Palm 01 by Binghatti
Palm JumeirahBinghatti
Palm 01 by Binghatti is an off-plan project by Binghatti in Palm Jumeirah, with 77 homes on 9 floors. DLD’s last inspection found it 4% built.
- Built
- 4%
- Handover
- Q2 2027
- Sales in 12 months
- No sales
- Homes
- 77
Progress
- Q2 2025Building started
- Jun 2026Last inspection · 4%
- Q2 2027Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
77 homes by size
- 2 beds73%56 homes · 1,292–1,453 sq ft · 8 layouts
- 3 beds13%10 homes · 2,850–3,490 sq ft · 8 layouts
- 4 beds9%7 homes · 3,218–8,479 sq ft · 6 layouts
- 5 beds4%3 homes · 7,049–7,326 sq ft · 2 layouts
- 6 beds1%1 home · 10,706 sq ft · 1 layout
Location
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)39min
- Dubai Marina14min
By car. JBR Beach, the nearest beach, is 3.4 km away.
Rated schools
- Dubai CollegeUK · Outstanding1.8 kmaway
- Regent International Private SchoolUK · Very good2.9 kmaway
Getting around
- Palm JumeirahDubai Tram14 minwalk
- Al Fardan ExchangeRed Line31 minwalk
- Al YalayisEtihad Rail9.9 kmaway
- Al JaddafHigh-speed rail · planned23 kmaway
- Al Maktoum InternationalDWC23 kmaway
Area guidePalm JumeirahFinished homesAED 2,737/sq ft1-bed rentAED 150k/yrGross yieldEstimate4.8%Developer
- 43 finished
- 21 being built, on time
- 15 past their planned date
- 5 not started
- Escrow bank
- Dubai Islamic Bank
- Legal name
- Binghatti Developers FZE
Also being built by Binghatti
| Project | Handover | Built |
|---|---|---|
| Bugatti Residences by BinghattiBusiness Bay | Q4 2025Past planned date | 66% |
| Binghatti AmberhallJVC | Q1 2026Past planned date | 38% |
| Binghatti RubyJVC | Q1 2026Past planned date | 46% |
| Binghatti HavenDubai Sports City | Q1 2026Past planned date | 76% |
| Binghatti StarlightSama Al Jadaf | Q1 2026Past planned date | 63% |
More questions about Palm 01 by Binghatti
Q2 2027, the planned date in DLD’s register.
It is not past its planned date. It was 4% built at DLD’s last inspection, with handover planned in 7 months.
77 homes on 9 floors: 56 2-bed flats of 1,292–1,453 sq ft, 10 3-bed flats of 2,850–3,490 sq ft, 7 4+ bed flats of 3,218–8,479 sq ft, 3 4+ bed flats of 7,049–7,326 sq ft and 1 4+ bed of 10,706 sq ft.
About AED 210k a year for a 2-bed, AED 300k for a 3-bed and AED 675k for a 4+ bed in Palm Jumeirah, a gross yield of about 4.8% Estimate.
Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.
In Palm Jumeirah, 26 minutes by car to Downtown Dubai and 39 to Dubai Airport (DXB). Al Fardan Exchange Metro station on the Red Line is a 31-minute walk.
More nearby
Off-plan nearby
- Ava at Palm Jumeirah by OmniyatNo sales96% built · Past planned date
- Como ResidencesFrom AED 52.92M25% built · Planned Q1 2027
- Della XNo sales0% built · Planned Q4 2028
- Olaia ResidencesFrom AED 4.67M14% built · Planned Q4 2027
- Maison Margiela ResidencesNo sales6% built · Planned Q1 2028
- Ocean HouseFrom AED 9.36M81% built · Handover not on record
Finished buildings nearby
Typical next door AED 2,759/sq ft · 9 buildings within a 10-minute walk
- Azure Residence2,909AED/sq ft1-bed rent AED 160k/yr · 10-minute walk
- Al Khushkar2,538AED/sq ftNot enough rents · 10-minute walk
- Al Dabas2,790AED/sq ftNot enough rents · 10-minute walk
- Al Hamri2,302AED/sq ftNot enough rents · 10-minute walk
- One at Palm Jumeirah9,070AED/sq ftNot enough rents · 10-minute walk
- Viceroy Hotel Resorts Residences2,631AED/sq ft1-bed rent AED 200k/yr · 10-minute walk
- Al Sultana2,759AED/sq ftNot enough rents · 10-minute walk
- Jash Falqa2,933AED/sq ftNot enough rents · 10-minute walk
- Abu Keibal2,361AED/sq ftNot enough rents · 10-minute walk
- Marina Residence2,219AED/sq ftNot enough rents
- Seven Hotel and Apartments The Palm3,510AED/sq ft1-bed rent AED 120k/yr
- Golden Mile1,942AED/sq ft1-bed rent AED 128k/yr
- The Palm Tower4,302AED/sq ft1-bed rent AED 240k/yr