Garnet by Siroya is an off-plan project by Siroya in Dubai South, with 66 homes on 6 floors. DLD’s last inspection found it 0% built.

Built
0%
Handover
Q4 2027
Sales in 12 months
No sales
Homes
66

Progress

0%built
  1. Q4 2025Building started
  2. Jun 2026Last inspection · 0%
  3. Q4 2027Planned handover

DLD updates % built after each inspection, so work on site can be further along than this figure.

Homes

66 homes by size

  • 1 bed45%30 homes · 731–866 sq ft · 4 layouts
  • 2 beds55%36 homes · 1,110–1,280 sq ft · 5 layouts

Location

Drive times

  • Downtown Dubai41min
  • Dubai Airport (DXB)47min
  • Dubai Marina27min

By car. JBR Beach, the nearest beach, is 17.5 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Expo 2020Red Line8.4 kmaway
  • Al Maktoum AirportHigh-speed rail · planned8.9 kmaway
  • Al Maktoum InternationalDWC8.9 kmaway
  • Al YalayisEtihad Rail9.6 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%

Developer

Siroya

  • 1 not started
Escrow bank
Not on record
Legal name
Siroya Ventures Star Real Estate Developers L.L.C
Questions

More questions about Garnet by Siroya

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection, with handover planned in 13 months.

66 homes on 6 floors: 30 1-bed flats of 731–866 sq ft and 36 2-bed flats of 1,110–1,280 sq ft.

About AED 57k a year for a 1-bed and AED 85k for a 2-bed in Dubai South, a gross yield of about 7.4% Estimate.

Of Siroya’s 1 projects on DLD’s record, 0 are finished.