Sea Mirror Residences
Dubai Water CanalLamar
Sea Mirror Residences is an off-plan project by Lamar on Dubai Water Canal, with 18 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 10% built.
- Built
- 10%
- Handover
- Q4 2027
- Sales in 12 months
- No sales
- Homes
- 18
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 10%
- Q4 2027Planned handover
Homes
18 homes by size
- 2 beds22%4 homes · 4,747 sq ft · 1 layout
- 3 beds39%7 homes · 4,750–9,387 sq ft · 3 layouts
- 4 beds33%6 homes · 11,011–11,188 sq ft · 2 layouts
- 5 beds6%1 home · 22,172 sq ft · 1 layout
Location
Drive times
- Downtown Dubai15min
- Dubai Airport (DXB)28min
- Dubai Marina27min
By car. Jumeirah Open Beach, the nearest beach, is 1.8 km away.
Rated schools
- JSS Private SchoolIndian · Very good1.6 kmaway
- Jumeirah English Speaking SchoolUK · Outstanding1.9 kmaway
Getting around
- Business BayRed Line2.4 kmaway
- City WalkGold Line · opens 20322.8 kmaway
- MeydanEtihad Rail · planned7.9 kmaway
- Al JaddafHigh-speed rail · planned10 kmaway
- Dubai InternationalDXB14 kmaway
Developer
- 2 being built, on time
- Escrow bank
- Arab Bank PLC
- Legal name
- Lamar Development L.L.C
Also being built by Lamar
| Project | Handover | Built |
|---|---|---|
| Bureau LamarBusiness Bay | Q2 2030Being built | 0% |
More questions about Sea Mirror Residences
Q4 2027, the planned date in DLD’s register.
It is not past its planned date. It was 10% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.
18 homes on 6 floors: 4 2-bed flats of 4,747 sq ft, 7 3-bed flats of 4,750–9,387 sq ft, 6 4+ bed flats of 11,011–11,188 sq ft and 1 4+ bed of 22,172 sq ft.
About AED 318k a year for a 2-bed and AED 950k for a 3-bed in Jumeirah 2, a gross yield of about 2.4% Estimate.
Of Lamar’s 2 projects on DLD’s record, 0 are finished. Of the 2 being built, none is past its planned date.
In Dubai Water Canal, Jumeirah 2, 15 minutes by car to Downtown Dubai and 28 to Dubai Airport (DXB). Business Bay Metro station on the Red Line is 2.4 km away.
More nearby
Off-plan nearby
- Peninsula Dubai Residences - Tower 1From AED 14.74M6% built · Planned Q1 2029
- Rosewood Residences DubaiFrom AED 23.06M0% built · Planned Q4 2028
- Peninsula Dubai Residences - Tower 2From AED 22.8M6% built · Planned Q1 2029
- The RingsNo sales35% built · Past planned date
- The MelgranoNo sales43% built · Planned Q4 2026
- Aman Residences DubaiFrom AED 53.71M1% built · Planned Q4 2028
Finished buildings nearby
Typical next door AED 5,098/sq ft · 1 building within a 10-minute walk