Skip to content

Flora Bay

Dubai IslandsCay Residences

Flora Bay is an off-plan project by Cay Residences in Dubai Islands, with 84 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 4% built.

Built
4%
Handover
Q2 2027
Sales in 12 months
No sales
Homes
84

Progress

4%built
  1. Q2 2025Building started
  2. Oct 2026Last inspection · 4%
  3. Q2 2027Planned handover

Homes

84 homes by size

  • 1 bed32%27 homes · 735–1,299 sq ft · 11 layouts
  • 2 beds60%50 homes · 1,151–2,499 sq ft · 16 layouts
  • 3 beds7%6 homes · 2,010–2,184 sq ft · 3 layouts
  • 4 beds1%1 home · 3,145 sq ft · 1 layout

Location

Drive times

Dubai Islands Beach, the nearest beach, is 1.4 km away.

Rated schools

  • ELITE ENGLISH SCHOOLIndian · Acceptable4.3 kmaway
  • Sabari Indian SchoolIndian · Good4.3 kmaway

Getting around

  • Gold SouqGreen Line24 minwalk
  • Dubai InternationalDXB7.8 kmaway
  • Al JaddafHigh-speed rail · planned8.0 kmaway
  • MeydanEtihad Rail · planned15 kmaway
Area guideDubai IslandsFinished homesAED 2,253/sq ft1-bed rentAED 110k/yrGross yieldEstimate3.4%

Developer

Cay Residences

  • 1 being built, on time
Escrow bank
Banque Misr
Legal name
Cay Residences Real Estate Development L.L.C
Questions

More questions about Flora Bay

Q2 2027, the planned date in DLD’s register.

It is not past its planned date. It was 4% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.

84 homes on 8 floors: 27 1-bed flats of 735–1,299 sq ft, 50 2-bed flats of 1,151–2,499 sq ft, 6 3-bed flats of 2,010–2,184 sq ft and 1 4+ bed of 3,145 sq ft.

About AED 110k a year for a 1-bed and AED 118k for a 2-bed in Dubai Islands, a gross yield of about 3.4% Estimate.

Of Cay Residences’ 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.

In Dubai Islands. Gold Souq Metro station on the Green Line is a 24-minute walk.

More nearby

How the numbers work