Rena is an off-plan project by Avenew in Dubai Islands, with 64 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 32% built.
- Built
- 32%
- Handover
- Q2 2027
- Since launch
- Up 16%2 beds price per sq ft
- Homes
- 64
Progress
- Feb–Apr 2025Launch sales · 44
- Q2 2025Building started
- Oct 2026Last inspection · 32%
- Q2 2027Planned handover
Prices
Price per sq ft
Typical price by size
- 2 beds
- AED 5.4M1,551 sq ft · 3 sales
Against 71 Dubai Islands off-plan projects with 10 or more sales
- Lowest848AED/sq ft
- Typical2,299AED/sq ft
- Rena3,277AED/sq ft
- Highest4,153AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 1 sale | ||||
| 16 Oct 2026 | 2 beds | 1,431 | 3,159 | AED 4.52M |
| Jun 2026 · 1 sale | ||||
| 11 Jun 2026 | 2 beds | 1,551 | 3,482 | AED 5.4M |
| Apr 2026 · 1 sale | ||||
| 7 Apr 2026 | 2 beds | 3,967 | 3,277 | AED 13M |
Homes
64 homes by size
- 1 bed19%12 homes · 898–1,179 sq ft · 8 layouts
- 2 beds61%39 homes · 1,394–3,967 sq ft · 16 layouts
- 3 beds20%13 homes · 2,229–3,312 sq ft · 7 layouts
Location
Drive times
Al Mamzar Beach, the nearest beach, is 2.8 km away.
Rated schools
- Al Ittihad Private SchoolAmerican · Good3.2 kmaway
- Sabari Indian SchoolIndian · Good4.0 kmaway
Getting around
- Gold SouqGreen Line5.6 kmaway
- Dubai InternationalDXB8.7 kmaway
- Al JaddafHigh-speed rail · planned11 kmaway
- MeydanEtihad Rail · planned18 kmaway
Developer
- 8 being built, on time
- Escrow bank
- Dubai Islamic Bank
- Legal name
- Avenew Real Estate Development L.L.C
Also being built by Avenew
| Project | Handover | Built |
|---|---|---|
| ShoaqDubai Islands | Q4 2027Being built | 9% |
| AVENEW888 - ModoDubai South | Q1 2028Being built | 21% |
| AVENEW888-LOOMDubai South | Q1 2028Being built | 2% |
| LIADubai Islands | Q2 2028Being built | 4% |
| Silena ResidencesDubai Islands | Q2 2028Being built | 4% |
More questions about Rena
From AED 5.4M for a 1,551 sq ft 2-bed, the lowest typical price paid in the 12 months.
Q2 2027, the planned date in DLD’s register.
It is not past its planned date. It was 32% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.
64 homes on 6 floors: 12 1-bed flats of 898–1,179 sq ft, 39 2-bed flats of 1,394–3,967 sq ft and 13 3-bed flats of 2,229–3,312 sq ft.
Up 16% for 2-bed flats, per sq ft.
About AED 110k a year for a 1-bed and AED 118k for a 2-bed in Dubai Islands, a gross yield of about 3.4% Estimate.
Of Avenew’s 8 projects on DLD’s record, 0 are finished. Of the 8 being built, none is past its planned date.
In Dubai Islands. Gold Souq Metro station on the Green Line is 5.6 km away.
More nearby
Off-plan nearby
- ShoaqNo sales9% built · Planned Q4 2027
- The St. Regis Residences at Dubai Islands.No sales0% built · Planned Q3 2029
- The Meriva CollectionFrom AED 2.92M0% built · Planned Q4 2031
- Bay Villas - Dubai IslandsNo sales23% built · Planned Q2 2027
- Hado by BeyondFrom AED 2.58M0% built · Planned Q2 2029
- Bay EstateNo sales0% built · Planned Q3 2030