Marquis Aura
Dubai SouthMarquis
Marquis Aura is an off-plan project by Marquis in Dubai South, with 226 homes on 9 floors. DLD’s last inspection, on 5 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q3 2029
- Sales in 12 months
- No sales
- Homes
- 226
Progress
- Q4 2026Building started
- Oct 2026Last inspection · 0%
- Q3 2029Planned handover
Homes
226 homes by size
- Studio22%49 homes · 431–506 sq ft · 7 layouts
- 1 bed28%61 homes · 731–1,001 sq ft · 7 layouts
- 2 beds50%110 homes · 977–2,482 sq ft · 15 layouts
Location
Drive times
- Downtown Dubai39min
- Dubai Airport (DXB)44min
- Dubai Marina28min
By car.
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%Developer
- 2 finished
- 5 being built, on time
- Escrow bank
- Not on record
- Legal name
- Marquis Star Development L.L.C
More by Marquis
| Project | Handover | Built |
|---|---|---|
| Marquis VistaDubai Land Residence Complex | Q4 2027Being built | 3% |
| MARQUIS HORIZONDubai South | Q3 2028Being built | 0% |
| Marquis OneArjan | Q4 2028Being built | 0% |
| Marquis InsigniaArjan | Not on recordBeing built | 67% |
| Marquis GalleriaArjan | Q4 2024Finished |
More questions about Marquis Aura
Q3 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 5 Oct 2026, with handover planned in 3 years.
226 homes on 9 floors: 49 studios of 431–506 sq ft, 61 1-bed flats of 731–1,001 sq ft and 110 2-bed flats of 977–2,482 sq ft.
About AED 41k a year for a studio, AED 57k for a 1-bed and AED 85k for a 2-bed in Dubai South, a gross yield of about 7.4% Estimate.
Of Marquis’ 7 projects on DLD’s record, 2 are finished. Of the 5 being built, none is past its planned date.
In Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB).
More nearby
Off-plan nearby
- Azizi Venice 14From AED 629k30% built · Past planned date
- Azizi Venice 6From AED 730k12% built · Planned Q4 2027
- Azizi Venice 15From AED 692k0% built · Planned Q2 2027
- Azizi Venice 7From AED 640k29% built · Past planned date
- Azizi Venice 13From AED 650k46% built · Planned Q3 2027
- Azizi Venice 12From AED 650k22% built · Planned Q3 2027