Rise by Athlon 1
Dubai Land Residence ComplexAldar
Rise by Athlon 1 is an off-plan project by Aldar in Dubai Land Residence Complex, with 650 homes on 27 floors. DLD’s last inspection, on 26 Oct 2026, found it 1% built.
- Built
- 1%
- Handover
- Q4 2029
- Sales in 12 months
- 338
- Homes
- 650
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 1%
- Q4 2029Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.53M904 sq ft · 1,663 AED/sq ft · 215 sales
- 2 beds
- AED 2.44M1,462 sq ft · 1,651 AED/sq ft · 106 sales
- 3 beds
- AED 3.64M2,068 sq ft · 1,710 AED/sq ft · 17 sales
Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales
- Lowest810AED/sq ft
- Typical1,386AED/sq ft
- Rise by Athlon 11,664AED/sq ft
- Highest1,737AED/sq ft
5th highest of 72 · AED per sq ft in 12 months
Latest sales
Plus 2 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 17 Nov 2026 | 1 bed New | 1,001 | 1,627 | AED 1.63M |
| 17 Nov 2026 | 2 beds New | 1,449 | 1,613 | AED 2.34M |
| Sep 2026 · 21 sales | ||||
| 29 Sep 2026 | 1 bed | 1,001 | 1,551 | AED 1.55M |
| 29 Sep 2026 | 2 beds | 1,449 | 1,859 | AED 2.69M |
| 28 Sep 2026 | 1 bed | 904 | 1,679 | AED 1.52M |
| 28 Sep 2026 | 3 beds | 2,068 | 1,710 | AED 3.54M |
| 28 Sep 2026 | 2 beds | 1,462 | 1,571 | AED 2.3M |
| 25 Sep 2026 | 2 beds | 1,449 | 1,802 | AED 2.61M |
| 21 Sep 2026 | 3 beds | 2,057 | 1,686 | AED 3.47M |
| 21 Sep 2026 | 1 bed | 883 | 1,627 | AED 1.44M |
| 21 Sep 2026 | 1 bed | 904 | 1,710 | AED 1.55M |
| 18 Sep 2026 | 2 beds | 1,462 | 1,801 | AED 2.63M |
| 18 Sep 2026 | 2 beds | 1,462 | 1,631 | AED 2.39M |
| 18 Sep 2026 | 1 bed | 899 | 1,815 | AED 1.63M |
| 18 Sep 2026 | 1 bed | 904 | 1,589 | AED 1.44M |
| 18 Sep 2026 | 2 beds | 1,462 | 1,707 | AED 2.49M |
| 18 Sep 2026 | 3 beds | 2,068 | 1,767 | AED 3.65M |
| 18 Sep 2026 | 1 bed | 877 | 1,834 | AED 1.61M |
| 18 Sep 2026 | 1 bed | 883 | 1,697 | AED 1.5M |
| 18 Sep 2026 | 1 bed | 904 | 1,599 | AED 1.45M |
| 18 Sep 2026 | 1 bed | 1,001 | 1,778 | AED 1.78M |
| 16 Sep 2026 | 2 beds | 1,450 | 1,648 | AED 2.39M |
| 16 Sep 2026 | 2 beds | 1,449 | 1,687 | AED 2.44M |
| Aug 2026 · 27 sales | ||||
| 19 Aug 2026 | 2 beds | 1,449 | 1,553 | AED 2.25M |
| 19 Aug 2026 | 3 beds | 2,057 | 1,840 | AED 3.79M |
| 19 Aug 2026 | 1 bed | 904 | 1,638 | AED 1.48M |
| 19 Aug 2026 | 1 bed | 1,000 | 1,560 | AED 1.56M |
| 19 Aug 2026 | 2 beds | 1,785 | 1,409 | AED 2.52M |
| 19 Aug 2026 | 2 beds | 1,653 | 1,480 | AED 2.45M |
| 19 Aug 2026 | 2 beds | 1,462 | 1,590 | AED 2.32M |
| 19 Aug 2026 | 2 beds | 1,440 | 1,866 | AED 2.69M |
| 19 Aug 2026 | 3 beds | 2,718 | 1,341 | AED 3.64M |
| 19 Aug 2026 | 1 bed | 1,001 | 1,605 | AED 1.61M |
| 19 Aug 2026 | 3 beds | 2,142 | 1,625 | AED 3.48M |
| 19 Aug 2026 | 1 bed | 901 | 1,785 | AED 1.61M |
| 19 Aug 2026 | 1 bed | 883 | 1,737 | AED 1.53M |
| 19 Aug 2026 | 1 bed | 1,001 | 1,624 | AED 1.63M |
| 19 Aug 2026 | 1 bed | 1,001 | 1,748 | AED 1.75M |
| 19 Aug 2026 | 1 bed | 904 | 1,720 | AED 1.55M |
| 19 Aug 2026 | 1 bed | 1,069 | 1,465 | AED 1.57M |
| 19 Aug 2026 | 2 beds | 1,513 | 1,640 | AED 2.48M |
| 19 Aug 2026 | 3 beds | 2,068 | 1,844 | AED 3.81M |
| 17 Aug 2026 | 2 beds | 1,462 | 1,631 | AED 2.39M |
| 17 Aug 2026 | 1 bed | 1,000 | 1,519 | AED 1.52M |
| 17 Aug 2026 | 2 beds | 1,462 | 1,502 | AED 2.2M |
| 17 Aug 2026 | 1 bed | 1,000 | 1,569 | AED 1.57M |
| 17 Aug 2026 | 1 bed | 904 | 1,672 | AED 1.51M |
| 17 Aug 2026 | 1 bed | 1,000 | 1,504 | AED 1.5M |
| 17 Aug 2026 | 1 bed | 904 | 1,505 | AED 1.36M |
| 17 Aug 2026 | 1 bed | 1,001 | 1,598 | AED 1.6M |
Homes
650 homes by size
- 1 bed49%317 homes · 883–1,068 sq ft · 6 layouts
- 2 beds42%270 homes · 1,449–1,784 sq ft · 8 layouts
- 3 beds10%63 homes · 2,068–2,718 sq ft · 3 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.44MLocation
Drive times
- Downtown Dubai28min
- Dubai Airport (DXB)29min
- Dubai Marina38min
By car. Jumeirah Public Beach, the nearest beach, is 15.0 km away.
Rated schools
- Ranches Primary SchoolUK · Very good4.6 kmaway
Getting around
- Global VillageGold Line · opens 203217 minwalk
- MeydanEtihad Rail · planned11 kmaway
- EquitiRed Line12 kmaway
- Al JaddafHigh-speed rail · planned19 kmaway
- Dubai InternationalDXB22 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%Developer
- 15 being built, on time
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Aurora Spv 3 L.L.C
Also being built by Aldar
| Project | Handover | Built |
|---|---|---|
| Haven By Aldar 1Dubai Land Residence Complex | Q4 2027Being built | 44% |
| Haven By Aldar 3Dubai Land Residence Complex | Q1 2028Being built | 58% |
| Athlon BY AL Dar 1Dubai Land Residence Complex | Q2 2028Being built | 18% |
| Verdes by Haven 1Dubai Land Residence Complex | Q2 2028Being built | 13% |
| Verdes by Haven 2Dubai Land Residence Complex | Q2 2028Being built | 27% |
More questions about Rise by Athlon 1
From AED 1.53M for a 904 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 2.44M and 3-bed flats sell for about AED 3.64M.
Q4 2029, the planned date in DLD’s register.
It is not past its planned date. It was 1% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
650 homes on 27 floors: 317 1-bed flats of 883–1,068 sq ft, 270 2-bed flats of 1,449–1,784 sq ft and 63 3-bed flats of 2,068–2,718 sq ft.
About AED 56k a year for a 1-bed, AED 73k for a 2-bed and AED 100k for a 3-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.
Of Aldar’s 15 projects on DLD’s record, 0 are finished. Of the 15 being built, none is past its planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.44M.
In Dubai Land Residence Complex, 28 minutes by car to Downtown Dubai and 29 to Dubai Airport (DXB). Equiti Metro station on the Red Line is 12 km away.
More nearby
Off-plan nearby
- Rise by Athlon 4From AED 1.5M1% built · Planned Q4 2029
- Rise by Athlon 2From AED 1.56M0% built · Planned Q1 2030
- Rise by Athlon 3From AED 1.39M0% built · Planned Q1 2030
- Athlon by Al Dar 2From AED 3.16M12% built · Planned Q3 2028
- Athlon by Al Dar 1From AED 3.1M18% built · Planned Q2 2028
- La Tilia at Villanova Phase 2From AED 3.16M11% built · Planned Q3 2028