Verdana Residence 9
Dubai Investments Park 1Reportage
Verdana Residence 9 is an off-plan project by Reportage in Dubai Investments Park 1, with 256 homes on 15 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q1 2029
- Sales in 12 months
- No sales
- Homes
- 256
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 0%
- Q1 2029Planned handover
Homes
256 homes by size
- Studio30%78 homes · 391–467 sq ft · 5 layouts
- 1 bed30%78 homes · 680–963 sq ft · 7 layouts
- 2 beds39%100 homes · 996–2,387 sq ft · 6 layouts
Location
Drive times
- Downtown Dubai37min
- Dubai Airport (DXB)45min
- Dubai Marina26min
By car. JBR Beach, the nearest beach, is 10.4 km away.
Rated schools
- Greenfield International SchoolInternational Baccalaureate · Very good1.8 kmaway
- The Arbor SchoolUK · Good4.8 kmaway
Getting around
- Dubai Investment ParkRed Line2.1 kmaway
- Al YalayisEtihad Rail2.6 kmaway
- Al Maktoum AirportHigh-speed rail · planned11 kmaway
- Al Maktoum InternationalDWC11 kmaway
Developer
- 1 finished
- 12 being built, on time
- 4 past their planned date
- 9 not started
- Escrow bank
- Not on record
- Legal name
- Reportage Plus A Real Estate Development L.L.C
Also being built by Reportage
| Project | Handover | Built |
|---|---|---|
| Verdana (Phase 1)Dubai Investment Park First | Q4 2025Past planned date | 95% |
| Verdana ResidenceDubai Investment Park First | Q4 2025Past planned date | 96% |
| Verdana(Phase 2)Dubai Investment Park First | Q4 2025Past planned date | 94% |
| Verdana Residence 2Dubai Investment Park First | Q2 2026Past planned date | 20% |
| BiancaLiwan | Q4 2026Being built | 56% |
More questions about Verdana Residence 9
Q1 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.
256 homes on 15 floors: 78 studios of 391–467 sq ft, 78 1-bed flats of 680–963 sq ft and 100 2-bed flats of 996–2,387 sq ft.
About AED 31k a year for a studio, AED 65k for a 1-bed and AED 85k for a 2-bed in Dubai Investments Park 1.
Of Reportage’s 26 projects on DLD’s record, 1 are finished. Of the 16 being built, 4 are past their planned date.
In Dubai Investments Park 1, 37 minutes by car to Downtown Dubai and 45 to Dubai Airport (DXB). Dubai Investment Park Metro station on the Red Line is 2.1 km away.