ME DO RE Business
Jumeirah Lake TowersMe Do Re
ME DO RE Business is an off-plan project by Me Do Re in Jumeirah Lake Towers, with 293 homes on 46 floors. DLD’s last inspection, on 26 Oct 2026, found it 24% built.
- Built
- 24%
- Handover
- Q3 2029
- Sales in 12 months
- No sales
- Homes
- 293
Progress
- Q4 2025Building started
- Oct 2026Last inspection · 24%
- Q3 2029Planned handover
Location
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)39min
- Dubai Marina14min
By car. JBR Beach, the nearest beach, is 1.8 km away.
Rated schools
- EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good1.3 kmaway
- Regent International Private SchoolUK · Very good3.6 kmaway
Getting around
- DMCCRed Line10 minwalk
- Jumeirah Lakes TowersDubai Tram11 minwalk
- Al YalayisEtihad Rail6.2 kmaway
- Al Maktoum AirportHigh-speed rail · planned19 kmaway
- Al Maktoum InternationalDWC19 kmaway
Area guideJLTFinished homesAED 1,451/sq ft1-bed rentAED 82k/yrGross yieldEstimate7.1%Developer
- 1 finished
- 1 being built, on time
- 1 past their planned date
- Escrow bank
- Commercial Bank of Dubai
- Legal name
- ME DO RE Properties DMCC
More by Me Do Re
| Project | Handover | Built |
|---|---|---|
| ME DO RE 2JLT | Q4 2025Past planned date | 98% |
| ME DO REJLT | Q1 2024Finished |
More questions about ME DO RE Business
Q3 2029, the planned date in DLD’s register.
It is not past its planned date. It was 24% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
About AED 58k a year for a studio, AED 82k for a 1-bed, AED 120k for a 2-bed, AED 168k for a 3-bed and AED 285k for a 4+ bed in JLT, a gross yield of about 7.1% Estimate.
Of Me Do Re’s 3 projects on DLD’s record, 1 are finished. Of the 2 being built, 1 is past its planned date.
In Jumeirah Lake Towers, 26 minutes by car to Downtown Dubai and 39 to Dubai Airport (DXB). DMCC Metro station on the Red Line is a 10-minute walk.
More nearby
Off-plan nearby
- Me Do Re 2From AED 1.25M98% built · Past planned date
- UH East by EllingtonFrom AED 985k47% built · Past planned date
- Verde by SobhaFrom AED 1.86M85% built · Planned Q2 2027
- Serenia District - EastFrom AED 1.97M1% built · Planned Q2 2030
- Saba 4From AED 2.42M30% built · Planned Q2 2027
- UH West by EllingtonFrom AED 1.66M71% built · Past planned date
Finished buildings nearby
Typical next door AED 1,509/sq ft · 12 buildings within a 10-minute walk
- Concorde Tower1,252AED/sq ft1-bed rent AED 77k/yr · 10-minute walk
- Dubai Arch Tower1,474AED/sq ft1-bed rent AED 82k/yr · 10-minute walk
- Bonnington Tower Hotel & Residence Dubai1,767AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Lake Terrace1,596AED/sq ft1-bed rent AED 80k/yr · 10-minute walk
- Alshera Tower1,421AED/sq ft1-bed rent AED 86k/yr · 10-minute walk
- Lake City Tower1,339AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Gold Crest Views 21,683AED/sq ft1-bed rent AED 78k/yr · 10-minute walk
- Indigo Tower1,531AED/sq ft1-bed rent AED 85k/yr · 10-minute walk
- Global Lake View1,378AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Gold Crest Executive1,823AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Palladium1,487AED/sq ft1-bed rent AED 80k/yr · 10-minute walk
- MBL Residence2,023AED/sq ft1-bed rent AED 100k/yr · 10-minute walk
- New Dubai Gate 21,374AED/sq ft1-bed rent AED 83k/yr
- MBL Royal2,088AED/sq ft1-bed rent AED 115k/yr
- Icon 11,213AED/sq ftNot enough rents
- Orra The Embankment - Tower 11,415AED/sq ft1-bed rent AED 110k/yr
