Skip to content

The Portman

Jumeirah Village CircleEllington

FromAED 975k1 bed · 768 sq ft

The Portman is an off-plan project by Ellington in Jumeirah Village Circle, with 166 homes on 16 floors. DLD’s last inspection, on 26 Oct 2026, found it 79% built.

Built
79%
Handover
Q3 2025
Since launch
Up 15%1 bed price per sq ft
Homes
166

About

The Portman is a 16-floor building of 166 homes in Jumeirah Village Circle, one of several Ellington buildings in the area. Most homes are 1-bed flats, with some studios and 2-bed flats. Residents share a leisure pool, a lobby lounge with a shared work table and indoor and outdoor play areas for children.

  • Mostly 1-bed flats
  • Bicycle parking and wash area
  • Indoor and outdoor kids’ play

Shared facilities

  • Lobby lounge
  • Shared work table
  • Leisure pool
  • Fitness studio
  • Indoor and outdoor kids’ play
  • Outdoor dining area
  • Activity area
  • BBQ area

Progress

79%built
  1. Q4 2022Building started
  2. Feb–Apr 2023Launch sales · 66
  3. Q3 2025Planned handover · passed
  4. Oct 2026Last inspection · 79%
14 months past the planned date

Prices

Price per sq ft

1,243 AED/sq ft18 sales in 12 months

Typical price by size

1 bed
AED 975k768 sq ft · 14 sales
2 beds
AED 1.11M971 sq ft · 4 sales

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • The Portman1,243AED/sq ft
  • Typical1,497AED/sq ft
  • Highest2,276AED/sq ft

6th lowest of 99 · AED per sq ft in 12 months

Latest sales

Plus 1 newer sale, newest first
18 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
19 Nov 20262 beds New9711,287AED 1.25M
Oct 2026 · 5 sales
19 Oct 20261 bed744902AED 671k
14 Oct 20261 bed768901AED 692k
14 Oct 20261 bed768901AED 692k
13 Oct 20261 bed820901AED 739k
13 Oct 20262 beds971901AED 875k
Sep 2026 · 2 sales
30 Sep 20261 bed7441,358AED 1.01M
18 Sep 20261 bed7681,165AED 895k
Aug 2026 · 4 sales
19 Aug 20261 bed6771,514AED 1.03M
13 Aug 20261 bed7121,320AED 940k
5 Aug 20262 beds9711,102AED 1.07M
4 Aug 20261 bed8201,114AED 914k
Jun 2026 · 1 sale
29 Jun 20261 bed7441,371AED 1.02M
May 2026 · 1 sale
21 May 20261 bed7681,367AED 1.05M
Apr 2026 · 1 sale
7 Apr 20262 beds9711,674AED 1.63M
Mar 2026 · 2 sales
23 Mar 20261 bed6771,521AED 1.03M
12 Mar 20261 bed8201,386AED 1.14M
Feb 2026 · 1 sale
23 Feb 20261 bed8201,366AED 1.12M
Nov 2025 · 1 sale
10 Nov 20252 beds1,0921,049AED 1.15M

Homes

166 homes by size

  • Studio18%30 homes · 407–433 sq ft · 2 layouts
  • 1 bed53%88 homes · 677–820 sq ft · 5 layouts
  • 2 beds29%48 homes · 971–1,510 sq ft · 6 layouts

Location

Drive times

  • Downtown Dubai25min
  • Dubai Airport (DXB)34min
  • Dubai Marina20min

By car. JBR Beach, the nearest beach, is 9.3 km away.

Rated schools

  • Nord Anglia International SchoolUK · Outstanding0.9 kmaway
  • JSS International SchoolIndian · Very good2.1 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 203220 minwalk
  • Al YalayisEtihad Rail6.9 kmaway
  • Dubai Internet CityRed Line6.9 kmaway
  • Al Maktoum AirportHigh-speed rail · planned19 kmaway
  • Al Maktoum InternationalDWC19 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 18 finished
  • 25 being built, on time
  • 7 past their planned date
  • 1 not started
Escrow bank
Abu Dhabi Commercial Bank
Legal name
Ellington Properties Development L.L.C

Also being built by Ellington

Ellington’s other projects
ProjectHandoverBuilt
UH West BY EllingtonJLTQ1 2026Past planned date71%
UH East BY EllingtonJLTQ1 2026Past planned date47%
The QuaysideBusiness BayQ1 2026Past planned date55%
The Waterside Villas BY EllingtonMajanQ2 2026Past planned date32%
The Lakeview Villas BY EllingtonMajanQ3 2026Past planned date10%
All 51 Ellington projects
Questions

More questions about The Portman

From AED 975k for a 768 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 1.11M.

Q3 2025, the planned date in DLD’s register.

No. It is 14 months past its planned date, and was 79% built at DLD’s last inspection on 26 Oct 2026.

166 homes on 16 floors: 30 studios of 407–433 sq ft, 88 1-bed flats of 677–820 sq ft and 48 2-bed flats of 971–1,510 sq ft.

Up 15% for 1-bed flats, per sq ft. Against the launch sales of Feb 2023 – Apr 2023: 2-bed flats down 7%.

About AED 48k a year for a studio, AED 71k for a 1-bed and AED 100k for a 2-bed in JVC, a gross yield of about 7.3% Estimate.

Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.

In Jumeirah Village Circle, 25 minutes by car to Downtown Dubai and 34 to Dubai Airport (DXB). Dubai Internet City Metro station on the Red Line is 6.9 km away.

More nearby

How the numbers work

FromAED 975kSee it on the map