Marina Cove
Dubai MarinaEmaar
Marina Cove is an off-plan project by Emaar in Dubai Marina, with 226 homes on 28 floors. DLD’s last inspection, on 26 Oct 2026, found it 6% built.
- Built
- 6%
- Handover
- Q3 2029
- Sales in 12 months
- 5
- Homes
- 226
About
Marina Cove is a 28-floor building of 226 homes in Dubai Marina, a short walk from Dubai Marina Mall and Pier 7. Homes run from 1-bed to 4-bed flats, with 2-bed flats the most common, each with large windows and open-plan living. Residents share a landscaped terrace, a pool with a kids’ pool and an outdoor gym.
- Walk to Dubai Marina Mall
- Landscaped terrace
- Views over the marina
Shared facilities
- Pool
- Kids’ pool
- Gym
- Outdoor gym
- Landscaped terrace
- Kids’ play area
- BBQ and dining area
- Events room
Progress
- Q4 2024Building started
- Nov 2024 – Jan 2025Launch sales · 198
- Oct 2026Last inspection · 6%
- Q3 2029Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- Not enough sales1 sale
- 2 beds
- Not enough sales1 sale
- 3 beds
- Not enough sales2 sales
- 4+ beds
- Not enough sales1 sale
Against 22 Dubai Marina off-plan projects with 10 or more sales
- Lowest2,217AED/sq ft
- Marina Cove2,331AED/sq ft
- Typical3,822AED/sq ft
- Highest5,087AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Sep 2026 · 2 sales | ||||
| 25 Sep 2026 | 2 beds | 1,238 | 2,695 | AED 3.34M |
| 23 Sep 2026 | 4+ beds | 2,418 | 2,978 | AED 7.2M |
| Aug 2026 · 1 sale | ||||
| 3 Aug 2026 | 3 beds | 1,991 | 2,304 | AED 4.59M |
| Apr 2026 · 2 sales | ||||
| 23 Apr 2026 | 3 beds | 1,991 | 2,331 | AED 4.64M |
| 14 Apr 2026 | 1 bed | 968 | 2,295 | AED 2.22M |
Homes
226 homes by size
- 1 bed29%65 homes · 790–968 sq ft · 3 layouts
- 2 beds40%90 homes · 1,235–1,660 sq ft · 3 layouts
- 3 beds27%62 homes · 1,604–1,991 sq ft · 4 layouts
- 4 beds4%9 homes · 2,404 sq ft · 1 layout
Location
Drive times
- Downtown Dubai25min
- Dubai Airport (DXB)38min
By car. JBR Beach, the nearest beach, is 1.1 km away.
Rated schools
- EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good2.0 kmaway
- Regent International Private SchoolUK · Very good3.4 kmaway
Getting around
- Dubai Marina MallDubai Tram3 minwalk
- SOBHA REALTYRed Line9 minwalk
- Al YalayisEtihad Rail7.2 kmaway
- Al Maktoum AirportHigh-speed rail · planned20 kmaway
- Al Maktoum InternationalDWC20 kmaway
Area guideDubai MarinaFinished homesAED 1,989/sq ft1-bed rentAED 95k/yrGross yieldEstimate5.6%Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- Emirates NBD Bank
- Legal name
- Emaar Development P.J.S.C.
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Marina Cove
Q3 2029, the planned date in DLD’s register.
It is not past its planned date. It was 6% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
226 homes on 28 floors: 65 1-bed flats of 790–968 sq ft, 90 2-bed flats of 1,235–1,660 sq ft, 62 3-bed flats of 1,604–1,991 sq ft and 9 4+ bed flats of 2,404 sq ft.
About AED 95k a year for a 1-bed, AED 145k for a 2-bed, AED 215k for a 3-bed and AED 300k for a 4+ bed in Dubai Marina, a gross yield of about 5.6% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
In Dubai Marina, 25 minutes by car to Downtown Dubai and 38 to Dubai Airport (DXB). SOBHA REALTY Metro station on the Red Line is a 9-minute walk.
More nearby
Off-plan nearby
- Pier 8From AED 741k93% built · Past planned date
- Rove Home Dubai MarinaFrom AED 1.54M8% built · Planned Q1 2028
- Marina ShoresFrom AED 1.96M87% built · Planned Q4 2026
- Liv LuxFrom AED 2.61M87% built · Planned Q4 2026
- PELaGOS by IgoFrom AED 1.5M84% built · Past planned date
- The Residences, Al Habtoor GrandFrom AED 11.28M35% built · Handover not on record
Finished buildings nearby
Typical next door AED 1,498/sq ft · 12 buildings within a 10-minute walk
- The Atlantic1,797AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Address Dubai Marina2,916AED/sq ft1-bed rent AED 130k/yr · 10-minute walk
- Saba Tower 31,524AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Time Place Tower1,594AED/sq ftNot enough rents · 10-minute walk
- Saba Tower 21,472AED/sq ft1-bed rent AED 80k/yr · 10-minute walk
- Liv Residence2,665AED/sq ft1-bed rent AED 120k/yr · 10-minute walk
- Continental Tower1,685AED/sq ft1-bed rent AED 90k/yr · 10-minute walk
- Madina Tower1,359AED/sq ft1-bed rent AED 95k/yr · 10-minute walk
- Armada Towers1,353AED/sq ft1-bed rent AED 82k/yr · 10-minute walk
- Marina Diamond 41,372AED/sq ftNot enough rents · 10-minute walk
- New Dubai Gate 11,343AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- O2 Residences1,357AED/sq ftNot enough rents · 10-minute walk
- Bluewaters Residences5,629AED/sq ft1-bed rent AED 279k/yr
- Palace Beach Residence3,592AED/sq ft1-bed rent AED 125k/yr
- Park Islands2,010AED/sq ft1-bed rent AED 100k/yr
- Grand Bleu Tower Interiors by Elie Saab3,761AED/sq ft1-bed rent AED 150k/yr
