Skip to content

Ananda Residences

Motor CityTiger Properties

FromAED 504kStudio · 367 sq ft

Ananda Residences is an off-plan project by Tiger Properties in Motor City, with 1,020 homes on 47 floors. DLD’s last inspection, on 26 Oct 2026, found it 3% built.

Built
3%
Handover
Q2 2028
Sales in 12 months
165
Homes
1,020

Progress

3%built
  1. Q1 2025Building started
  2. Oct 2026Last inspection · 3%
  3. Q2 2028Planned handover

Prices

Price per sq ft

1,322 AED/sq ft165 sales in 12 months

Typical price by size

Studio
AED 504k367 sq ft · 1,337 AED/sq ft · 126 sales
1 bed
AED 954k747 sq ft · 1,277 AED/sq ft · 31 sales
2 beds
AED 1.29M1,120 sq ft · 1,160 AED/sq ft · 6 sales
3 beds
Not enough sales2 sales

Against 10 Motor City off-plan projects with 10 or more sales

  • Ananda Residences1,322AED/sq ft
  • Typical1,823AED/sq ft
  • Highest2,044AED/sq ft

Lowest of 10 · AED per sq ft in 12 months

Latest sales

Plus 2 newer sales, newest first
165 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
20 Nov 20261 bed New7471,052AED 786k
12 Nov 20261 bed New7471,055AED 788k
Oct 2026 · 2 sales
6 Oct 2026Studio3672,319AED 851k
5 Oct 2026Studio4031,448AED 584k
Sep 2026 · 3 sales
28 Sep 20261 bed7471,679AED 1.25M
4 Sep 20261 bed7471,989AED 1.49M
1 Sep 20262 beds1,1281,780AED 2.01M
Aug 2026 · 4 sales
19 Aug 20261 bed7471,167AED 872k
10 Aug 20261 bed7471,765AED 1.32M
10 Aug 20261 bed7261,798AED 1.31M
5 Aug 2026Studio4031,535AED 619k
Jul 2026 · 4 sales
23 Jul 2026Studio4031,343AED 541k
21 Jul 20261 bed7471,848AED 1.38M
20 Jul 2026Studio4032,231AED 899k
20 Jul 2026Studio4032,127AED 857k
Jun 2026 · 7 sales
29 Jun 20261 bed7471,765AED 1.32M
10 Jun 2026Studio3672,189AED 803k
10 Jun 2026Studio4032,220AED 895k
10 Jun 20261 bed7471,740AED 1.3M
9 Jun 20261 bed7471,190AED 889k
9 Jun 2026Studio3671,457AED 535k
1 Jun 2026Studio4031,409AED 568k
May 2026 · 8 sales
22 May 2026Studio3671,356AED 498k
18 May 20261 bed7261,278AED 928k
18 May 2026Studio3671,536AED 564k
18 May 2026Studio4032,135AED 861k
11 May 20261 bed7471,167AED 872k
11 May 2026Studio4032,160AED 870k
11 May 2026Studio4031,439AED 580k
11 May 2026Studio3671,567AED 575k
Apr 2026 · 5 sales
28 Apr 2026Studio4031,477AED 595k
22 Apr 2026Studio3672,055AED 754k
22 Apr 2026Studio3671,345AED 493k
13 Apr 2026Studio3671,552AED 570k
7 Apr 20262 beds1,1111,095AED 1.22M
Mar 2026 · 4 sales
18 Mar 20261 bed8251,620AED 1.34M
10 Mar 2026Studio3751,437AED 539k
9 Mar 20261 bed7471,740AED 1.3M
5 Mar 2026Studio3671,170AED 429k
Feb 2026 · 12 sales
27 Feb 2026Studio4031,864AED 751k
27 Feb 2026Studio3671,906AED 700k
27 Feb 2026Studio4031,206AED 486k
16 Feb 2026Studio3672,728AED 1M
16 Feb 2026Studio3671,541AED 565k
16 Feb 2026Studio4031,416AED 571k
16 Feb 20261 bed7471,513AED 1.13M
16 Feb 2026Studio3672,173AED 797k
16 Feb 2026Studio4331,331AED 576k
16 Feb 2026Studio3672,168AED 796k
16 Feb 2026Studio3671,537AED 564k

Homes

1,020 homes by size

  • Studio33%340 homes · 367–441 sq ft · 6 layouts
  • 1 bed47%480 homes · 726–832 sq ft · 4 layouts
  • 2 beds17%176 homes · 1,111–1,153 sq ft · 3 layouts
  • 3 beds2%24 homes · 1,992–2,027 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai28min
  • Dubai Airport (DXB)35min
  • Dubai Marina23min

By car. JBR Beach, the nearest beach, is 10.3 km away.

Rated schools

  • Dwight SchoolInternational Baccalaureate · Good1.3 kmaway
  • Victory Heights Primary SchoolUK · Outstanding1.4 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 20322.2 kmaway
  • Al YalayisEtihad Rail6.8 kmaway
  • Jumeirah Golf EstatesRed Line7.2 kmaway
  • Al Maktoum AirportHigh-speed rail · planned18 kmaway
  • Al Maktoum InternationalDWC18 kmaway
Area guideMotor CityFinished homesAED 1,000/sq ft1-bed rentAED 73k/yrGross yieldEstimate7.6%

Developer

  • 18 finished
  • 8 being built, on time
Escrow bank
First Abu Dhabi Bank
Legal name
Tiger Properties

Also being built by Tiger Properties

Tiger Properties’ other projects
ProjectHandoverBuilt
Jade TowerMajanQ1 2027Being built11%
Guzel TowersJumeirah Village TriangleQ4 2027Being built7%
Sky Gate TowerJumeirah Village TriangleQ1 2028Being built5%
Auresta TowerJVCQ4 2028Being built4%
Red SquareJumeirah Village TriangleNot on recordBeing built27%
All 26 Tiger Properties projects
Questions

More questions about Ananda Residences

From AED 504k for a 367 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 954k and 2-bed flats sell for about AED 1.29M.

Q2 2028, the planned date in DLD’s register.

It is not past its planned date. It was 3% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 19 months.

1,020 homes on 47 floors: 340 studios of 367–441 sq ft, 480 1-bed flats of 726–832 sq ft, 176 2-bed flats of 1,111–1,153 sq ft and 24 3-bed flats of 1,992–2,027 sq ft.

About AED 52k a year for a studio, AED 73k for a 1-bed, AED 118k for a 2-bed and AED 165k for a 3-bed in Motor City, a gross yield of about 7.6% Estimate.

Of Tiger Properties’ 26 projects on DLD’s record, 18 are finished. Of the 8 being built, none is past its planned date.

In Motor City, 28 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 7.2 km away.

More nearby

How the numbers work

FromAED 504kSee it on the map