Winner Tower
Jumeirah Village TriangleObject 1
Winner Tower is an off-plan project by Object 1 in Jumeirah Village Triangle, with 136 homes on 20 floors. DLD’s last inspection, on 26 Oct 2026, found it 28% built.
- Built
- 28%
- Handover
- Not on record
- Since launch
- Down 2%1 bed price per sq ft
- Homes
- 136
Progress
- Q1 2024Building started
- May–Jul 2024Launch sales · 63
- Oct 2026Last inspection · 28%
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.21M859 sq ft · 9 sales
Against 26 Jumeirah Village Triangle off-plan projects with 10 or more sales
- Lowest1,251AED/sq ft
- Winner Tower1,336AED/sq ft
- Typical1,604AED/sq ft
- Highest1,950AED/sq ft
Latest sales
Plus 2 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 17 Nov 2026 | 1 bed New | 859 | 1,254 | AED 1.08M |
| 9 Nov 2026 | 1 bed New | 1,010 | 1,245 | AED 1.26M |
| Oct 2026 · 1 sale | ||||
| 13 Oct 2026 | 1 bed | 733 | 1,390 | AED 1.02M |
| Aug 2026 · 2 sales | ||||
| 11 Aug 2026 | 1 bed | 1,024 | 1,178 | AED 1.21M |
| 11 Aug 2026 | 1 bed | 1,024 | 1,178 | AED 1.21M |
| Jun 2026 · 2 sales | ||||
| 17 Jun 2026 | 1 bed | 1,024 | 1,203 | AED 1.23M |
| 4 Jun 2026 | 1 bed | 859 | 1,444 | AED 1.24M |
| Mar 2026 · 1 sale | ||||
| 31 Mar 2026 | 1 bed | 754 | 1,423 | AED 1.07M |
| Jan 2026 · 2 sales | ||||
| 20 Jan 2026 | 1 bed | 859 | 1,471 | AED 1.26M |
| 12 Jan 2026 | 1 bed | 1,024 | 1,227 | AED 1.26M |
| Dec 2025 · 1 sale | ||||
| 9 Dec 2025 | 1 bed | 859 | 1,336 | AED 1.15M |
Homes
136 homes by size
- 1 bed85%116 homes · 733–1,088 sq ft · 8 layouts
- 2 beds15%20 homes · 1,251–2,072 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai28min
- Dubai Airport (DXB)36min
- Dubai Marina21min
By car. JBR Beach, the nearest beach, is 7.5 km away.
Rated schools
- Victory Heights Primary SchoolUK · Outstanding3.0 kmaway
- Dwight SchoolInternational Baccalaureate · Good3.6 kmaway
Getting around
- Dubai Production CityGold Line · opens 203221 minwalk
- Al YalayisEtihad Rail4.0 kmaway
- Jumeirah Golf EstatesRed Line4.2 kmaway
- Al Maktoum AirportHigh-speed rail · planned17 kmaway
- Al Maktoum InternationalDWC17 kmaway
Area guideJumeirah Village TriangleFinished homesAED 1,337/sq ft1-bed rentAED 72k/yrGross yieldEstimate7.5%Developer
- 2 finished
- 21 being built, on time
- 4 past their planned date
- 3 not started
- Escrow bank
- Abu Dhabi Islamic Bank
- Legal name
- Object One Real Estate Development L.L.C
Also being built by Object 1
| Project | Handover | Built |
|---|---|---|
| Evergrin HouseAl Satwa | Q2 2026Past planned date | 55% |
| The Fifth TowerJVC | Q3 2026Past planned date | 55% |
| Luminar Tower 1Jumeirah Village Triangle | Q4 2026Past planned date | 33% |
| Luminar Tower 2Jumeirah Village Triangle | Q4 2026Past planned date | 31% |
| Vivid TowerJumeirah Village Triangle | Q4 2026Being built | 12% |
More questions about Winner Tower
From AED 1.21M for a 859 sq ft 1-bed, the lowest typical price paid in the 12 months.
136 homes on 20 floors: 116 1-bed flats of 733–1,088 sq ft and 20 2-bed flats of 1,251–2,072 sq ft.
Down 2% for 1-bed flats, per sq ft.
About AED 72k a year for a 1-bed and AED 95k for a 2-bed in Jumeirah Village Triangle, a gross yield of about 7.5% Estimate.
Of Object 1’s 30 projects on DLD’s record, 2 are finished. Of the 25 being built, 4 are past their planned date.
In Jumeirah Village Triangle, 28 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 4.2 km away.
More nearby
Off-plan nearby
- Marwa ViewsNo sales40% built · Planned Q1 2027
- Leven ResidencesFrom AED 1.16M23% built · Planned Q4 2027
- Paradise OneNo sales70% built · Planned Q2 2027
- Sky Gate TowerFrom AED 559k5% built · Planned Q1 2028
- Voxa ResidencesFrom AED 790k4% built · Planned Q4 2028
- Azha Millennium ResidencesFrom AED 703k30% built · Planned Q3 2027
Finished buildings nearby
Typical next door AED 1,091/sq ft · 10 buildings within a 10-minute walk
- Seslia Tower1,330AED/sq ft1-bed rent AED 66k/yr · 10-minute walk
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr · 10-minute walk
- Belmont Residences1,625AED/sq ftNot enough rents · 10-minute walk
- Oakwood Residency789AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Centrium Tower854AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Imperial Residence1,005AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Green Park940AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- The Ivy1,323AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Taraf 2 Residence1,137AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Hyati Residence1,242AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr
- Al Jawhara Tower1,145AED/sq ftNot enough rents
- Milestone Residences1,446AED/sq ft1-bed rent AED 87k/yr
- Forum Heights1,452AED/sq ft1-bed rent AED 75k/yr