Mia Tower
Bu KadraStamn
Mia Tower is an off-plan project by Stamn in Bu Kadra, with 205 homes on 20 floors. DLD’s last inspection, on 27 Jan 2026, found it 0% built.
- Built
- 0%
- Handover
- Q1 2028
- Sales in 12 months
- No sales
- Homes
- 205
Progress
- Jan 2026Last inspection · 0%
- Q1 2026Building started
- Q1 2028Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
205 homes by size
- 1 bed72%148 homes · 619–1,446 sq ft · 10 layouts
- 2 beds23%47 homes · 845–3,130 sq ft · 10 layouts
- 3 beds5%10 homes · 1,638–4,079 sq ft · 6 layouts
Location
Drive times
- Downtown Dubai17min
- Dubai Airport (DXB)24min
- Dubai Marina30min
By car. Mercato Beach, the nearest beach, is 8.6 km away.
Rated schools
- Hartland International School - FZUK · Very good2.1 kmaway
Getting around
- Nad Al ShebaGold Line · opens 20323.0 kmaway
- MeydanEtihad Rail · planned3.1 kmaway
- CreekGreen Line4.7 kmaway
- Al JaddafHigh-speed rail · planned5.2 kmaway
- Dubai InternationalDXB9.1 kmaway
Developer
- 2 being built, on time
- 1 past their planned date
- 1 not started
- Escrow bank
- Not on record
- Legal name
- Stamn Real Estate Development L.L.C
Also being built by Stamn
| Project | Handover | Built |
|---|---|---|
| Stamn OneAl Satwa | Q4 2026Past planned date | 42% |
| Stamn YuniAl Satwa | Q1 2027Being built | 12% |
| Nautis ResidencesDubai Islands | Q3 2027Being built | 1% |
More questions about Mia Tower
Q1 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 27 Jan 2026, with handover planned in 16 months.
205 homes on 20 floors: 148 1-bed flats of 619–1,446 sq ft, 47 2-bed flats of 845–3,130 sq ft and 10 3-bed flats of 1,638–4,079 sq ft.
About AED 110k a year for a 2-bed in Bu Kadra.
Of Stamn’s 4 projects on DLD’s record, 0 are finished. Of the 3 being built, 1 is past its planned date.
In Bu Kadra, 17 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Creek Metro station on the Green Line is 4.7 km away.
More nearby
Off-plan nearby
- Future Avenue TowerNo sales0% built · Planned Q3 2028
- Future ResidenceFrom AED 1.42M0% built · Planned Q2 2027
- Helvetia VerdeFrom AED 1.66M1% built · Planned Q4 2027
- The WinslowNo sales0% built · Planned Q1 2028
- R Home MHFrom AED 1.56M0% built · Planned Q3 2029
- The VersoNo sales0% built · Planned Q3 2030