Future Avenue Tower
Bu KadraTrue Future
Future Avenue Tower is an off-plan project by True Future in Bu Kadra, with 167 homes on 14 floors. DLD’s last inspection, on 10 Sep 2026, found it 0% built.
- Built
- 0%
- Handover
- Q3 2028
- Sales in 12 months
- No sales
- Homes
- 167
Progress
- Sep 2026Last inspection · 0%
- Q4 2026Building started
- Q3 2028Planned handover
Homes
167 homes by size
- 1 bed83%136 homes · 622–821 sq ft · 10 layouts
- 2 beds17%28 homes · 965–1,242 sq ft · 6 layouts
Location
Drive times
- Downtown Dubai22min
- Dubai Marina34min
By car. Mercato Beach, the nearest beach, is 8.7 km away.
Rated schools
- Hartland International School - FZUK · Very good2.2 kmaway
Getting around
- Nad Al ShebaGold Line · opens 20323.0 kmaway
- MeydanEtihad Rail · planned3.2 kmaway
- CreekGreen Line4.7 kmaway
- Al JaddafHigh-speed rail · planned5.2 kmaway
- Dubai InternationalDXB9.1 kmaway
Developer
- 1 being built, on time
- 1 past their planned date
- 1 not started
- Escrow bank
- Not on record
- Legal name
- True Future Real Estate Development L.L.C
Also being built by True Future
| Project | Handover | Built |
|---|---|---|
| High Best TowerMajan | Q4 2026Past planned date | 91% |
| Future ResidenceBu Kadra | Q2 2027Being built | 0% |
More questions about Future Avenue Tower
Q3 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 10 Sep 2026, with handover planned in 22 months.
167 homes on 14 floors: 136 1-bed flats of 622–821 sq ft and 28 2-bed flats of 965–1,242 sq ft.
About AED 110k a year for a 2-bed in Bu Kadra.
Of True Future’s 3 projects on DLD’s record, 0 are finished. Of the 2 being built, 1 is past its planned date.
In Bu Kadra, 22 minutes by car to Downtown Dubai and 34 to Dubai Marina. Creek Metro station on the Green Line is 4.7 km away.
More nearby
Off-plan nearby
- Mia TowerNo sales0% built · Planned Q1 2028
- Future ResidenceFrom AED 1.42M0% built · Planned Q2 2027
- The WinslowNo sales0% built · Planned Q1 2028
- Parkway by Prestige OneFrom AED 1.57M11% built · Planned Q1 2028
- Helvetia VerdeFrom AED 1.66M1% built · Planned Q4 2027
- R Home MHFrom AED 1.56M0% built · Planned Q3 2029