Rosemont Residences
Jumeirah Village TriangleEllington
Rosemont Residences is an off-plan project by Ellington in Jumeirah Village Triangle, with 47 homes on 7 floors. DLD’s last inspection, on 26 Oct 2026, found it 43% built.
- Built
- 43%
- Handover
- Not on record
- Sales in 12 months
- 1
- Homes
- 47
Progress
- Q1 2024Building started
- May–Jul 2024Launch sales · 27
- Oct 2026Last inspection · 43%
Prices
Price per sq ft
Typical price by size
- 1 bed
- Not enough sales1 sale
Against 26 Jumeirah Village Triangle off-plan projects with 10 or more sales
- Lowest1,251AED/sq ft
- Rosemont Residences1,554AED/sq ft
- Typical1,604AED/sq ft
- Highest1,950AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Apr 2026 · 1 sale | ||||
| 1 Apr 2026 | 1 bed | 798 | 1,554 | AED 1.24M |
Homes
47 homes by size
- 1 bed40%19 homes · 798–814 sq ft · 2 layouts
- 2 beds60%28 homes · 1,025–1,251 sq ft · 6 layouts
Location
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)35min
- Dubai Marina18min
By car. JBR Beach, the nearest beach, is 6.8 km away.
Rated schools
- EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good3.9 kmaway
- Victory Heights Primary SchoolUK · Outstanding4.2 kmaway
Getting around
- Dubai Production CityGold Line · opens 203220 minwalk
- Al YalayisEtihad Rail2.6 kmaway
- Jumeirah Golf EstatesRed Line2.8 kmaway
- Al Maktoum AirportHigh-speed rail · planned16 kmaway
- Al Maktoum InternationalDWC16 kmaway
Area guideJumeirah Village TriangleFinished homesAED 1,337/sq ft1-bed rentAED 72k/yrGross yieldEstimate7.5%Developer
- 18 finished
- 25 being built, on time
- 7 past their planned date
- 1 not started
- Escrow bank
- Abu Dhabi Commercial Bank
- Legal name
- Ellington Properties Development L.L.C
Also being built by Ellington
| Project | Handover | Built |
|---|---|---|
| The PortmanJVC | Q3 2025Past planned date | 79% |
| UH West BY EllingtonJLT | Q1 2026Past planned date | 71% |
| UH East BY EllingtonJLT | Q1 2026Past planned date | 47% |
| The QuaysideBusiness Bay | Q1 2026Past planned date | 55% |
| The Waterside Villas BY EllingtonMajan | Q2 2026Past planned date | 32% |
More questions about Rosemont Residences
47 homes on 7 floors: 19 1-bed flats of 798–814 sq ft and 28 2-bed flats of 1,025–1,251 sq ft.
About AED 72k a year for a 1-bed and AED 95k for a 2-bed in Jumeirah Village Triangle, a gross yield of about 7.5% Estimate.
Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.
In Jumeirah Village Triangle, 26 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 2.8 km away.
More nearby
Off-plan nearby
- Interstellar TowerFrom AED 1.21M0% built · Planned Q3 2028
- Haus 99 ResidencesNo sales0% built · Planned Q4 2028
- Luminar Tower 1From AED 1.04M33% built · Planned Q4 2026
- Luminar Tower 2From AED 932k31% built · Planned Q4 2026
- Red SquareFrom AED 606k27% built · Handover not on record
- Luminar Tower 3From AED 746k14% built · Planned Q1 2027
Finished buildings nearby
Typical next door AED 1,267/sq ft · 6 buildings within a 10-minute walk
- Plazzo Residence879AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Edmonton Elm860AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Forum Heights1,452AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Al Jawhara Tower1,145AED/sq ftNot enough rents · 10-minute walk
- Milestone Residences1,446AED/sq ft1-bed rent AED 87k/yr · 10-minute walk
- Maya Residences 51,388AED/sq ft1-bed rent AED 76k/yr · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr
- Imperial Residence1,005AED/sq ft1-bed rent AED 60k/yr
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr
- Seslia Tower1,330AED/sq ft1-bed rent AED 66k/yr
