
Palace Residences Hillside A
Dubai Hills EstateEmaar
Palace Residences Hillside A is an off-plan project by Emaar in Dubai Hills Estate, with 359 homes on 20 floors. DLD’s last inspection, on 26 Oct 2026, found it 8% built.
- Built
- 8%
- Handover
- Q2 2029
- Sales in 12 months
- 347
- Homes
- 359
About
Palace Residences Hillside is a 20-floor building of 359 homes in Dubai Hills Estate, near Hillside Park and Dubai Hills Park. Homes run from 1-bed to 3-bed flats, with 2-bed flats the largest group, plus some 3-bed townhouses, all branded by Palace. Residents share padel courts, an outdoor gym and a pool lined with shaded cabanas.
- Palace-branded homes
- Padel courts and outdoor gym
- Near Hillside Park
Shared facilities
- Pool
- Shaded cabanas
- Padel courts
- Outdoor gym
- Table tennis and badminton
- Multi-sport court
- Running track
- Lawn
Progress
- Q3 2025Building started
- Oct 2026Last inspection · 8%
- Q2 2029Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.88M681 sq ft · 2,755 AED/sq ft · 146 sales
- 2 beds
- AED 2.67M1,062 sq ft · 2,428 AED/sq ft · 166 sales
- 3 beds
- AED 5M1,882 sq ft · 2,639 AED/sq ft · 35 sales
Against 14 Hills Estate off-plan projects with 10 or more sales
- Lowest2,135AED/sq ft
- Typical2,439AED/sq ft
- Palace Residences Hillside A2,595AED/sq ft
- Highest2,800AED/sq ft
3rd highest of 14 · AED per sq ft in 12 months
Latest sales
Plus 3 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 17 Nov 2026 | 3 beds New | 1,882 | 2,619 | AED 4.93M |
| 3 Nov 2026 | 3 beds New | 1,882 | 2,537 | AED 4.77M |
| 3 Nov 2026 | 3 beds New | 2,623 | 2,416 | AED 6.34M |
| Oct 2026 · 2 sales | ||||
| 28 Oct 2026 | 3 beds | 1,882 | 2,629 | AED 4.95M |
| 23 Oct 2026 | 1 bed | 681 | 2,947 | AED 2.01M |
| Sep 2026 · 10 sales | ||||
| 10 Sep 2026 | 3 beds | 1,882 | 2,571 | AED 4.84M |
| 10 Sep 2026 | 2 beds | 1,062 | 2,371 | AED 2.52M |
| 10 Sep 2026 | 3 beds | 1,882 | 2,621 | AED 4.93M |
| 10 Sep 2026 | 3 beds | 1,882 | 2,591 | AED 4.88M |
| 10 Sep 2026 | 3 beds | 1,882 | 2,639 | AED 4.97M |
| 10 Sep 2026 | 3 beds | 1,882 | 2,596 | AED 4.89M |
| 10 Sep 2026 | 3 beds | 1,882 | 2,538 | AED 4.78M |
| 10 Sep 2026 | 3 beds | 1,882 | 2,616 | AED 4.92M |
| 9 Sep 2026 | 3 beds | 1,882 | 2,590 | AED 4.87M |
| 7 Sep 2026 | 2 beds | 1,062 | 2,501 | AED 2.66M |
| Aug 2026 · 3 sales | ||||
| 18 Aug 2026 | 3 beds | 1,882 | 2,648 | AED 4.98M |
| 5 Aug 2026 | 3 beds | 2,622 | 2,416 | AED 6.34M |
| 3 Aug 2026 | 3 beds | 1,882 | 2,663 | AED 5.01M |
| Jul 2026 · 3 sales | ||||
| 30 Jul 2026 | 3 beds | 1,882 | 2,653 | AED 4.99M |
| 14 Jul 2026 | 2 beds | 1,062 | 2,799 | AED 2.97M |
| 6 Jul 2026 | 2 beds | 1,139 | 2,233 | AED 2.54M |
| May 2026 · 1 sale | ||||
| 19 May 2026 | 2 beds | 1,147 | 2,407 | AED 2.76M |
| Apr 2026 · 7 sales | ||||
| 20 Apr 2026 | 1 bed | 685 | 2,540 | AED 1.74M |
| 16 Apr 2026 | 1 bed | 685 | 2,585 | AED 1.77M |
| 16 Apr 2026 | 3 beds | 2,623 | 2,416 | AED 6.34M |
| 8 Apr 2026 | 3 beds | 2,622 | 2,417 | AED 6.34M |
| 7 Apr 2026 | 3 beds | 1,882 | 2,659 | AED 5M |
| 3 Apr 2026 | 1 bed | 676 | 2,525 | AED 1.71M |
| 3 Apr 2026 | 1 bed | 681 | 2,671 | AED 1.82M |
| Mar 2026 · 17 sales | ||||
| 31 Mar 2026 | 2 beds | 1,141 | 2,237 | AED 2.55M |
| 31 Mar 2026 | 1 bed | 768 | 2,544 | AED 1.95M |
| 31 Mar 2026 | 2 beds | 1,062 | 2,578 | AED 2.74M |
| 30 Mar 2026 | 1 bed | 681 | 2,677 | AED 1.82M |
| 30 Mar 2026 | 1 bed | 681 | 2,774 | AED 1.89M |
| 30 Mar 2026 | 1 bed | 681 | 2,915 | AED 1.98M |
| 30 Mar 2026 | 2 beds | 1,057 | 2,377 | AED 2.51M |
| 30 Mar 2026 | 2 beds | 1,060 | 2,449 | AED 2.6M |
| 30 Mar 2026 | 1 bed | 681 | 2,857 | AED 1.95M |
| 30 Mar 2026 | 1 bed | 681 | 2,623 | AED 1.79M |
| 30 Mar 2026 | 1 bed | 681 | 2,900 | AED 1.97M |
| 18 Mar 2026 | 1 bed | 681 | 2,832 | AED 1.93M |
| 17 Mar 2026 | 2 beds | 1,062 | 2,333 | AED 2.48M |
| 17 Mar 2026 | 2 beds | 1,065 | 2,371 | AED 2.52M |
| 12 Mar 2026 | 2 beds | 1,062 | 2,501 | AED 2.66M |
| 9 Mar 2026 | 1 bed | 681 | 2,759 | AED 1.88M |
| 9 Mar 2026 | 2 beds | 1,062 | 2,718 | AED 2.89M |
| Feb 2026 · 41 sales | ||||
| 26 Feb 2026 | 2 beds | 1,147 | 2,154 | AED 2.47M |
| 26 Feb 2026 | 1 bed | 685 | 2,505 | AED 1.72M |
| 26 Feb 2026 | 2 beds | 1,147 | 2,264 | AED 2.6M |
| 26 Feb 2026 | 2 beds | 1,062 | 2,290 | AED 2.43M |
Homes
359 homes by size
- 1 bed42%149 homes · 681–768 sq ft · 3 layouts
- 2 beds47%167 homes · 1,062–1,191 sq ft · 3 layouts
- 3 beds12%43 homes · 1,882–2,623 sq ft · 3 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.62MLocation
Drive times
- Downtown Dubai20min
- Dubai Airport (DXB)30min
- Dubai Marina22min
By car. Jumeirah Public Beach, the nearest beach, is 6.7 km away.
Rated schools
- Emirates International SchoolUK · Very good4.5 kmaway
- GEMS WORLD ACADEMYInternational Baccalaureate · Very good4.7 kmaway
Getting around
- Dubai HillsGold Line · opens 203228 minwalk
- EquitiRed Line4.4 kmaway
- MeydanEtihad Rail · planned7.2 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB19 kmaway
Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Dubai Hills Estate L.L.C
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Palace Residences Hillside A
From AED 1.88M for a 681 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 2.67M and 3-bed flats sell for about AED 5M.
Q2 2029, the planned date in DLD’s register.
It is not past its planned date. It was 8% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
359 homes on 20 floors: 149 1-bed flats of 681–768 sq ft, 167 2-bed flats of 1,062–1,191 sq ft and 43 3-bed flats of 1,882–2,623 sq ft.
About AED 90k a year for a 1-bed, AED 140k for a 2-bed and AED 250k for a 3-bed in Hills Estate, a gross yield of about 6.1% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.62M.
In Dubai Hills Estate, 20 minutes by car to Downtown Dubai and 30 to Dubai Airport (DXB). Equiti Metro station on the Red Line is 4.4 km away.
More nearby
Off-plan nearby
- Palace Residences Hillside BNo sales0% built · Planned Q4 2029
- ParkwoodFrom AED 1.84M15% built · Planned Q1 2029
- Vida Residences HillsideFrom AED 1.94M10% built · Planned Q2 2029
- HillsedgeFrom AED 1.87M26% built · Planned Q1 2029
- Soho The BerkeleyNo sales46% built · Planned Q4 2026
- Ellington House IVFrom AED 2.08M70% built · Handover not on record
Finished buildings nearby
Typical next door AED 2,330/sq ft · 9 buildings within a 10-minute walk
- Socio2,484AED/sq ft1-bed rent AED 82k/yr · 10-minute walk
- Park Heights II2,108AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Park Ridge2,435AED/sq ft1-bed rent AED 95k/yr · 10-minute walk
- Prive Residence2,046AED/sq ft1-bed rent AED 95k/yr · 10-minute walk
- Sway Residences1,964AED/sq ftNot enough rents · 10-minute walk
- Hills Park2,229AED/sq ft1-bed rent AED 80k/yr · 10-minute walk
- The Grove by Iman2,758AED/sq ft1-bed rent AED 125k/yr · 10-minute walk
- Acacia at Park Heights2,330AED/sq ft1-bed rent AED 120k/yr · 10-minute walk
- Mulberry at Park Heights2,485AED/sq ft1-bed rent AED 115k/yr · 10-minute walk
- Collective2,372AED/sq ft1-bed rent AED 75k/yr
- Golf Residences by Fortimo2,058AED/sq ft1-bed rent AED 125k/yr
- Ellington House2,859AED/sq ft1-bed rent AED 145k/yr
- Golf Ville2,298AED/sq ft1-bed rent AED 75k/yr