Skip to content

Verdana Residence

Dubai Investments Park 1Reportage

Verdana Residence is an off-plan project by Reportage in Dubai Investments Park 1, with 224 homes on 10 floors. DLD’s last inspection, on 26 Oct 2026, found it 96% built.

Built
96%
Handover
Q4 2025
Sales in 12 months
No sales
Homes
224

Progress

96%built
  1. Q4 2022Building started
  2. Q4 2025Planned handover · passed
  3. Oct 2026Last inspection · 96%
11 months past the planned date

Homes

224 homes by size

  • Studio42%94 homes · 346–545 sq ft · 9 layouts
  • 1 bed40%90 homes · 610–707 sq ft · 8 layouts
  • 2 beds9%20 homes · 923–963 sq ft · 3 layouts
  • 3 beds9%20 homes · 1,144–1,316 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai36min
  • Dubai Airport (DXB)44min
  • Dubai Marina25min

By car. JBR Beach, the nearest beach, is 11.3 km away.

Rated schools

  • Greenfield International SchoolInternational Baccalaureate · Very good0.9 kmaway

Getting around

  • Dubai Investment ParkRed Line3.1 kmaway
  • Al YalayisEtihad Rail3.4 kmaway
  • Al Maktoum AirportHigh-speed rail · planned10 kmaway
  • Al Maktoum InternationalDWC10 kmaway
Area guideDubai Investments Park 1Finished homesNot enough sales1-bed rentAED 65k/yr

Developer

  • 1 finished
  • 12 being built, on time
  • 4 past their planned date
  • 9 not started
Escrow bank
Arab Bank for Investment & Foreign Trade Almasref
Legal name
Reportage Prime Properties L.L.C

Also being built by Reportage

Reportage’s other projects
ProjectHandoverBuilt
Verdana (Phase 1)Dubai Investment Park FirstQ4 2025Past planned date95%
Verdana(Phase 2)Dubai Investment Park FirstQ4 2025Past planned date94%
Verdana Residence 2Dubai Investment Park FirstQ2 2026Past planned date20%
BiancaLiwanQ4 2026Being built56%
Verdana 3Dubai Investment Park FirstQ3 2027Being built0%
All 26 Reportage projects
Questions

More questions about Verdana Residence

Q4 2025, the planned date in DLD’s register.

No. It is 11 months past its planned date, and was 96% built at DLD’s last inspection on 26 Oct 2026.

224 homes on 10 floors: 94 studios of 346–545 sq ft, 90 1-bed flats of 610–707 sq ft, 20 2-bed flats of 923–963 sq ft and 20 3-bed flats of 1,144–1,316 sq ft.

About AED 31k a year for a studio, AED 65k for a 1-bed, AED 85k for a 2-bed and AED 130k for a 3-bed in Dubai Investments Park 1.

Of Reportage’s 26 projects on DLD’s record, 1 are finished. Of the 16 being built, 4 are past their planned date.

In Dubai Investments Park 1, 36 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB). Dubai Investment Park Metro station on the Red Line is 3.1 km away.

More nearby

How the numbers work