Red Square
Jumeirah Village TriangleTiger Properties
Red Square is an off-plan project by Tiger Properties in Jumeirah Village Triangle, with 830 homes on 37 floors. DLD’s last inspection, on 26 Oct 2026, found it 27% built.
- Built
- 27%
- Handover
- Not on record
- Since launch
- Up 5%Studio price per sq ft
- Homes
- 830
Progress
- Q1 2024Building started
- Apr–Jun 2024Launch sales · 47
- Oct 2026Last inspection · 27%
Prices
Price per sq ft
Typical price by size
- Studio
- AED 606k324 sq ft · 1,836 AED/sq ft · 38 sales
- 1 bed
- AED 970k623 sq ft · 1,591 AED/sq ft · 29 sales
- 2 beds
- AED 1.52M916 sq ft · 1,652 AED/sq ft · 20 sales
Against 26 Jumeirah Village Triangle off-plan projects with 10 or more sales
- Lowest1,251AED/sq ft
- Typical1,604AED/sq ft
- Red Square1,712AED/sq ft
- Highest1,950AED/sq ft
9th highest of 26 · AED per sq ft in 12 months
Latest sales
Plus 2 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 10 Nov 2026 | Studio New | 329 | 1,998 | AED 657k |
| 2 Nov 2026 | 1 bed New | 564 | 1,572 | AED 887k |
| Oct 2026 · 3 sales | ||||
| 27 Oct 2026 | Studio | 381 | 1,721 | AED 656k |
| 12 Oct 2026 | 1 bed | 559 | 1,590 | AED 889k |
| 7 Oct 2026 | Studio | 329 | 1,889 | AED 621k |
| Sep 2026 · 1 sale | ||||
| 14 Sep 2026 | 1 bed | 597 | 1,555 | AED 929k |
| Jul 2026 · 1 sale | ||||
| 24 Jul 2026 | Studio | 381 | 1,837 | AED 700k |
| Jun 2026 · 9 sales | ||||
| 29 Jun 2026 | 1 bed | 564 | 1,572 | AED 887k |
| 24 Jun 2026 | Studio | 320 | 1,668 | AED 534k |
| 24 Jun 2026 | Studio | 326 | 1,903 | AED 620k |
| 22 Jun 2026 | Studio | 317 | 1,836 | AED 582k |
| 18 Jun 2026 | 2 beds | 916 | 1,646 | AED 1.51M |
| 18 Jun 2026 | Studio | 320 | 1,954 | AED 625k |
| 15 Jun 2026 | Studio | 326 | 1,816 | AED 592k |
| 15 Jun 2026 | Studio | 322 | 1,647 | AED 530k |
| 1 Jun 2026 | 1 bed | 660 | 1,586 | AED 1.05M |
| May 2026 · 8 sales | ||||
| 19 May 2026 | Studio | 303 | 2,020 | AED 612k |
| 19 May 2026 | 2 beds | 916 | 1,837 | AED 1.68M |
| 19 May 2026 | 1 bed | 660 | 1,878 | AED 1.24M |
| 18 May 2026 | Studio | 329 | 1,712 | AED 563k |
| 18 May 2026 | Studio | 317 | 1,806 | AED 572k |
| 18 May 2026 | 1 bed | 660 | 1,625 | AED 1.07M |
| 11 May 2026 | Studio | 320 | 1,983 | AED 635k |
| 4 May 2026 | 1 bed | 652 | 1,705 | AED 1.11M |
| Apr 2026 · 2 sales | ||||
| 27 Apr 2026 | Studio | 303 | 1,818 | AED 551k |
| 22 Apr 2026 | 1 bed | 559 | 1,511 | AED 845k |
| Feb 2026 · 7 sales | ||||
| 18 Feb 2026 | 2 beds | 916 | 1,588 | AED 1.46M |
| 18 Feb 2026 | Studio | 381 | 1,848 | AED 704k |
| 17 Feb 2026 | Studio | 382 | 1,901 | AED 726k |
| 16 Feb 2026 | 1 bed | 559 | 1,567 | AED 876k |
| 5 Feb 2026 | Studio | 326 | 1,633 | AED 532k |
| 4 Feb 2026 | 2 beds | 916 | 1,390 | AED 1.27M |
| 3 Feb 2026 | Studio | 382 | 1,959 | AED 748k |
| Jan 2026 · 3 sales | ||||
| 28 Jan 2026 | Studio | 326 | 1,938 | AED 632k |
| 21 Jan 2026 | 1 bed | 559 | 1,580 | AED 883k |
| 6 Jan 2026 | 1 bed | 559 | 1,564 | AED 874k |
| Dec 2025 · 30 sales | ||||
| 29 Dec 2025 | 1 bed | 597 | 1,727 | AED 1.03M |
| 25 Dec 2025 | Studio | 382 | 2,029 | AED 775k |
| 24 Dec 2025 | Studio | 326 | 1,816 | AED 592k |
| 18 Dec 2025 | Studio | 317 | 1,944 | AED 616k |
| 18 Dec 2025 | 1 bed | 652 | 1,488 | AED 970k |
| 18 Dec 2025 | 2 beds | 916 | 1,727 | AED 1.58M |
| 17 Dec 2025 | Studio | 381 | 1,853 | AED 706k |
| 17 Dec 2025 | Studio | 303 | 1,732 | AED 525k |
| 17 Dec 2025 | 1 bed | 652 | 1,394 | AED 909k |
| 16 Dec 2025 | 1 bed | 559 | 1,715 | AED 959k |
| 15 Dec 2025 | 1 bed | 559 | 1,656 | AED 926k |
| 15 Dec 2025 | Studio | 320 | 1,878 | AED 601k |
| 15 Dec 2025 | 1 bed | 652 | 1,335 | AED 871k |
| 12 Dec 2025 | Studio | 382 | 1,825 | AED 697k |
Homes
830 homes by size
- Studio50%412 homes · 303–382 sq ft · 6 layouts
- 1 bed36%300 homes · 559–918 sq ft · 9 layouts
- 2 beds14%118 homes · 922 sq ft · 1 layout
Location
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)35min
- Dubai Marina18min
By car. JBR Beach, the nearest beach, is 6.8 km away.
Rated schools
- EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good3.8 kmaway
- Victory Heights Primary SchoolUK · Outstanding4.1 kmaway
Getting around
- Dubai Production CityGold Line · opens 203220 minwalk
- Al YalayisEtihad Rail2.9 kmaway
- Jumeirah Golf EstatesRed Line3.1 kmaway
- Al Maktoum AirportHigh-speed rail · planned16 kmaway
- Al Maktoum InternationalDWC16 kmaway
Area guideJumeirah Village TriangleFinished homesAED 1,337/sq ft1-bed rentAED 72k/yrGross yieldEstimate7.5%Developer
- 18 finished
- 8 being built, on time
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Tiger Properties
Also being built by Tiger Properties
| Project | Handover | Built |
|---|---|---|
| Jade TowerMajan | Q1 2027Being built | 11% |
| Guzel TowersJumeirah Village Triangle | Q4 2027Being built | 7% |
| Sky Gate TowerJumeirah Village Triangle | Q1 2028Being built | 5% |
| Ananda ResidencesMotor City | Q2 2028Being built | 3% |
| Auresta TowerJVC | Q4 2028Being built | 4% |
More questions about Red Square
From AED 606k for a 324 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 970k and 2-bed flats sell for about AED 1.52M.
830 homes on 37 floors: 412 studios of 303–382 sq ft, 300 1-bed flats of 559–918 sq ft and 118 2-bed flats of 922 sq ft.
Up 9% for 1-bed flats, per sq ft. Against the launch sales of Apr 2024 – Jun 2024: studios up 5%.
About AED 47k a year for a studio, AED 72k for a 1-bed and AED 95k for a 2-bed in Jumeirah Village Triangle, a gross yield of about 7.5% Estimate.
Of Tiger Properties’ 26 projects on DLD’s record, 18 are finished. Of the 8 being built, none is past its planned date.
In Jumeirah Village Triangle, 26 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.1 km away.
More nearby
Off-plan nearby
- Enaya ResidencesFrom AED 1.2M39% built · Past planned date
- Essenlife ResidenceFrom AED 819k7% built · Planned Q1 2028
- Haus 99 ResidencesNo sales0% built · Planned Q4 2028
- Rosemont ResidencesNo sales43% built · Handover not on record
- Sonate Residences by CondorFrom AED 887k74% built · Handover not on record
- Elaris RiseFrom AED 789k2% built · Planned Q3 2028
Finished buildings nearby
Typical next door AED 1,341/sq ft · 7 buildings within a 10-minute walk
- Edmonton Elm860AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Forum Heights1,452AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Milestone Residences1,446AED/sq ft1-bed rent AED 87k/yr · 10-minute walk
- Plazzo Residence879AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Bali Residences1,341AED/sq ft1-bed rent AED 77k/yr · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr · 10-minute walk
- Al Jawhara Tower1,145AED/sq ftNot enough rents · 10-minute walk
- Imperial Residence1,005AED/sq ft1-bed rent AED 60k/yr
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr
- Seslia Tower1,330AED/sq ft1-bed rent AED 66k/yr
- The Ivy1,323AED/sq ft1-bed rent AED 85k/yr
