Trillium Heights
Jumeirah Garden CityEL Prime
Trillium Heights is an off-plan project by EL Prime in Jumeirah Garden City, with 56 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 62% built.
- Built
- 62%
- Handover
- Q4 2025
- Sales in 12 months
- 1
- Homes
- 56
Progress
- Q2 2024Building started
- Dec 2024 – Feb 2025Launch sales · 3
- Q4 2025Planned handover · passed
- Oct 2026Last inspection · 62%
Prices
Price per sq ft
Typical price by size
- 1 bed
- Not enough sales1 sale
Against 28 Al Satwa off-plan projects with 10 or more sales
- Lowest1,773AED/sq ft
- Typical2,194AED/sq ft
- Trillium Heights2,767AED/sq ft
- Highest3,037AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Apr 2026 · 1 sale | ||||
| 7 Apr 2026 | 1 bed | 759 | 2,767 | AED 2.1M |
Homes
56 homes by size
- Studio29%16 homes · 400–698 sq ft · 2 layouts
- 1 bed71%40 homes · 712–2,793 sq ft · 8 layouts
Location
Drive times
- Downtown Dubai15min
- Dubai Airport (DXB)24min
- Dubai Marina27min
By car. La Mer Beach, the nearest beach, is 2.1 km away.
Rated schools
- JSS Private SchoolIndian · Very good3.7 kmaway
- New Academy SchoolAmerican · Good3.7 kmaway
Getting around
- Al Satwa RoadGold Line · opens 20328 minwalk
- Emirates TowersRed Line10 minwalk
- Al JaddafHigh-speed rail · planned6.0 kmaway
- MeydanEtihad Rail · planned7.4 kmaway
- Dubai InternationalDXB9.8 kmaway
Area guideAl SatwaFinished homesAED 1,738/sq ft1-bed rentAED 73k/yrGross yieldEstimate5.5%Developer
EL Prime
- 1 past their planned date
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Grenorbit Real Estate Development L.L.C
More questions about Trillium Heights
Q4 2025, the planned date in DLD’s register.
No. It is 11 months past its planned date, and was 62% built at DLD’s last inspection on 26 Oct 2026.
56 homes on 8 floors: 16 studios of 400–698 sq ft and 40 1-bed flats of 712–2,793 sq ft.
About AED 53k a year for a studio and AED 73k for a 1-bed in Al Satwa, a gross yield of about 5.5% Estimate.
Of EL Prime’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.
In Jumeirah Garden City, Al Satwa, 15 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Emirates Towers Metro station on the Red Line is a 10-minute walk.
More nearby
Off-plan nearby
- Prestige Gardens by Prestige OneNo sales0% built · Planned Q3 2028
- Mayfair Gardens by MajidFrom AED 1.72M70% built · Past planned date
- The KeyNo sales0% built · Planned Q1 2029
- Evergrin House 2From AED 1.02M10% built · Planned Q4 2026
- Enso JadeFrom AED 1.62M42% built · Past planned date
- The GrandalaFrom AED 1.67M86% built · Past planned date
Finished buildings nearby
Typical next door AED 3,008/sq ft · 1 building within a 10-minute walk