Skip to content

Evergrin House 2

Jumeirah Garden CityObject 1

FromAED 1.02MStudio · 415 sq ft

Evergrin House 2 is an off-plan project by Object 1 in Jumeirah Garden City, with 193 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 10% built.

Built
10%
Handover
Q4 2026
Sales in 12 months
127
Homes
193

Progress

10%built
  1. Q3 2025Building started
  2. Oct 2026Last inspection · 10%
  3. Q4 2026Planned handover

Prices

Price per sq ft

2,428 AED/sq ft127 sales in 12 months

Typical price by size

Studio
AED 1.02M415 sq ft · 2,482 AED/sq ft · 90 sales
1 bed
AED 1.69M704 sq ft · 2,349 AED/sq ft · 27 sales
2 beds
AED 2.65M1,141 sq ft · 2,264 AED/sq ft · 10 sales

Against 28 Al Satwa off-plan projects with 10 or more sales

  • Lowest1,773AED/sq ft
  • Typical2,194AED/sq ft
  • Evergrin House 22,428AED/sq ft
  • Highest3,037AED/sq ft

6th highest of 28 · AED per sq ft in 12 months

Latest sales

Plus 1 newer sale, newest first
127 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
18 Nov 2026Studio New3982,479AED 987k
Sep 2026 · 1 sale
24 Sep 20261 bed7012,163AED 1.52M
Jul 2026 · 1 sale
22 Jul 2026Studio3982,522AED 1M
Jun 2026 · 4 sales
17 Jun 2026Studio4212,413AED 1.02M
4 Jun 2026Studio4142,561AED 1.06M
4 Jun 20261 bed6432,356AED 1.52M
4 Jun 2026Studio4222,706AED 1.14M
May 2026 · 2 sales
25 May 20261 bed7012,417AED 1.69M
5 May 20261 bed6432,451AED 1.58M
Apr 2026 · 1 sale
1 Apr 2026Studio4212,413AED 1.02M
Mar 2026 · 1 sale
27 Mar 2026Studio4172,362AED 985k
Feb 2026 · 8 sales
18 Feb 2026Studio4142,480AED 1.03M
17 Feb 2026Studio3982,428AED 966k
10 Feb 20261 bed9042,252AED 2.04M
10 Feb 20261 bed8972,347AED 2.11M
10 Feb 2026Studio4212,555AED 1.08M
10 Feb 2026Studio4052,558AED 1.04M
10 Feb 2026Studio3992,563AED 1.02M
2 Feb 2026Studio4142,483AED 1.03M
Jan 2026 · 15 sales
19 Jan 20262 beds1,2292,264AED 2.78M
16 Jan 2026Studio4172,411AED 1.01M
16 Jan 2026Studio4212,421AED 1.02M
15 Jan 20261 bed7042,424AED 1.71M
14 Jan 2026Studio3992,432AED 970k
12 Jan 2026Studio4152,366AED 982k
12 Jan 2026Studio3982,564AED 1.02M
12 Jan 2026Studio4172,361AED 985k
12 Jan 2026Studio3982,630AED 1.05M
12 Jan 2026Studio4152,290AED 950k
12 Jan 20261 bed7012,177AED 1.53M
12 Jan 20262 beds1,0522,242AED 2.36M
6 Jan 20262 beds1,0522,313AED 2.43M
5 Jan 2026Studio4142,480AED 1.03M
2 Jan 2026Studio4222,560AED 1.08M
Dec 2025 · 23 sales
30 Dec 2025Studio4142,300AED 952k
30 Dec 2025Studio4052,517AED 1.02M
30 Dec 2025Studio4152,749AED 1.14M
23 Dec 2025Studio4152,290AED 950k
18 Dec 2025Studio3982,467AED 982k
17 Dec 2025Studio4152,465AED 1.02M
16 Dec 2025Studio4222,379AED 1M
16 Dec 2025Studio4152,544AED 1.06M
16 Dec 2025Studio4152,544AED 1.06M
16 Dec 2025Studio4132,378AED 982k
15 Dec 2025Studio4172,540AED 1.06M
11 Dec 20251 bed9042,349AED 2.12M
11 Dec 2025Studio4222,558AED 1.08M
11 Dec 2025Studio4022,640AED 1.06M
10 Dec 20251 bed7012,399AED 1.68M
10 Dec 2025Studio4152,414AED 1M

Homes

193 homes by size

  • Studio73%140 homes · 398–441 sq ft · 5 layouts
  • 1 bed20%38 homes · 643–1,037 sq ft · 5 layouts
  • 2 beds8%15 homes · 1,052–1,229 sq ft · 3 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.1M

Location

Drive times

  • Downtown Dubai15min
  • Dubai Airport (DXB)24min
  • Dubai Marina27min

By car. La Mer Beach, the nearest beach, is 2.1 km away.

Rated schools

  • JSS Private SchoolIndian · Very good3.6 kmaway
  • New Academy SchoolAmerican · Good3.8 kmaway

Getting around

  • Al Satwa RoadGold Line · opens 20328 minwalk
  • Emirates TowersRed Line11 minwalk
  • Al JaddafHigh-speed rail · planned6.1 kmaway
  • MeydanEtihad Rail · planned7.4 kmaway
  • Dubai InternationalDXB9.9 kmaway
Area guideAl SatwaFinished homesAED 1,738/sq ft1-bed rentAED 73k/yrGross yieldEstimate5.5%

Developer

  • 2 finished
  • 21 being built, on time
  • 4 past their planned date
  • 3 not started
Escrow bank
Abu Dhabi Islamic Bank
Legal name
OBJ1 Real Estate Development L.L.C

Also being built by Object 1

Object 1’s other projects
ProjectHandoverBuilt
Evergrin HouseAl SatwaQ2 2026Past planned date55%
The Fifth TowerJVCQ3 2026Past planned date55%
Luminar Tower 1Jumeirah Village TriangleQ4 2026Past planned date33%
Luminar Tower 2Jumeirah Village TriangleQ4 2026Past planned date31%
Vivid TowerJumeirah Village TriangleQ4 2026Being built12%
All 30 Object 1 projects
Questions

More questions about Evergrin House 2

From AED 1.02M for a 415 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.69M and 2-bed flats sell for about AED 2.65M.

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 10% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

193 homes on 8 floors: 140 studios of 398–441 sq ft, 38 1-bed flats of 643–1,037 sq ft and 15 2-bed flats of 1,052–1,229 sq ft.

About AED 53k a year for a studio, AED 73k for a 1-bed and AED 95k for a 2-bed in Al Satwa, a gross yield of about 5.5% Estimate.

Of Object 1’s 30 projects on DLD’s record, 2 are finished. Of the 25 being built, 4 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.1M.

In Jumeirah Garden City, Al Satwa, 15 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Emirates Towers Metro station on the Red Line is a 11-minute walk.

More nearby

How the numbers work

FromAED 1.02MSee it on the map