Nejm 1

MajanDanf

Nejm 1 is an off-plan project by Danf in Majan, with 53 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q2 2027
Sales in 12 months
No sales
Homes
53

Progress

0%built
  1. Q1 2026Building started
  2. Oct 2026Last inspection · 0%
  3. Q2 2027Planned handover

Homes

53 homes by size

  • 1 bed57%30 homes · 689–1,123 sq ft · 6 layouts
  • 2 beds43%23 homes · 907–1,446 sq ft · 6 layouts

Location

Drive times

  • Downtown Dubai30min
  • Dubai Airport (DXB)27min
  • Dubai Marina32min

By car. Mercato Beach, the nearest beach, is 13.7 km away.

Rated schools

  • Repton SchoolUK/IB (Y 13) · Outstanding3.1 kmaway
  • GEMS Wellington Academy -FzeUK · Very good4.2 kmaway

Getting around

  • Nad Al ShebaGold Line · opens 20323.4 kmaway
  • MeydanEtihad Rail · planned5.4 kmaway
  • CreekGreen Line9.3 kmaway
  • Al JaddafHigh-speed rail · planned10 kmaway
  • Dubai InternationalDXB13 kmaway
Area guideMajanFinished homesAED 1,181/sq ft1-bed rentAED 65k/yrGross yieldEstimate6.6%

Developer

Danf

  • 1 being built, on time
Escrow bank
Not on record
Legal name
Danf Developments L.L.C
Questions

More questions about Nejm 1

Q2 2027, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.

53 homes on 5 floors: 30 1-bed flats of 689–1,123 sq ft and 23 2-bed flats of 907–1,446 sq ft.

About AED 65k a year for a 1-bed and AED 90k for a 2-bed in Majan, a gross yield of about 6.6% Estimate.

Of Danf’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.

In Majan, 30 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 9.3 km away.