Skip to content

High Best Tower

MajanTrue Future

FromAED 1.09M1 bed · 679 sq ft

High Best Tower is an off-plan project by True Future in Majan, with 84 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 91% built.

Built
91%
Handover
Q4 2026
Since launch
Down 1%1 bed price per sq ft
Homes
84

Progress

91%built
  1. Q4 2024Building started
  2. Apr–Jun 2025Launch sales · 32
  3. Oct 2026Last inspection · 91%
  4. Q4 2026Planned handover

Prices

Price per sq ft

1,562 AED/sq ft15 sales in 12 months

Typical price by size

1 bed
AED 1.09M679 sq ft · 1,610 AED/sq ft · 3 sales
2 beds
AED 1.89M1,278 sq ft · 1,470 AED/sq ft · 10 sales
3 beds
Not enough sales2 sales

Against 35 Majan off-plan projects with 10 or more sales

  • Lowest783AED/sq ft
  • Typical1,474AED/sq ft
  • High Best Tower1,562AED/sq ft
  • Highest2,941AED/sq ft

15th highest of 35 · AED per sq ft in 12 months

Latest sales

Newest first
15 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 3 sales
26 Oct 20263 beds1,5061,803AED 2.72M
6 Oct 20261 bed6791,611AED 1.09M
5 Oct 20262 beds1,1051,448AED 1.6M
Sep 2026 · 1 sale
24 Sep 20262 beds1,2631,979AED 2.5M
Aug 2026 · 5 sales
18 Aug 20262 beds1,5951,562AED 2.49M
13 Aug 20263 beds1,5421,875AED 2.89M
12 Aug 20261 bed6511,600AED 1.04M
4 Aug 20262 beds1,2781,849AED 2.36M
4 Aug 20262 beds1,5941,562AED 2.49M
Dec 2025 · 3 sales
31 Dec 20251 bed7921,655AED 1.31M
12 Dec 20252 beds1,0891,465AED 1.6M
9 Dec 20252 beds1,5951,187AED 1.89M
Nov 2025 · 3 sales
28 Nov 20252 beds1,2781,470AED 1.88M
26 Nov 20252 beds1,4381,294AED 1.86M
6 Nov 20252 beds1,2781,470AED 1.88M

Homes

84 homes by size

  • 1 bed29%24 homes · 651–792 sq ft · 6 layouts
  • 2 beds67%56 homes · 1,057–1,594 sq ft · 7 layouts
  • 3 beds5%4 homes · 1,504–1,542 sq ft · 2 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.49M

Location

Drive times

  • Downtown Dubai22min
  • Dubai Airport (DXB)27min
  • Dubai Marina35min

By car. Mercato Beach, the nearest beach, is 14.7 km away.

Rated schools

  • Repton SchoolUK/IB (Y 13) · Outstanding3.0 kmaway
  • GEMS Wellington Academy -FzeUK · Very good3.3 kmaway

Getting around

  • Dubai Silicon OasisBlue Line · opens 20293.3 kmaway
  • MeydanEtihad Rail · planned6.4 kmaway
  • CreekGreen Line10 kmaway
  • Al JaddafHigh-speed rail · planned11 kmaway
  • Dubai InternationalDXB14 kmaway
Area guideMajanFinished homesAED 1,181/sq ft1-bed rentAED 65k/yrGross yieldEstimate6.6%

Developer

  • 1 being built, on time
  • 1 past their planned date
  • 1 not started
Escrow bank
Emirates Islamic Bank
Legal name
True Future Real Estate Development L.L.C

More by True Future

True Future’s other projects
ProjectHandoverBuilt
Future ResidenceBu KadraQ2 2027Being built0%
Future Avenue TowerBu KadraQ3 2028Not started0%
All 3 True Future projects
Questions

More questions about High Best Tower

From AED 1.09M for a 679 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 1.89M.

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 91% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

84 homes on 5 floors: 24 1-bed flats of 651–792 sq ft, 56 2-bed flats of 1,057–1,594 sq ft and 4 3-bed flats of 1,504–1,542 sq ft.

Down 1% for 1-bed flats, per sq ft. Against the launch sales of Apr 2025 – Jun 2025: 2-bed flats 0%.

About AED 65k a year for a 1-bed, AED 90k for a 2-bed and AED 130k for a 3-bed in Majan, a gross yield of about 6.6% Estimate.

Of True Future’s 3 projects on DLD’s record, 0 are finished. Of the 2 being built, 1 is past its planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.49M.

In Majan, 22 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 10 km away.

More nearby

How the numbers work

FromAED 1.09MSee it on the map