Skip to content

Palace Residences Hillside B

Dubai Hills EstateEmaar

FromAED 1.96MDeveloper’s price

Palace Residences Hillside B is an off-plan project by Emaar in Dubai Hills Estate, with 287 homes on 18 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q4 2029
Sales in 12 months
1
Homes
287

About

Palace Residences Hillside B is an 18-floor building of 287 homes in Dubai Hills Estate, beside Hillside Park. Most homes are 1-bed flats, with 2-bed and 3-bed flats and some 3-bed townhouses, all Palace-branded with Arabian-style interiors. A sky bridge holding an amenity deck links it to its twin, and residents also share padel courts and a pool with cabanas.

  • Sky bridge to its twin building
  • Palace-branded homes
  • Beside Hillside Park

Shared facilities

  • Resort-style pool
  • Sky bridge amenity deck
  • Padel courts
  • Outdoor gym
  • Shaded cabanas
  • Multipurpose hall
  • Kids’ play area

Progress

0%built
  1. Q1 2026Building started
  2. Oct 2026Last inspection · 0%
  3. Q4 2029Planned handover

Prices

Typical price by size

Typical price by size · Nov 2025 – Oct 2026
SizeTypical priceAED/sq ftSales
1 bedNot enough sales1

Against 14 Hills Estate off-plan projects with 10 or more sales

  • Lowest2,135AED/sq ft
  • Typical2,439AED/sq ft
  • Palace Residences Hillside B2,620AED/sq ft
  • Highest2,800AED/sq ft

Latest sales

Newest first
1 off-plan sale · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Apr 2026 · 1 sale
7 Apr 20261 bed7422,620AED 1.94M

Homes

287 homes by size

  • 1 bed54%156 homes · 734–862 sq ft · 6 layouts
  • 2 beds33%95 homes · 1,120–1,317 sq ft · 4 layouts
  • 3 beds13%36 homes · 1,587–2,696 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai21min
  • Dubai Airport (DXB)30min
  • Dubai Marina22min

By car. Jumeirah Public Beach, the nearest beach, is 6.8 km away.

Rated schools

  • Emirates International SchoolUK · Very good4.6 kmaway
  • GEMS WORLD ACADEMYInternational Baccalaureate · Very good4.6 kmaway

Getting around

  • Dubai HillsGold Line · opens 203227 minwalk
  • EquitiRed Line4.4 kmaway
  • MeydanEtihad Rail · planned7.3 kmaway
  • Al JaddafHigh-speed rail · planned15 kmaway
  • Dubai InternationalDXB19 kmaway
Area guideHills EstateFinished homesAED 2,274/sq ft1-bed rentAED 90k/yrGross yieldEstimate6.1%

Developer

  • 193 finished
  • 139 being built, on time
  • 3 past their planned date
Escrow bank
Not on record
Legal name
Dubai Hills Estate L.L.C

Also being built by Emaar

Emaar’s other projects
ProjectHandoverBuilt
MaysanTown SquareQ3 2016Past planned date37%
Teema 1 & Teema 2Al Yalayis 4Q3 2016Past planned date9%
Ocean StarDubai Maritime CityQ3 2025Past planned date30%
SeascapeDubai Maritime CityQ4 2026Being built79%
The St. Regis Residences, Downtown DubaiDowntown DubaiQ4 2026Being built76%
All 335 Emaar projects
Questions

More questions about Palace Residences Hillside B

Q4 2029, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.

287 homes on 18 floors: 156 1-bed flats of 734–862 sq ft, 95 2-bed flats of 1,120–1,317 sq ft and 36 3-bed flats of 1,587–2,696 sq ft.

About AED 90k a year for a 1-bed, AED 140k for a 2-bed and AED 250k for a 3-bed in Hills Estate, a gross yield of about 6.1% Estimate.

Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.

In Dubai Hills Estate, 21 minutes by car to Downtown Dubai and 30 to Dubai Airport (DXB). Equiti Metro station on the Red Line is 4.4 km away.

More nearby

How the numbers work

FromAED 1.96MSee it on the map