Shahrukhz by Danube
Sufouh GardensDanube
Shahrukhz by Danube is an off-plan project by Danube in Sufouh Gardens, with 917 homes on 42 floors. DLD’s last inspection, on 26 Oct 2026, found it 2% built.
- Built
- 2%
- Handover
- Q2 2029
- Sales in 12 months
- No sales
- Homes
- 917
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 2%
- Q2 2029Planned handover
Location
Drive times
- Downtown Dubai20min
- Dubai Airport (DXB)33min
- Dubai Marina17min
By car. Jumeirah Public Beach, the nearest beach, is 4.7 km away.
Rated schools
- GEMS Wellington International School - DubaiUK · Outstanding0.6 kmaway
- American School DubaiAmerican · Good1.0 kmaway
Getting around
- Dubai Internet CityRed Line14 minwalk
- Al SufouhDubai Tram23 minwalk
- Al YalayisEtihad Rail10 kmaway
- Al JaddafHigh-speed rail · planned20 kmaway
- Al Maktoum InternationalDWC24 kmaway
Area guideSufouh GardensFinished homesAED 1,643/sq ft1-bed rentAED 98k/yrGross yieldEstimate6.2%Developer
- 19 finished
- 18 being built, on time
- 4 past their planned date
- Escrow bank
- Not on record
- Legal name
- Danube Properties Development L.L.C
Also being built by Danube
| Project | Handover | Built |
|---|---|---|
| Elitz By DanubeJVC | Q4 2025Past planned date | 92% |
| Sportz By DanubeDubai Sports City | Q1 2026Past planned date | 80% |
| Viewz 1 By DanubeJLT | Q2 2026Past planned date | 66% |
| Viewz 2 By DanubeJLT | Q2 2026Past planned date | 65% |
| Oasiz 1 by DanubeSilicon Oasis | Q4 2027Being built | 30% |
More questions about Shahrukhz by Danube
Q2 2029, the planned date in DLD’s register.
It is not past its planned date. It was 2% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
About AED 55k a year for a studio, AED 98k for a 1-bed, AED 110k for a 2-bed and AED 220k for a 3-bed in Sufouh Gardens, a gross yield of about 6.2% Estimate.
Of Danube’s 41 projects on DLD’s record, 19 are finished. Of the 22 being built, 4 are past their planned date.
In Sufouh Gardens, 20 minutes by car to Downtown Dubai and 33 to Dubai Airport (DXB). Dubai Internet City Metro station on the Red Line is a 14-minute walk.
More nearby
Off-plan nearby
Finished buildings nearby
Typical next door AED 1,599/sq ft · 3 buildings within a 10-minute walk
