Park Gate
Dubai Hills EstateEmaar
Park Gate is an off-plan project by Emaar in Dubai Hills Estate. DLD’s last inspection, on 26 Oct 2026, found it 90% built.
- Built
- 90%
- Handover
- Not on record
- Sales in 12 months
- No sales
- Homes
- Not on record
About
Park Gate is a community of villas in Dubai Hills Estate, set at the estate’s main entrance near Al Khail Road. Homes are 4-bed and 5-bed villas with floor-to-ceiling windows, wide balconies and garden roof terraces. Residents share padel and table tennis courts, BBQ areas and pocket parks along shaded lanes, with access to Dubai Hills Park.
- 4-bed and 5-bed villas
- Garden roof terraces
- At the estate’s main entrance
Shared facilities
- Gym
- Pools
- Kids’ play areas
- Padel court and table tennis
- Communal spaces
- BBQ areas
- Pocket parks
Progress
- Q2 2024Building started
- Oct 2026Last inspection · 90%
Location
Drive times
- Downtown Dubai20min
- Dubai Airport (DXB)30min
- Dubai Marina22min
By car. Jumeirah Public Beach, the nearest beach, is 8.6 km away.
Rated schools
- Safa Community SchoolUK · Outstanding3.0 kmaway
- GEMS WORLD ACADEMYInternational Baccalaureate · Very good3.1 kmaway
Getting around
- Dubai HillsGold Line · opens 203228 minwalk
- EquitiRed Line5.9 kmaway
- MeydanEtihad Rail · planned9.4 kmaway
- Al JaddafHigh-speed rail · planned17 kmaway
- Dubai InternationalDXB22 kmaway
Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- Emirates NBD Bank
- Legal name
- Dubai Hills Estate L.L.C
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Park Gate
About AED 56k a year for a studio, AED 90k for a 1-bed, AED 140k for a 2-bed and AED 250k for a 3-bed in Hills Estate, a gross yield of about 6.1% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
In Dubai Hills Estate, 20 minutes by car to Downtown Dubai and 30 to Dubai Airport (DXB). Equiti Metro station on the Red Line is 5.9 km away.
More nearby
Off-plan nearby
- Park Gate 2No sales55% built · Planned Q1 2027
- Mallside ResidenceFrom AED 2.4M83% built · Planned Q4 2026
- Parkside HillsFrom AED 1.52M68% built · Planned Q2 2028
- ParklandFrom AED 1.81M50% built · Planned Q4 2028
- Palace Residences Dubai Hills EstateFrom AED 1.82M51% built · Planned Q2 2028
- City View Dubai Hills ResidencesFrom AED 2.29M39% built · Planned Q1 2027
