Skip to content

The Rings

Dubai Water CanalPMR

The Rings is an off-plan project by PMR on Dubai Water Canal, with 12 homes on 3 floors. DLD’s last inspection, on 26 Oct 2026, found it 35% built.

Built
35%
Handover
Q4 2025
Sales in 12 months
1
Homes
12

Progress

35%built
  1. Q1 2024Building started
  2. Apr–Jun 2024Launch sales · 1
  3. Q4 2025Planned handover · passed
  4. Oct 2026Last inspection · 35%
11 months past the planned date

Prices

Typical price by size

Typical price by size · Nov 2025 – Oct 2026
SizeTypical priceAED/sq ftSales
5 bedsNot enough sales1

Against 4 Jumeirah 2 off-plan projects with 10 or more sales

  • Lowest7,165AED/sq ft
  • The Rings7,639AED/sq ft
  • Typical8,438AED/sq ft
  • Highest13,525AED/sq ft

Latest sales

Newest first
1 off-plan sale · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Jul 2026 · 1 sale
16 Jul 20264+ beds8,5097,639AED 65M

Homes

12 homes by size

  • 5 beds33%4 homes · 8,509–8,623 sq ft · 2 layouts
  • 6 beds50%6 homes · 10,948–13,656 sq ft · 4 layouts
  • 7 beds17%2 homes · 17,143–17,690 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai15min
  • Dubai Airport (DXB)28min
  • Dubai Marina26min

By car. Jumeirah Open Beach, the nearest beach, is 2.0 km away.

Rated schools

  • JSS Private SchoolIndian · Very good1.0 kmaway
  • Jumeirah English Speaking SchoolUK · Outstanding1.4 kmaway

Getting around

  • Business BayRed Line30 minwalk
  • City WalkGold Line · opens 20322.6 kmaway
  • MeydanEtihad Rail · planned7.3 kmaway
  • Al JaddafHigh-speed rail · planned9.9 kmaway
  • Dubai InternationalDXB14 kmaway
Area guideJumeirah 2Finished homesAED 5,178/sq ft1-bed rentAED 95k/yrGross yieldEstimate2.4%

Developer

PMR

  • 1 past their planned date
Escrow bank
Commercial Bank of Dubai
Legal name
P M R Development L.L.C
Questions

More questions about The Rings

Q4 2025, the planned date in DLD’s register.

No. It is 11 months past its planned date, and was 35% built at DLD’s last inspection on 26 Oct 2026.

12 homes on 3 floors: 4 4+ bed flats of 8,509–8,623 sq ft, 6 4+ bed flats of 10,948–13,656 sq ft and 2 4+ bed flats of 17,143–17,690 sq ft.

Of PMR’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.

In Dubai Water Canal, Jumeirah 2, 15 minutes by car to Downtown Dubai and 28 to Dubai Airport (DXB). Business Bay Metro station on the Red Line is a 30-minute walk.

More nearby

How the numbers work