Skip to content

Luminar Tower 1

Jumeirah Village TriangleObject 1

FromAED 1.04M1 bed · 711 sq ft

Luminar Tower 1 is an off-plan project by Object 1 in Jumeirah Village Triangle, with 196 homes on 20 floors. DLD’s last inspection, on 26 Oct 2026, found it 33% built.

Built
33%
Handover
Q4 2026
Since launch
Down 4%1 bed price per sq ft
Homes
196

Progress

33%built
  1. Q3 2024Building started
  2. Oct–Dec 2024Launch sales · 88
  3. Q4 2026Planned handover
  4. Oct 2026Last inspection · 33%

Prices

Price per sq ft

1,472 AED/sq ft22 sales in 12 months

Typical price by size

1 bed
AED 1.04M711 sq ft · 22 sales

Against 26 Jumeirah Village Triangle off-plan projects with 10 or more sales

  • Lowest1,251AED/sq ft
  • Luminar Tower 11,472AED/sq ft
  • Typical1,604AED/sq ft
  • Highest1,950AED/sq ft

6th lowest of 26 · AED per sq ft in 12 months

Latest sales

Newest first
22 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Sep 2026 · 1 sale
8 Sep 20261 bed5771,532AED 884k
Jul 2026 · 2 sales
29 Jul 20261 bed7121,522AED 1.08M
3 Jul 20261 bed9951,499AED 1.49M
Jun 2026 · 1 sale
8 Jun 20261 bed9951,396AED 1.39M
May 2026 · 1 sale
13 May 20261 bed9951,474AED 1.47M
Apr 2026 · 3 sales
29 Apr 20261 bed9951,049AED 1.04M
20 Apr 20261 bed7571,472AED 1.11M
20 Apr 20261 bed7571,472AED 1.11M
Mar 2026 · 1 sale
5 Mar 20261 bed5751,789AED 1.03M
Feb 2026 · 4 sales
18 Feb 20261 bed5751,429AED 822k
18 Feb 20261 bed5781,432AED 828k
18 Feb 20261 bed7571,237AED 937k
11 Feb 20261 bed5771,425AED 822k
Jan 2026 · 4 sales
29 Jan 20261 bed5771,608AED 928k
20 Jan 20261 bed5751,504AED 865k
14 Jan 20261 bed5771,051AED 606k
14 Jan 20261 bed9951,049AED 1.04M
Dec 2025 · 3 sales
23 Dec 20251 bed7091,548AED 1.1M
22 Dec 20251 bed5791,279AED 741k
15 Dec 20251 bed7571,867AED 1.41M
Nov 2025 · 2 sales
10 Nov 20251 bed5791,366AED 791k
3 Nov 20251 bed7571,556AED 1.18M

Homes

196 homes by size

  • 1 bed100%196 homes · 577–1,267 sq ft · 8 layouts

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)35min
  • Dubai Marina18min

By car. JBR Beach, the nearest beach, is 6.8 km away.

Rated schools

  • EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good3.9 kmaway
  • Victory Heights Primary SchoolUK · Outstanding4.4 kmaway

Getting around

  • Dubai Production CityGold Line · opens 203222 minwalk
  • Al YalayisEtihad Rail2.5 kmaway
  • Jumeirah Golf EstatesRed Line2.7 kmaway
  • Al Maktoum AirportHigh-speed rail · planned16 kmaway
  • Al Maktoum InternationalDWC16 kmaway
Area guideJumeirah Village TriangleFinished homesAED 1,337/sq ft1-bed rentAED 72k/yrGross yieldEstimate7.5%

Developer

  • 2 finished
  • 21 being built, on time
  • 4 past their planned date
  • 3 not started
Escrow bank
Abu Dhabi Islamic Bank
Legal name
OBJ1 Real Estate Development L.L.C

Also being built by Object 1

Object 1’s other projects
ProjectHandoverBuilt
Evergrin HouseAl SatwaQ2 2026Past planned date55%
The Fifth TowerJVCQ3 2026Past planned date55%
Luminar Tower 2Jumeirah Village TriangleQ4 2026Past planned date31%
Vivid TowerJumeirah Village TriangleQ4 2026Being built12%
Evergrin House 2Al SatwaQ4 2026Being built10%
All 30 Object 1 projects
Questions

More questions about Luminar Tower 1

From AED 1.04M for a 711 sq ft 1-bed, the lowest typical price paid in the 12 months.

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 33% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

196 homes on 20 floors: 196 1-bed flats of 577–1,267 sq ft.

Down 4% for 1-bed flats, per sq ft.

About AED 72k a year for a 1-bed in Jumeirah Village Triangle, a gross yield of about 7.5% Estimate.

Of Object 1’s 30 projects on DLD’s record, 2 are finished. Of the 25 being built, 4 are past their planned date.

In Jumeirah Village Triangle, 26 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 2.7 km away.

More nearby

How the numbers work

FromAED 1.04MSee it on the map