 | AED 2.18M |
| 9 Nov 2026 | 1 bed New | 830 | 2,748 | AED 2.28M |
| 3 Nov 2026 | 1 bed New | 834 | 2,538 | AED 2.12M |
| Oct 2026 · 4 sales | ||||
| 27 Oct 2026 | 1 bed | 853 | 2,246 | AED 1.92M |
| 27 Oct 2026 | 1 bed | 878 | 2,534 | AED 2.23M |
| 26 Oct 2026 | 1 bed | 842 | 2,501 | AED 2.11M |
| 6 Oct 2026 | 1 bed | 836 | 2,283 | AED 1.91M |
| Sep 2026 · 1 sale | ||||
| 3 Sep 2026 | 1 bed | 830 | 2,520 | AED 2.09M |
| Aug 2026 · 1 sale | ||||
| 25 Aug 2026 | 1 bed | 842 | 2,480 | AED 2.09M |
| Jul 2026 · 2 sales | ||||
| 29 Jul 2026 | 1 bed | 842 | 2,853 | AED 2.4M |
| 9 Jul 2026 | 3 beds | 2,642 | 2,329 | AED 6.15M |
| Jun 2026 · 2 sales | ||||
| 24 Jun 2026 | 1 bed | 836 | 2,456 | AED 2.05M |
| 11 Jun 2026 | 2 beds | 1,457 | 2,196 | AED 3.2M |
| May 2026 · 3 sales | ||||
| 26 May 2026 | 1 bed | 842 | 2,521 | AED 2.12M |
| 21 May 2026 | 1 bed | 853 | 2,479 | AED 2.12M |
| 13 May 2026 | 1 bed | 865 | 2,642 | AED 2.29M |
| Apr 2026 · 4 sales | ||||
| 27 Apr 2026 | 1 bed | 840 | 2,437 | AED 2.05M |
| 20 Apr 2026 | 1 bed | 842 | 2,437 | AED 2.05M |
| 20 Apr 2026 | 1 bed | 842 | 2,644 | AED 2.23M |
| 3 Apr 2026 | 1 bed | 830 | 2,439 | AED 2.02M |
| Mar 2026 · 3 sales | ||||
| 27 Mar 2026 | 1 bed | 830 | 2,645 | AED 2.2M |
| 26 Mar 2026 | 1 bed | 840 | 2,418 | AED 2.03M |
| 13 Mar 2026 | 1 bed | 840 | 2,520 | AED 2.12M |
| Feb 2026 · 9 sales | ||||
| 18 Feb 2026 | 1 bed | 853 | 2,837 | AED 2.42M |
| 18 Feb 2026 | 1 bed | 825 | 2,543 | AED 2.1M |
| 16 Feb 2026 | 1 bed | 830 | 2,340 | AED 1.94M |
| 10 Feb 2026 | 1 bed | 840 | 2,837 | AED 2.38M |
| 10 Feb 2026 | 1 bed | 830 | 2,500 | AED 2.08M |
| 10 Feb 2026 | 1 bed | 840 | 2,381 | AED 2M |
| 4 Feb 2026 | 1 bed | 830 | 2,561 | AED 2.13M |
| 4 Feb 2026 | 1 bed | 836 | 2,438 | AED 2.04M |
| 4 Feb 2026 | 1 bed | 899 | 2,379 | AED 2.14M |
| Jan 2026 · 12 sales | ||||
| 26 Jan 2026 | 1 bed | 825 | 2,503 | AED 2.07M |
| 26 Jan 2026 | 1 bed | 825 | 2,286 | AED 1.89M |
| 19 Jan 2026 | 1 bed | 834 | 2,591 | AED 2.16M |
| 12 Jan 2026 | 1 bed | 895 | 2,350 | AED 2.1M |
| 12 Jan 2026 | 1 bed | 834 | 2,618 | AED 2.18M |
| 12 Jan 2026 | 1 bed | 836 | 2,419 | AED 2.02M |
| 9 Jan 2026 | 1 bed | 830 | 2,248 | AED 1.87M |
| 9 Jan 2026 | 1 bed | 830 | 2,645 | AED 2.2M |
| 9 Jan 2026 | 1 bed | 825 | 2,441 | AED 2.01M |
| 7 Jan 2026 | 1 bed | 836 | 2,541 | AED 2.12M |
| 7 Jan 2026 | 1 bed | 830 | 2,542 | AED 2.11M |
| 7 Jan 2026 | 1 bed | 899 | 2,349 | AED 2.11M |
| Dec 2025 · 7 sales | ||||
| 18 Dec 2025 | 1 bed | 899 | 2,477 | AED 2.23M |
| 15 Dec 2025 | 1 bed | 840 | 2,616 | AED 2.2M |
| 10 Dec 2025 | 1 bed | 895 | 2,380 | AED 2.13M |
| 10 Dec 2025 | 1 bed | 834 | 2,268 | AED 1.89M |
| 10 Dec 2025 | 1 bed | 853 | 2,400 | AED 2.05M |
| 1 Dec 2025 | 1 bed | 834 | 2,284 | AED 1.91M |
Homes
419 homes by size
- 1 bed60%252 homes · 825–3,034 sq ft · 11 layouts
- 2 beds30%125 homes · 1,303–2,557 sq ft · 7 layouts
- 3 beds10%42 homes · 2,662–4,292 sq ft · 2 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.1MLocation
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)39min
- Dubai Marina14min
By car. JBR Beach, the nearest beach, is 2.1 km away.
Rated schools
- EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good1.1 kmaway
- Dubai International AcademyInternational Baccalaureate · Outstanding3.6 kmaway
Getting around
- DMCCRed Line14 minwalk
- Jumeirah Lakes TowersDubai Tram16 minwalk
- Al YalayisEtihad Rail5.8 kmaway
- Al Maktoum AirportHigh-speed rail · planned19 kmaway
- Al Maktoum InternationalDWC19 kmaway
Area guideJLTFinished homesAED 1,451/sq ft1-bed rentAED 82k/yrGross yieldEstimate7.1%Developer
- 2 finished
- 2 being built, on time
- Escrow bank
- Sharjah Islamic Bank
- Legal name
- Palma Homes Real Estate Development L.L.C
More by Palma
| Project | Handover | Built |
|---|---|---|
| SERENIA DISTRICT - EASTJLT | Q2 2030Being built | 1% |
| Serenia LivingPalm Jumeirah | Q4 2025Finished | |
| Serenia Residences the PalmPalm Jumeirah | Q4 2017Finished |
More questions about Serenia District - West
From AED 2.1M for a 840 sq ft 1-bed, the lowest typical price paid in the 12 months.
Q4 2028, the planned date in DLD’s register.
It is not past its planned date. It was 3% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.
419 homes on 42 floors: 252 1-bed flats of 825–3,034 sq ft, 125 2-bed flats of 1,303–2,557 sq ft and 42 3-bed flats of 2,662–4,292 sq ft.
Down 3% for 1-bed flats, per sq ft.
About AED 82k a year for a 1-bed, AED 120k for a 2-bed and AED 168k for a 3-bed in JLT, a gross yield of about 7.1% Estimate.
Of Palma’s 4 projects on DLD’s record, 2 are finished. Of the 2 being built, none is past its planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.1M.
In Jumeirah Islands, Jumeirah Lake Towers, 26 minutes by car to Downtown Dubai and 39 to Dubai Airport (DXB). DMCC Metro station on the Red Line is a 14-minute walk.
More nearby
Off-plan nearby
- Eltiera HeightsFrom AED 2.11M3% built · Planned Q4 2028
- UH East by EllingtonFrom AED 985k47% built · Past planned date
- UH West by EllingtonFrom AED 1.66M71% built · Past planned date
- Serenia District - EastFrom AED 1.97M1% built · Planned Q2 2030
- Saba 4From AED 2.42M30% built · Planned Q2 2027
- Eltiera ViewsFrom AED 2.06M0% built · Planned Q4 2029
Finished buildings nearby
Typical next door AED 1,683/sq ft · 11 buildings within a 10-minute walk
- Bonnington Tower Hotel & Residence Dubai1,767AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Orra The Embankment - Tower 11,415AED/sq ft1-bed rent AED 110k/yr · 10-minute walk
- Gold Crest Views 21,683AED/sq ft1-bed rent AED 78k/yr · 10-minute walk
- Concorde Tower1,252AED/sq ft1-bed rent AED 77k/yr · 10-minute walk
- Jumeirah Heights Clusters1,765AED/sq ftNot enough rents · 10-minute walk
- Icon 21,281AED/sq ftNot enough rents · 10-minute walk
- MBL Royal2,088AED/sq ft1-bed rent AED 115k/yr · 10-minute walk
- MBL Residence2,023AED/sq ft1-bed rent AED 100k/yr · 10-minute walk
- Me Do Re2,228AED/sq ft1-bed rent AED 125k/yr · 10-minute walk
- Dubai Star1,378AED/sq ft1-bed rent AED 80k/yr · 10-minute walk
- Lake Terrace1,596AED/sq ft1-bed rent AED 80k/yr · 10-minute walk
- New Dubai Gate 21,374AED/sq ft1-bed rent AED 83k/yr
- Lake City Tower1,339AED/sq ft1-bed rent AED 75k/yr
- Global Lake View1,378AED/sq ft1-bed rent AED 70k/yr
- Icon 11,213AED/sq ftNot enough rents