The Rings
Dubai Water CanalPMR
The Rings is an off-plan project by PMR on Dubai Water Canal, with 12 homes on 3 floors. DLD’s last inspection, on 26 Oct 2026, found it 35% built.
- Built
- 35%
- Handover
- Q4 2025
- Sales in 12 months
- 1
- Homes
- 12
Progress
- Q1 2024Building started
- Apr–Jun 2024Launch sales · 1
- Q4 2025Planned handover · passed
- Oct 2026Last inspection · 35%
Prices
Typical price by size
| Size | Typical price | AED/sq ft | Sales |
|---|---|---|---|
| 5 beds | Not enough sales | 1 |
Against 4 Jumeirah 2 off-plan projects with 10 or more sales
- Lowest7,165AED/sq ft
- The Rings7,639AED/sq ft
- Typical8,438AED/sq ft
- Highest13,525AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Jul 2026 · 1 sale | ||||
| 16 Jul 2026 | 4+ beds | 8,509 | 7,639 | AED 65M |
Homes
12 homes by size
- 5 beds33%4 homes · 8,509–8,623 sq ft · 2 layouts
- 6 beds50%6 homes · 10,948–13,656 sq ft · 4 layouts
- 7 beds17%2 homes · 17,143–17,690 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai15min
- Dubai Airport (DXB)28min
- Dubai Marina26min
By car. Jumeirah Open Beach, the nearest beach, is 2.0 km away.
Rated schools
- JSS Private SchoolIndian · Very good1.0 kmaway
- Jumeirah English Speaking SchoolUK · Outstanding1.4 kmaway
Getting around
- Business BayRed Line30 minwalk
- City WalkGold Line · opens 20322.6 kmaway
- MeydanEtihad Rail · planned7.3 kmaway
- Al JaddafHigh-speed rail · planned9.9 kmaway
- Dubai InternationalDXB14 kmaway
Developer
PMR
- 1 past their planned date
- Escrow bank
- Commercial Bank of Dubai
- Legal name
- P M R Development L.L.C
More questions about The Rings
Q4 2025, the planned date in DLD’s register.
No. It is 11 months past its planned date, and was 35% built at DLD’s last inspection on 26 Oct 2026.
12 homes on 3 floors: 4 4+ bed flats of 8,509–8,623 sq ft, 6 4+ bed flats of 10,948–13,656 sq ft and 2 4+ bed flats of 17,143–17,690 sq ft.
Of PMR’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.
In Dubai Water Canal, Jumeirah 2, 15 minutes by car to Downtown Dubai and 28 to Dubai Airport (DXB). Business Bay Metro station on the Red Line is a 30-minute walk.
More nearby
Off-plan nearby
- The MelgranoNo sales43% built · Planned Q4 2026
- Sea Mirror ResidencesNo sales10% built · Planned Q4 2027
- Peninsula Dubai Residences - Tower 1From AED 14.74M6% built · Planned Q1 2029
- Rosewood Residences DubaiFrom AED 23.06M0% built · Planned Q4 2028
- Peninsula Dubai Residences - Tower 2From AED 22.8M6% built · Planned Q1 2029
- Aman Residences DubaiFrom AED 53.71M1% built · Planned Q4 2028
Finished buildings nearby
Typical next door AED 3,031/sq ft · 3 buildings within a 10-minute walk
