Skip to content

The Fifth Tower

Jumeirah Village CircleObject 1

FromAED 576kStudio · 326 sq ft

The Fifth Tower is an off-plan project by Object 1 in Jumeirah Village Circle, with 340 homes on 30 floors. DLD’s last inspection, on 10 Nov 2026, found it 55% built.

Built
55%
Handover
Q3 2026
Since launch
Up 7%Studio price per sq ft
Homes
340

About

The F1fth is a 30-floor building of 340 homes in Jumeirah Village Circle, planned around things for families to do without leaving home. Three in four homes are 1-bed flats, with some studios and 2-bed flats. Residents share pools, a children’s playground and a games room, with a barbecue area and a clubhouse.

  • Mostly 1-bed flats
  • Children’s playground and games room
  • BBQ area and clubhouse

Shared facilities

  • Pool
  • Pool deck
  • Kids’ playroom
  • Games room
  • Outdoor lounge
  • BBQ area
  • Clubhouse
  • Gym

Progress

55%built
  1. Q1 2024Building started
  2. Jul–Sep 2024Launch sales · 169
  3. Q3 2026Planned handover · passed
  4. Nov 2026Last inspection · 55%
2 months past the planned date

Prices

Price per sq ft

1,278 AED/sq ft45 sales in 12 months

Typical price by size

Studio
AED 576k326 sq ft · 3 sales
1 bed
AED 818k649 sq ft · 32 sales
2 beds
AED 1.43M1,116 sq ft · 10 sales

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • The Fifth Tower1,278AED/sq ft
  • Typical1,497AED/sq ft
  • Highest2,276AED/sq ft

11th lowest of 99 · AED per sq ft in 12 months

Latest sales

Newest first
45 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Sep 2026 · 1 sale
28 Sep 2026Studio3261,902AED 620k
Aug 2026 · 1 sale
26 Aug 20261 bed6571,201AED 789k
Jun 2026 · 1 sale
24 Jun 20261 bed6491,171AED 760k
May 2026 · 1 sale
4 May 20261 bed6481,111AED 720k
Apr 2026 · 10 sales
28 Apr 20262 beds1,1171,084AED 1.21M
28 Apr 20261 bed6571,241AED 816k
28 Apr 20261 bed6561,242AED 815k
28 Apr 20261 bed6471,226AED 793k
28 Apr 20261 bed6491,184AED 768k
28 Apr 20261 bed6471,226AED 793k
28 Apr 20262 beds1,1171,084AED 1.21M
7 Apr 20261 bed6481,230AED 797k
7 Apr 20261 bed6571,224AED 804k
7 Apr 20261 bed6491,178AED 765k
Mar 2026 · 1 sale
16 Mar 20261 bed6561,605AED 1.05M
Feb 2026 · 7 sales
20 Feb 20261 bed6461,485AED 960k
20 Feb 20261 bed6481,346AED 872k
17 Feb 20261 bed6591,184AED 781k
12 Feb 20261 bed6491,484AED 963k
11 Feb 20262 beds1,1171,465AED 1.64M
11 Feb 20261 bed6491,545AED 1M
9 Feb 20261 bed6481,256AED 814k
Jan 2026 · 10 sales
30 Jan 20261 bed8361,449AED 1.21M
28 Jan 20262 beds1,1161,316AED 1.47M
27 Jan 20261 bed6491,478AED 959k
26 Jan 20261 bed6481,682AED 1.09M
23 Jan 20261 bed6491,278AED 829k
20 Jan 20262 beds1,1151,121AED 1.25M
19 Jan 2026Studio3261,767AED 576k
19 Jan 20261 bed6491,263AED 820k
15 Jan 20261 bed6571,421AED 934k
6 Jan 20262 beds1,1161,474AED 1.64M
Dec 2025 · 3 sales
22 Dec 20252 beds1,1151,242AED 1.39M
10 Dec 20251 bed6471,514AED 980k
3 Dec 20251 bed6491,517AED 984k
Nov 2025 · 10 sales
25 Nov 20251 bed6471,326AED 858k
25 Nov 2025Studio3261,433AED 467k
25 Nov 20251 bed6591,106AED 729k
24 Nov 20252 beds1,1161,506AED 1.68M
20 Nov 20251 bed6501,592AED 1.04M
13 Nov 20251 bed6461,198AED 774k
12 Nov 20251 bed6471,221AED 790k
11 Nov 20251 bed6481,693AED 1.1M
10 Nov 20252 beds1,1171,388AED 1.55M
6 Nov 20252 beds1,1141,122AED 1.25M

Homes

340 homes by size

  • Studio10%34 homes · 326–624 sq ft · 5 layouts
  • 1 bed75%256 homes · 648–1,378 sq ft · 10 layouts
  • 2 beds15%50 homes · 1,116 sq ft · 1 layout

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)36min
  • Dubai Marina22min

By car. JBR Beach, the nearest beach, is 7.6 km away.

Rated schools

  • JSS International SchoolIndian · Very good1.0 kmaway
  • GEMS WORLD ACADEMYInternational Baccalaureate · Very good1.9 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 203224 minwalk
  • Dubai Internet CityRed Line4.9 kmaway
  • Al YalayisEtihad Rail7.1 kmaway
  • Al Maktoum AirportHigh-speed rail · planned20 kmaway
  • Al Maktoum InternationalDWC20 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 2 finished
  • 21 being built, on time
  • 4 past their planned date
  • 3 not started
Escrow bank
Abu Dhabi Islamic Bank
Legal name
Object One Real Estate Development L.L.C

Also being built by Object 1

Object 1’s other projects
ProjectHandoverBuilt
Evergrin HouseAl SatwaQ2 2026Past planned date55%
Luminar Tower 1Jumeirah Village TriangleQ4 2026Past planned date33%
Luminar Tower 2Jumeirah Village TriangleQ4 2026Past planned date31%
Vivid TowerJumeirah Village TriangleQ4 2026Being built12%
Evergrin House 2Al SatwaQ4 2026Being built10%
All 30 Object 1 projects
Questions

More questions about The Fifth Tower

From AED 576k for a 326 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 818k and 2-bed flats sell for about AED 1.43M.

Q3 2026, the planned date in DLD’s register.

No. It is 2 months past its planned date, and was 55% built at DLD’s last inspection on 10 Nov 2026.

340 homes on 30 floors: 34 studios of 326–624 sq ft, 256 1-bed flats of 648–1,378 sq ft and 50 2-bed flats of 1,116 sq ft.

Down 9% for 1-bed flats, per sq ft. Against the launch sales of Jul 2024 – Sep 2024: studios up 7%, 2-bed flats up 1%.

About AED 48k a year for a studio, AED 71k for a 1-bed and AED 100k for a 2-bed in JVC, a gross yield of about 7.3% Estimate.

Of Object 1’s 30 projects on DLD’s record, 2 are finished. Of the 25 being built, 4 are past their planned date.

In Jumeirah Village Circle, 26 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Dubai Internet City Metro station on the Red Line is 4.9 km away.

More nearby

How the numbers work

FromAED 576kSee it on the map