Monarch
Motor CityZane
Monarch is an off-plan project by Zane in Motor City, with 46 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 20% built.
- Built
- 20%
- Handover
- Q4 2026
- Sales in 12 months
- No sales
- Homes
- 46
Progress
- Q2 2025Building started
- Q4 2026Planned handover
- Oct 2026Last inspection · 20%
- Q1 2027Developer’s date
Location
Drive times
- Downtown Dubai31min
- Dubai Airport (DXB)35min
- Dubai Marina28min
By car. JBR Beach, the nearest beach, is 10.5 km away.
Rated schools
- Nord Anglia International SchoolUK · Outstanding1.2 kmaway
- Dwight SchoolInternational Baccalaureate · Good1.9 kmaway
Getting around
- Dubai Miracle GardenGold Line · opens 203226 minwalk
- Al YalayisEtihad Rail7.5 kmaway
- Jumeirah Golf EstatesRed Line7.8 kmaway
- Al Maktoum AirportHigh-speed rail · planned19 kmaway
- Al Maktoum InternationalDWC19 kmaway
Area guideMotor CityFinished homesAED 1,000/sq ft1-bed rentAED 73k/yrGross yieldEstimate7.6%Developer
Zane
Zane’s website- 1 past their planned date
- Escrow bank
- Mashreq Bank
- Legal name
- Zane Developments L.L.C
More questions about Monarch
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 20% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.
About AED 52k a year for a studio, AED 73k for a 1-bed, AED 118k for a 2-bed and AED 165k for a 3-bed in Motor City, a gross yield of about 7.6% Estimate.
Of Zane’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.
In Motor City, 31 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 7.8 km away.
More nearby
Off-plan nearby
- Binghatti SkyterracesFrom AED 815k7% built · Planned Q4 2027
- Capital OneNo sales20% built · Planned Q1 2027
- TakayaFrom AED 783k16% built · Planned Q4 2027
- Ananda ResidencesFrom AED 504k3% built · Planned Q2 2028
- Beverly GrandeFrom AED 791k0% built · Planned Q4 2027
- Sierra by ImanFrom AED 858k4% built · Planned Q2 2029