
Evergrin House 2
Jumeirah Garden CityObject 1
Evergrin House 2 is an off-plan project by Object 1 in Jumeirah Garden City, with 193 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 10% built.
- Built
- 10%
- Handover
- Q4 2026
- Sales in 12 months
- 127
- Homes
- 193
Progress
- Q3 2025Building started
- Oct 2026Last inspection · 10%
- Q4 2026Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 1.02M415 sq ft · 2,482 AED/sq ft · 90 sales
- 1 bed
- AED 1.69M704 sq ft · 2,349 AED/sq ft · 27 sales
- 2 beds
- AED 2.65M1,141 sq ft · 2,264 AED/sq ft · 10 sales
Against 28 Al Satwa off-plan projects with 10 or more sales
- Lowest1,773AED/sq ft
- Typical2,194AED/sq ft
- Evergrin House 22,428AED/sq ft
- Highest3,037AED/sq ft
6th highest of 28 · AED per sq ft in 12 months
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 18 Nov 2026 | Studio New | 398 | 2,479 | AED 987k |
| Sep 2026 · 1 sale | ||||
| 24 Sep 2026 | 1 bed | 701 | 2,163 | AED 1.52M |
| Jul 2026 · 1 sale | ||||
| 22 Jul 2026 | Studio | 398 | 2,522 | AED 1M |
| Jun 2026 · 4 sales | ||||
| 17 Jun 2026 | Studio | 421 | 2,413 | AED 1.02M |
| 4 Jun 2026 | Studio | 414 | 2,561 | AED 1.06M |
| 4 Jun 2026 | 1 bed | 643 | 2,356 | AED 1.52M |
| 4 Jun 2026 | Studio | 422 | 2,706 | AED 1.14M |
| May 2026 · 2 sales | ||||
| 25 May 2026 | 1 bed | 701 | 2,417 | AED 1.69M |
| 5 May 2026 | 1 bed | 643 | 2,451 | AED 1.58M |
| Apr 2026 · 1 sale | ||||
| 1 Apr 2026 | Studio | 421 | 2,413 | AED 1.02M |
| Mar 2026 · 1 sale | ||||
| 27 Mar 2026 | Studio | 417 | 2,362 | AED 985k |
| Feb 2026 · 8 sales | ||||
| 18 Feb 2026 | Studio | 414 | 2,480 | AED 1.03M |
| 17 Feb 2026 | Studio | 398 | 2,428 | AED 966k |
| 10 Feb 2026 | 1 bed | 904 | 2,252 | AED 2.04M |
| 10 Feb 2026 | 1 bed | 897 | 2,347 | AED 2.11M |
| 10 Feb 2026 | Studio | 421 | 2,555 | AED 1.08M |
| 10 Feb 2026 | Studio | 405 | 2,558 | AED 1.04M |
| 10 Feb 2026 | Studio | 399 | 2,563 | AED 1.02M |
| 2 Feb 2026 | Studio | 414 | 2,483 | AED 1.03M |
| Jan 2026 · 15 sales | ||||
| 19 Jan 2026 | 2 beds | 1,229 | 2,264 | AED 2.78M |
| 16 Jan 2026 | Studio | 417 | 2,411 | AED 1.01M |
| 16 Jan 2026 | Studio | 421 | 2,421 | AED 1.02M |
| 15 Jan 2026 | 1 bed | 704 | 2,424 | AED 1.71M |
| 14 Jan 2026 | Studio | 399 | 2,432 | AED 970k |
| 12 Jan 2026 | Studio | 415 | 2,366 | AED 982k |
| 12 Jan 2026 | Studio | 398 | 2,564 | AED 1.02M |
| 12 Jan 2026 | Studio | 417 | 2,361 | AED 985k |
| 12 Jan 2026 | Studio | 398 | 2,630 | AED 1.05M |
| 12 Jan 2026 | Studio | 415 | 2,290 | AED 950k |
| 12 Jan 2026 | 1 bed | 701 | 2,177 | AED 1.53M |
| 12 Jan 2026 | 2 beds | 1,052 | 2,242 | AED 2.36M |
| 6 Jan 2026 | 2 beds | 1,052 | 2,313 | AED 2.43M |
| 5 Jan 2026 | Studio | 414 | 2,480 | AED 1.03M |
| 2 Jan 2026 | Studio | 422 | 2,560 | AED 1.08M |
| Dec 2025 · 23 sales | ||||
| 30 Dec 2025 | Studio | 414 | 2,300 | AED 952k |
| 30 Dec 2025 | Studio | 405 | 2,517 | AED 1.02M |
| 30 Dec 2025 | Studio | 415 | 2,749 | AED 1.14M |
| 23 Dec 2025 | Studio | 415 | 2,290 | AED 950k |
| 18 Dec 2025 | Studio | 398 | 2,467 | AED 982k |
| 17 Dec 2025 | Studio | 415 | 2,465 | AED 1.02M |
| 16 Dec 2025 | Studio | 422 | 2,379 | AED 1M |
| 16 Dec 2025 | Studio | 415 | 2,544 | AED 1.06M |
| 16 Dec 2025 | Studio | 415 | 2,544 | AED 1.06M |
| 16 Dec 2025 | Studio | 413 | 2,378 | AED 982k |
| 15 Dec 2025 | Studio | 417 | 2,540 | AED 1.06M |
| 11 Dec 2025 | 1 bed | 904 | 2,349 | AED 2.12M |
| 11 Dec 2025 | Studio | 422 | 2,558 | AED 1.08M |
| 11 Dec 2025 | Studio | 402 | 2,640 | AED 1.06M |
| 10 Dec 2025 | 1 bed | 701 | 2,399 | AED 1.68M |
| 10 Dec 2025 | Studio | 415 | 2,414 | AED 1M |
Homes
193 homes by size
- Studio73%140 homes · 398–441 sq ft · 5 layouts
- 1 bed20%38 homes · 643–1,037 sq ft · 5 layouts
- 2 beds8%15 homes · 1,052–1,229 sq ft · 3 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.1MLocation
Drive times
- Downtown Dubai15min
- Dubai Airport (DXB)24min
- Dubai Marina27min
By car. La Mer Beach, the nearest beach, is 2.1 km away.
Rated schools
- JSS Private SchoolIndian · Very good3.6 kmaway
- New Academy SchoolAmerican · Good3.8 kmaway
Getting around
- Al Satwa RoadGold Line · opens 20328 minwalk
- Emirates TowersRed Line11 minwalk
- Al JaddafHigh-speed rail · planned6.1 kmaway
- MeydanEtihad Rail · planned7.4 kmaway
- Dubai InternationalDXB9.9 kmaway
Area guideAl SatwaFinished homesAED 1,738/sq ft1-bed rentAED 73k/yrGross yieldEstimate5.5%Developer
- 2 finished
- 21 being built, on time
- 4 past their planned date
- 3 not started
- Escrow bank
- Abu Dhabi Islamic Bank
- Legal name
- OBJ1 Real Estate Development L.L.C
Also being built by Object 1
| Project | Handover | Built |
|---|---|---|
| Evergrin HouseAl Satwa | Q2 2026Past planned date | 55% |
| The Fifth TowerJVC | Q3 2026Past planned date | 55% |
| Luminar Tower 1Jumeirah Village Triangle | Q4 2026Past planned date | 33% |
| Luminar Tower 2Jumeirah Village Triangle | Q4 2026Past planned date | 31% |
| Vivid TowerJumeirah Village Triangle | Q4 2026Being built | 12% |
More questions about Evergrin House 2
From AED 1.02M for a 415 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.69M and 2-bed flats sell for about AED 2.65M.
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 10% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.
193 homes on 8 floors: 140 studios of 398–441 sq ft, 38 1-bed flats of 643–1,037 sq ft and 15 2-bed flats of 1,052–1,229 sq ft.
About AED 53k a year for a studio, AED 73k for a 1-bed and AED 95k for a 2-bed in Al Satwa, a gross yield of about 5.5% Estimate.
Of Object 1’s 30 projects on DLD’s record, 2 are finished. Of the 25 being built, 4 are past their planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.1M.
In Jumeirah Garden City, Al Satwa, 15 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Emirates Towers Metro station on the Red Line is a 11-minute walk.
More nearby
Off-plan nearby
- AD ResidencesNo sales6% built · Planned Q2 2028
- The GrandalaFrom AED 1.67M86% built · Past planned date
- Trillium HeightsNo sales62% built · Past planned date
- The KeyNo sales0% built · Planned Q1 2029
- Mayfair Gardens by MajidFrom AED 1.72M70% built · Past planned date
- Prestige Gardens by Prestige OneNo sales0% built · Planned Q3 2028
Finished buildings nearby
Typical next door AED 3,008/sq ft · 1 building within a 10-minute walk