Marwa Views
Jumeirah Village TriangleNew World
Marwa Views is an off-plan project by New World in Jumeirah Village Triangle, with 69 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 40% built.
- Built
- 40%
- Handover
- Q1 2027
- Sales in 12 months
- No sales
- Homes
- 69
Progress
- Q2 2025Building started
- Oct 2026Last inspection · 40%
- Q1 2027Planned handover
Homes
69 homes by size
- Studio13%9 homes · 457–524 sq ft · 3 layouts
- 1 bed71%49 homes · 898–1,003 sq ft · 4 layouts
- 2 beds4%3 homes · 1,476–1,507 sq ft · 2 layouts
- 3 beds12%8 homes · 1,438–1,809 sq ft · 3 layouts
Location
Drive times
- Downtown Dubai28min
- Dubai Airport (DXB)36min
- Dubai Marina21min
By car. JBR Beach, the nearest beach, is 7.4 km away.
Rated schools
- Victory Heights Primary SchoolUK · Outstanding3.1 kmaway
- Dwight SchoolInternational Baccalaureate · Good3.7 kmaway
Getting around
- Dubai Production CityGold Line · opens 203221 minwalk
- Al YalayisEtihad Rail3.9 kmaway
- Jumeirah Golf EstatesRed Line4.2 kmaway
- Al Maktoum AirportHigh-speed rail · planned17 kmaway
- Al Maktoum InternationalDWC17 kmaway
Area guideJumeirah Village TriangleFinished homesAED 1,337/sq ft1-bed rentAED 72k/yrGross yieldEstimate7.5%Developer
- 5 finished
- 1 being built, on time
- Escrow bank
- Abu Dhabi Commercial Bank
- Legal name
- New World Developments L.L.C
More by New World
| Project | Handover | Built |
|---|---|---|
| Marwa HeightsJVC | Q3 2023Finished | |
| Marwa Homes 2JVC | Q1 2018Finished | |
| Marwa HomesJVC | Q3 2015Finished | |
| Marwa Homes IIIJVC | Not on recordFinished | |
| Marwa Homes IVJVC | Not on recordFinished |
More questions about Marwa Views
Q1 2027, the planned date in DLD’s register.
It is not past its planned date. It was 40% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 months.
69 homes on 5 floors: 9 studios of 457–524 sq ft, 49 1-bed flats of 898–1,003 sq ft, 3 2-bed flats of 1,476–1,507 sq ft and 8 3-bed flats of 1,438–1,809 sq ft.
About AED 47k a year for a studio, AED 72k for a 1-bed, AED 95k for a 2-bed and AED 164k for a 3-bed in Jumeirah Village Triangle, a gross yield of about 7.5% Estimate.
Of New World’s 6 projects on DLD’s record, 5 are finished. Of the 1 being built, none is past its planned date.
In Jumeirah Village Triangle, 28 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 4.2 km away.
More nearby
Off-plan nearby
- Winner TowerFrom AED 1.21M28% built · Handover not on record
- Paradise OneNo sales70% built · Planned Q2 2027
- Leven ResidencesFrom AED 1.16M23% built · Planned Q4 2027
- Point ResidenciaNo sales92% built · Cancelled
- Azha Millennium ResidencesFrom AED 703k30% built · Planned Q3 2027
- Sky Gate TowerFrom AED 559k5% built · Planned Q1 2028
Finished buildings nearby
Typical next door AED 1,091/sq ft · 10 buildings within a 10-minute walk
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr · 10-minute walk
- Seslia Tower1,330AED/sq ft1-bed rent AED 66k/yr · 10-minute walk
- Belmont Residences1,625AED/sq ftNot enough rents · 10-minute walk
- Oakwood Residency789AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Centrium Tower854AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Green Park940AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Imperial Residence1,005AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- The Ivy1,323AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Taraf 2 Residence1,137AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr · 10-minute walk
- Al Jawhara Tower1,145AED/sq ftNot enough rents
- Milestone Residences1,446AED/sq ft1-bed rent AED 87k/yr
- Forum Heights1,452AED/sq ft1-bed rent AED 75k/yr
- Edmonton Elm860AED/sq ft1-bed rent AED 70k/yr
