Skip to content

Eltiera Heights

Jumeirah IslandsEllington

FromAED 2.11M1 bed · 822 sq ft

Eltiera Heights is an off-plan project by Ellington in Jumeirah Islands, with 355 homes on 35 floors. DLD’s last inspection, on 26 Oct 2026, found it 3% built.

Built
3%
Handover
Q4 2028
Sales in 12 months
235
Homes
355

About

Eltiera Heights is a 35-floor building of 355 homes in Jumeirah Lake Towers, on the edge of Jumeirah Islands, with a flowing curved design. Most homes are 1-bed and 2-bed flats, with some 3-bed flats and a few penthouses. Residents share an infinity-edge pool, a water garden and steam and sauna rooms, with a bicycle repair station.

  • Beside Jumeirah Islands
  • Infinity-edge pool
  • A few penthouses

Shared facilities

  • Infinity-edge pool
  • Water garden
  • Steam and sauna rooms
  • Fitness area
  • Games station
  • Outdoor kids’ play area
  • Bicycle parking and repair station
  • Sun loungers area

Progress

3%built
  1. Q2 2025Building started
  2. Oct 2026Last inspection · 3%
  3. Q4 2028Planned handover

Prices

Price per sq ft

2,538 AED/sq ft235 sales in 12 months

Typical price by size

1 bed
AED 2.11M822 sq ft · 2,558 AED/sq ft · 121 sales
2 beds
AED 3.25M1,254 sq ft · 2,519 AED/sq ft · 85 sales
3 beds
AED 4.07M1,641 sq ft · 2,475 AED/sq ft · 27 sales
4+ beds
Not enough sales2 sales

Against 17 JLT off-plan projects with 10 or more sales

  • Lowest1,053AED/sq ft
  • Typical2,441AED/sq ft
  • Eltiera Heights2,538AED/sq ft
  • Highest3,104AED/sq ft

5th highest of 17 · AED per sq ft in 12 months

Latest sales

Newest first
235 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 3 sales
27 Oct 20262 beds1,2512,796AED 3.5M
20 Oct 20262 beds1,2512,513AED 3.14M
13 Oct 20262 beds1,3692,411AED 3.3M
Sep 2026 · 3 sales
30 Sep 20261 bed8202,558AED 2.1M
23 Sep 20262 beds1,2512,551AED 3.19M
2 Sep 20262 beds1,3692,688AED 3.68M
Aug 2026 · 1 sale
20 Aug 20262 beds1,2382,535AED 3.14M
Jul 2026 · 5 sales
30 Jul 20261 bed8442,430AED 2.05M
29 Jul 20261 bed8262,491AED 2.06M
23 Jul 20261 bed8222,475AED 2.03M
16 Jul 20263 beds1,9482,335AED 4.55M
16 Jul 20263 beds1,6412,475AED 4.06M
Jun 2026 · 2 sales
8 Jun 20262 beds1,2382,655AED 3.29M
4 Jun 20261 bed8442,379AED 2.01M
May 2026 · 1 sale
5 May 20262 beds1,3692,467AED 3.38M
Apr 2026 · 8 sales
30 Apr 20263 beds1,6412,328AED 3.82M
30 Apr 20261 bed8222,780AED 2.28M
29 Apr 20261 bed8222,561AED 2.1M
27 Apr 20261 bed8222,546AED 2.09M
27 Apr 20261 bed8262,528AED 2.09M
20 Apr 20262 beds1,2552,468AED 3.1M
14 Apr 20262 beds1,2542,583AED 3.24M
14 Apr 20261 bed8222,665AED 2.19M
Mar 2026 · 7 sales
25 Mar 20262 beds1,2382,379AED 2.94M
24 Mar 20262 beds1,3692,645AED 3.62M
24 Mar 20262 beds1,2542,867AED 3.6M
24 Mar 20261 bed8222,557AED 2.1M
12 Mar 20261 bed8442,435AED 2.05M
12 Mar 20261 bed8262,405AED 1.99M
2 Mar 20261 bed8362,530AED 2.11M
Feb 2026 · 11 sales
27 Feb 20261 bed8442,616AED 2.21M
24 Feb 20261 bed8222,697AED 2.22M
24 Feb 20262 beds1,3692,323AED 3.18M
23 Feb 20262 beds1,3692,687AED 3.68M
23 Feb 20261 bed8222,506AED 2.06M
23 Feb 20261 bed8262,706AED 2.23M
19 Feb 20262 beds1,2512,355AED 2.95M
13 Feb 20261 bed8202,450AED 2.01M
12 Feb 20262 beds1,2512,409AED 3.01M
10 Feb 20261 bed8222,629AED 2.16M
2 Feb 20261 bed8362,405AED 2.01M
Jan 2026 · 30 sales
30 Jan 20261 bed8222,538AED 2.09M
30 Jan 20261 bed8442,669AED 2.25M
29 Jan 20262 beds1,2552,423AED 3.04M
29 Jan 20261 bed8262,715AED 2.24M
21 Jan 20263 beds1,6412,480AED 4.07M
21 Jan 20262 beds1,3692,748AED 3.76M
21 Jan 20264+ beds5,8052,566AED 14.89M
21 Jan 20261 bed8222,556AED 2.1M
19 Jan 20262 beds1,5012,388AED 3.58M

Homes

355 homes by size

  • 1 bed47%168 homes · 822–903 sq ft · 5 layouts
  • 2 beds43%151 homes · 1,238–1,501 sq ft · 6 layouts
  • 3 beds10%34 homes · 1,641–1,948 sq ft · 2 layouts
  • 4 beds1%2 homes · 5,805–6,085 sq ft · 2 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.11M

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)39min
  • Dubai Marina14min

By car. JBR Beach, the nearest beach, is 2.2 km away.

Rated schools

  • EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good1.1 kmaway
  • The Winchester School - DUBAIUK · Very good3.7 kmaway

Getting around

  • DMCCRed Line14 minwalk
  • Jumeirah Lakes TowersDubai Tram16 minwalk
  • Al YalayisEtihad Rail5.8 kmaway
  • Al Maktoum AirportHigh-speed rail · planned19 kmaway
  • Al Maktoum InternationalDWC19 kmaway
Area guideJLTFinished homesAED 1,451/sq ft1-bed rentAED 82k/yrGross yieldEstimate7.1%

Developer

  • 18 finished
  • 25 being built, on time
  • 7 past their planned date
  • 1 not started
Escrow bank
National Bank of Ras Al Khaimah
Legal name
Ellington Pcfc Developers L.L.C

Also being built by Ellington

Ellington’s other projects
ProjectHandoverBuilt
The PortmanJVCQ3 2025Past planned date79%
UH West BY EllingtonJLTQ1 2026Past planned date71%
UH East BY EllingtonJLTQ1 2026Past planned date47%
The QuaysideBusiness BayQ1 2026Past planned date55%
The Waterside Villas BY EllingtonMajanQ2 2026Past planned date32%
All 51 Ellington projects
Questions

More questions about Eltiera Heights

From AED 2.11M for a 822 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 3.25M and 3-bed flats sell for about AED 4.07M.

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 3% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

355 homes on 35 floors: 168 1-bed flats of 822–903 sq ft, 151 2-bed flats of 1,238–1,501 sq ft, 34 3-bed flats of 1,641–1,948 sq ft and 2 4+ bed flats of 5,805–6,085 sq ft.

About AED 82k a year for a 1-bed, AED 120k for a 2-bed, AED 168k for a 3-bed and AED 285k for a 4+ bed in JLT, a gross yield of about 7.1% Estimate.

Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.11M.

In Jumeirah Islands, Jumeirah Lake Towers, 26 minutes by car to Downtown Dubai and 39 to Dubai Airport (DXB). DMCC Metro station on the Red Line is a 14-minute walk.

More nearby

How the numbers work

FromAED 2.11MSee it on the map