Sunset Bay One by Imtiaz
Dubai IslandsImtiaz
Sunset Bay One by Imtiaz is an off-plan project by Imtiaz in Dubai Islands, with 66 homes on 8 floors. DLD’s last inspection, on 27 Oct 2026, found it 94% built.
- Built
- 94%
- Handover
- Q4 2026
- Sales in 12 months
- 4
- Homes
- 66
Progress
- Q4 2024Building started
- Feb–Apr 2025Launch sales · 38
- Oct 2026Last inspection · 94%
- Q4 2026Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- Not enough sales1 sale
- 2 beds
- Not enough sales2 sales
- 3 beds
- Not enough sales1 sale
Against 71 Dubai Islands off-plan projects with 10 or more sales
- Lowest848AED/sq ft
- Sunset Bay One by Imtiaz1,997AED/sq ft
- Typical2,299AED/sq ft
- Highest4,153AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Jun 2026 · 1 sale | ||||
| 22 Jun 2026 | 2 beds | 1,544 | 1,994 | AED 3.08M |
| Feb 2026 · 1 sale | ||||
| 12 Feb 2026 | 3 beds | 2,022 | 2,250 | AED 4.55M |
| Jan 2026 · 1 sale | ||||
| 6 Jan 2026 | 1 bed | 995 | 2,000 | AED 1.99M |
| Nov 2025 · 1 sale | ||||
| 20 Nov 2025 | 2 beds | 1,468 | 1,731 | AED 2.54M |
Homes
66 homes by size
- 1 bed48%32 homes · 942–1,071 sq ft · 4 layouts
- 2 beds48%32 homes · 1,345–2,258 sq ft · 6 layouts
- 3 beds3%2 homes · 2,022–2,060 sq ft · 2 layouts
Location
Drive times
Dubai Islands Beach, the nearest beach, is 1.4 km away.
Rated schools
- ELITE ENGLISH SCHOOLIndian · Acceptable4.3 kmaway
- Sabari Indian SchoolIndian · Good4.4 kmaway
Getting around
- Gold SouqGreen Line24 minwalk
- Dubai InternationalDXB7.9 kmaway
- Al JaddafHigh-speed rail · planned8.0 kmaway
- MeydanEtihad Rail · planned15 kmaway
Developer
- 10 finished
- 28 being built, on time
- 3 past their planned date
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Imtiaz Sunset Real Estate Development L.L.C
Also being built by Imtiaz
| Project | Handover | Built |
|---|---|---|
| Beach Walk Residences 3 BY ImtiazDubai Islands | Q2 2026Past planned date | 100% |
| Cove Edition Residence 1 By ImtiazDubai Land Residence Complex | Q3 2026Past planned date | 90% |
| Cove Edition Residence 2 By ImtiazDubai Land Residence Complex | Q4 2026Past planned date | 60% |
| Luxur Tower By ImtiazJVC | Q4 2026Being built | 90% |
| Beach Walk Grand By ImtiazDubai Islands | Q4 2026Being built | 68% |
More questions about Sunset Bay One by Imtiaz
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 94% built at DLD’s last inspection on 27 Oct 2026, with handover planned in 1 month.
66 homes on 8 floors: 32 1-bed flats of 942–1,071 sq ft, 32 2-bed flats of 1,345–2,258 sq ft and 2 3-bed flats of 2,022–2,060 sq ft.
About AED 110k a year for a 1-bed and AED 118k for a 2-bed in Dubai Islands, a gross yield of about 3.4% Estimate.
Of Imtiaz’s 41 projects on DLD’s record, 10 are finished. Of the 31 being built, 3 are past their planned date.
In Dubai Islands. Gold Souq Metro station on the Green Line is a 24-minute walk.
More nearby
Off-plan nearby
- Villa dell ArteFrom AED 2.03M0% built · Planned Q4 2027
- Flora BayNo sales4% built · Planned Q2 2027
- Floarea BreezeFrom AED 2.03M0% built · Planned Q2 2028
- Beach Walk Residences 4 by ImtiazFrom AED 2.58M43% built · Planned Q2 2027
- Sunset Bay Two by ImtiazFrom AED 2.72M70% built · Planned Q1 2027
- Haven Bay ResidencesFrom AED 2.33M83% built · Past planned date
