The St. Regis Residences at Dubai Islands.
Dubai IslandsAvenew
The St. Regis Residences at Dubai Islands. is an off-plan project by Avenew in Dubai Islands, with 249 homes on 13 floors. DLD’s last inspection, on 12 Nov 2026, found it 0% built.
- Built
- 0%
- Handover
- Q3 2029
- Sales in 12 months
- No sales
- Homes
- 249
Progress
- Q3 2026Building started
- Nov 2026Last inspection · 0%
- Q3 2029Planned handover
Homes
249 homes by size
- 1 bed35%86 homes · 962–1,835 sq ft · 9 layouts
- 2 beds43%108 homes · 1,469–2,120 sq ft · 16 layouts
- 3 beds17%43 homes · 2,005–4,731 sq ft · 13 layouts
- 4 beds4%9 homes · 5,509–9,632 sq ft · 5 layouts
- 5 beds1%3 homes · 14,831–25,302 sq ft · 2 layouts
Location
Drive times
Al Mamzar Beach, the nearest beach, is 2.8 km away.
Rated schools
- Al Ittihad Private SchoolAmerican · Good3.6 kmaway
- ELITE ENGLISH SCHOOLIndian · Acceptable4.4 kmaway
Getting around
- Gold SouqGreen Line5.9 kmaway
- Dubai InternationalDXB9.1 kmaway
- Al JaddafHigh-speed rail · planned11 kmaway
- MeydanEtihad Rail · planned19 kmaway
Developer
- 8 being built, on time
- Escrow bank
- Not on record
- Legal name
- Avenew Real Estate Development L.L.C
Also being built by Avenew
| Project | Handover | Built |
|---|---|---|
| RenaDubai Islands | Q2 2027Being built | 32% |
| ShoaqDubai Islands | Q4 2027Being built | 9% |
| AVENEW888 - ModoDubai South | Q1 2028Being built | 21% |
| AVENEW888-LOOMDubai South | Q1 2028Being built | 2% |
| LIADubai Islands | Q2 2028Being built | 4% |
More questions about The St. Regis Residences at Dubai Islands.
Q3 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 12 Nov 2026, with handover planned in 3 years.
249 homes on 13 floors: 86 1-bed flats of 962–1,835 sq ft, 108 2-bed flats of 1,469–2,120 sq ft, 43 3-bed flats of 2,005–4,731 sq ft, 9 4+ bed flats of 5,509–9,632 sq ft and 3 4+ bed flats of 14,831–25,302 sq ft.
About AED 110k a year for a 1-bed and AED 118k for a 2-bed in Dubai Islands, a gross yield of about 3.4% Estimate.
Of Avenew’s 8 projects on DLD’s record, 0 are finished. Of the 8 being built, none is past its planned date.
In Dubai Islands. Gold Souq Metro station on the Green Line is 5.9 km away.
More nearby
Off-plan nearby
- RenaFrom AED 5.4M32% built · Planned Q2 2027
- ShoaqNo sales9% built · Planned Q4 2027
- The Meriva CollectionFrom AED 2.92M0% built · Planned Q4 2031
- Bay Villas - Dubai IslandsNo sales23% built · Planned Q2 2027
- Hado by BeyondFrom AED 2.58M0% built · Planned Q2 2029
- Bay EstateNo sales0% built · Planned Q3 2030