Olivia Residences
Dubai Investments Park 1Karma
Olivia Residences is an off-plan project by Karma in Dubai Investments Park 1, with 229 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 38% built.
- Built
- 38%
- Handover
- Q1 2026
- Sales in 12 months
- No sales
- Homes
- 229
About
Olivia Residences is a 6-floor building of 229 homes in Dubai Investment Park First. Just over half the homes are 2-bed flats, with 1-bed and a few 3-bed flats. Shared spaces include an outdoor cinema, a Zen garden and an infinity pool, with a kids’ play area built round a water feature.
- Outdoor cinema
- Zen garden and meditation area
- Kids’ play area with water feature
Shared facilities
- Infinity pool
- Jacuzzi
- Sauna
- Panoramic indoor gym
- Yoga area
- Zen garden
- Outdoor cinema
- Kids’ play area with water feature
Progress
- Q4 2023Building started
- Q1 2026Planned handover · passed
- Oct 2026Last inspection · 38%
Homes
229 homes by size
- 1 bed42%96 homes · 635–1,410 sq ft · 8 layouts
- 2 beds50%115 homes · 943–1,973 sq ft · 14 layouts
- 3 beds8%18 homes · 1,331–1,490 sq ft · 3 layouts
Location
Drive times
- Downtown Dubai37min
- Dubai Airport (DXB)45min
- Dubai Marina26min
By car. JBR Beach, the nearest beach, is 10.0 km away.
Rated schools
- Greenfield International SchoolInternational Baccalaureate · Very good2.3 kmaway
- The Arbor SchoolUK · Good4.3 kmaway
Getting around
- Dubai Investment ParkRed Line26 minwalk
- Al YalayisEtihad Rail2.1 kmaway
- Al Maktoum AirportHigh-speed rail · planned11 kmaway
- Al Maktoum InternationalDWC11 kmaway
Developer
- 3 being built, on time
- 1 past their planned date
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Karma Real Estate Development L.L.C
Also being built by Karma
| Project | Handover | Built |
|---|---|---|
| Trinity By KarmaArjan | Q4 2026Being built | 31% |
| Milos By KarmaDubai Land Residence Complex | Q2 2027Being built | 0% |
| Antalya By KarmaDubai Sports City | Q3 2028Being built | 0% |
More questions about Olivia Residences
Q1 2026, the planned date in DLD’s register.
No. It is 8 months past its planned date, and was 38% built at DLD’s last inspection on 26 Oct 2026.
229 homes on 6 floors: 96 1-bed flats of 635–1,410 sq ft, 115 2-bed flats of 943–1,973 sq ft and 18 3-bed flats of 1,331–1,490 sq ft.
About AED 65k a year for a 1-bed, AED 85k for a 2-bed and AED 130k for a 3-bed in Dubai Investments Park 1.
Of Karma’s 4 projects on DLD’s record, 0 are finished. Of the 4 being built, 1 is past its planned date.
In Dubai Investments Park 1, 37 minutes by car to Downtown Dubai and 45 to Dubai Airport (DXB). Dubai Investment Park Metro station on the Red Line is a 26-minute walk.
