Skip to content

Palm 01 by Binghatti

Palm JumeirahBinghatti

Palm 01 by Binghatti is an off-plan project by Binghatti in Palm Jumeirah, with 77 homes on 9 floors. DLD’s last inspection found it 4% built.

Built
4%
Handover
Q2 2027
Sales in 12 months
No sales
Homes
77

Progress

4%built
  1. Q2 2025Building started
  2. Jun 2026Last inspection · 4%
  3. Q2 2027Planned handover

DLD updates % built after each inspection, so work on site can be further along than this figure.

Homes

77 homes by size

  • 2 beds73%56 homes · 1,292–1,453 sq ft · 8 layouts
  • 3 beds13%10 homes · 2,850–3,490 sq ft · 8 layouts
  • 4 beds9%7 homes · 3,218–8,479 sq ft · 6 layouts
  • 5 beds4%3 homes · 7,049–7,326 sq ft · 2 layouts
  • 6 beds1%1 home · 10,706 sq ft · 1 layout

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)39min
  • Dubai Marina14min

By car. JBR Beach, the nearest beach, is 3.4 km away.

Rated schools

  • Dubai CollegeUK · Outstanding1.8 kmaway
  • Regent International Private SchoolUK · Very good2.9 kmaway

Getting around

  • Palm JumeirahDubai Tram14 minwalk
  • Al Fardan ExchangeRed Line31 minwalk
  • Al YalayisEtihad Rail9.9 kmaway
  • Al JaddafHigh-speed rail · planned23 kmaway
  • Al Maktoum InternationalDWC23 kmaway
Area guidePalm JumeirahFinished homesAED 2,737/sq ft1-bed rentAED 150k/yrGross yieldEstimate4.8%

Developer

  • 43 finished
  • 21 being built, on time
  • 15 past their planned date
  • 5 not started
Escrow bank
Dubai Islamic Bank
Legal name
Binghatti Developers FZE

Also being built by Binghatti

Binghatti’s other projects
ProjectHandoverBuilt
Bugatti Residences by BinghattiBusiness BayQ4 2025Past planned date66%
Binghatti AmberhallJVCQ1 2026Past planned date38%
Binghatti RubyJVCQ1 2026Past planned date46%
Binghatti HavenDubai Sports CityQ1 2026Past planned date76%
Binghatti StarlightSama Al JadafQ1 2026Past planned date63%
All 84 Binghatti projects
Questions

More questions about Palm 01 by Binghatti

Q2 2027, the planned date in DLD’s register.

It is not past its planned date. It was 4% built at DLD’s last inspection, with handover planned in 7 months.

77 homes on 9 floors: 56 2-bed flats of 1,292–1,453 sq ft, 10 3-bed flats of 2,850–3,490 sq ft, 7 4+ bed flats of 3,218–8,479 sq ft, 3 4+ bed flats of 7,049–7,326 sq ft and 1 4+ bed of 10,706 sq ft.

About AED 210k a year for a 2-bed, AED 300k for a 3-bed and AED 675k for a 4+ bed in Palm Jumeirah, a gross yield of about 4.8% Estimate.

Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.

In Palm Jumeirah, 26 minutes by car to Downtown Dubai and 39 to Dubai Airport (DXB). Al Fardan Exchange Metro station on the Red Line is a 31-minute walk.

More nearby

How the numbers work