Skip to content

The Community Motor City

Motor CityAqua Properties

FromAED 620kStudio · 433 sq ft

The Community Motor City is an off-plan project by Aqua Properties in Motor City, with 414 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 95% built.

Built
95%
Handover
Q4 2025
Since launch
Up 29%Studio price per sq ft
Homes
414

About

The Community is a 6-floor building of 414 homes in Motor City, planned for co-living with spaces to work from home. Most homes are studios and 1-bed flats, with a few 2-bed and 3-bed flats, and buyers can choose to have them furnished. Residents share a skate park, open-air chess and a golf simulator, with a café and shops on site.

  • Co-living and co-working spaces
  • Skate park and golf simulator
  • Furnishing on offer

Shared facilities

  • Infinity pool
  • Gym
  • Jogging track
  • Skate park
  • Open-air chess
  • Badminton court
  • Padel court
  • Golf simulator

Progress

95%built
  1. Q4 2022Building started
  2. Mar–May 2023Launch sales · 101
  3. Q4 2025Planned handover · passed
  4. Oct 2026Last inspection · 95%
11 months past the planned date

Prices

Price per sq ft

1,363 AED/sq ft37 sales in 12 months

Typical price by size

Studio
AED 620k433 sq ft · 1,432 AED/sq ft · 21 sales
1 bed
AED 892k675 sq ft · 1,305 AED/sq ft · 14 sales
2 beds
Not enough sales1 sale
3 beds
Not enough sales1 sale

Against 10 Motor City off-plan projects with 10 or more sales

  • Lowest1,322AED/sq ft
  • The Community Motor City1,363AED/sq ft
  • Typical1,823AED/sq ft
  • Highest2,044AED/sq ft

2nd lowest of 10 · AED per sq ft in 12 months

Latest sales

Plus 2 newer sales, newest first
37 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
10 Nov 2026Studio New4261,232AED 525k
9 Nov 2026Studio New4181,794AED 750k
Oct 2026 · 2 sales
21 Oct 2026Studio4331,259AED 545k
15 Oct 2026Studio4191,372AED 575k
Sep 2026 · 1 sale
14 Sep 20261 bed6711,304AED 875k
Aug 2026 · 1 sale
31 Aug 20261 bed6071,532AED 930k
Jun 2026 · 3 sales
29 Jun 2026Studio4331,432AED 620k
22 Jun 2026Studio5591,478AED 826k
16 Jun 20261 bed6771,307AED 885k
May 2026 · 3 sales
20 May 20263 beds1,8251,167AED 2.13M
11 May 20261 bed7971,173AED 935k
4 May 20261 bed1,003977AED 980k
Apr 2026 · 3 sales
27 Apr 20261 bed6811,321AED 900k
22 Apr 2026Studio565991AED 560k
9 Apr 2026Studio4181,794AED 750k
Mar 2026 · 1 sale
2 Mar 20261 bed7681,107AED 850k
Feb 2026 · 8 sales
26 Feb 20262 beds1,2021,193AED 1.43M
20 Feb 2026Studio4331,386AED 600k
19 Feb 2026Studio4331,386AED 600k
17 Feb 2026Studio4331,359AED 588k
16 Feb 20261 bed6771,462AED 990k
12 Feb 2026Studio4331,501AED 650k
10 Feb 2026Studio4181,483AED 620k
5 Feb 2026Studio4331,356AED 587k
Jan 2026 · 4 sales
26 Jan 20261 bed6601,363AED 900k
23 Jan 2026Studio4331,508AED 653k
20 Jan 2026Studio523967AED 506k
8 Jan 2026Studio4191,635AED 685k
Dec 2025 · 7 sales
30 Dec 2025Studio4171,799AED 750k
29 Dec 2025Studio4331,305AED 565k
15 Dec 2025Studio4331,539AED 667k
15 Dec 2025Studio4331,744AED 755k
12 Dec 20251 bed6271,404AED 880k
10 Dec 20251 bed6771,418AED 960k
1 Dec 2025Studio4331,180AED 511k
Nov 2025 · 4 sales
26 Nov 2025Studio4181,537AED 643k
17 Nov 20251 bed6721,242AED 835k
17 Nov 20251 bed6711,244AED 835k
17 Nov 20251 bed6721,205AED 810k

Homes

414 homes by size

  • Studio47%196 homes · 419–928 sq ft · 10 layouts
  • 1 bed39%160 homes · 607–1,003 sq ft · 15 layouts
  • 2 beds8%32 homes · 1,098–2,342 sq ft · 9 layouts
  • 3 beds6%26 homes · 1,731–3,257 sq ft · 10 layouts

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)33min
  • Dubai Marina24min

By car. JBR Beach, the nearest beach, is 11.2 km away.

Rated schools

  • Dwight SchoolInternational Baccalaureate · Good1.4 kmaway
  • Victory Heights Primary SchoolUK · Outstanding1.9 kmaway

Getting around

  • Dubai Miracle GardenGold Line · opens 203228 minwalk
  • Al YalayisEtihad Rail7.6 kmaway
  • Jumeirah Golf EstatesRed Line8.0 kmaway
  • Al Maktoum AirportHigh-speed rail · planned18 kmaway
  • Al Maktoum InternationalDWC18 kmaway
Area guideMotor CityFinished homesAED 1,000/sq ft1-bed rentAED 73k/yrGross yieldEstimate7.6%

Developer

  • 4 finished
  • 2 being built, on time
  • 1 past their planned date
  • 1 not started
Escrow bank
Mashreq Bank
Legal name
Aqua Properties FZ -LLC

More by Aqua Properties

Aqua Properties’ other projects
ProjectHandoverBuilt
The Community - Sports ArenaDubai Sports CityQ4 2027Being built22%
The central downtownArjanQ1 2028Being built10%
Misk HotelPalm JumeirahNot on recordNot started80%
The CommunityJumeirah Village TriangleQ3 2024Finished
O10Sama Al JadafQ4 2022Finished
All 8 Aqua Properties projects
Questions

More questions about The Community Motor City

From AED 620k for a 433 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 892k.

Q4 2025, the planned date in DLD’s register.

No. It is 11 months past its planned date, and was 95% built at DLD’s last inspection on 26 Oct 2026.

414 homes on 6 floors: 196 studios of 419–928 sq ft, 160 1-bed flats of 607–1,003 sq ft, 32 2-bed flats of 1,098–2,342 sq ft and 26 3-bed flats of 1,731–3,257 sq ft.

Up 20% for 1-bed flats, per sq ft. Against the launch sales of Mar 2023 – May 2023: studios up 29%.

About AED 52k a year for a studio, AED 73k for a 1-bed, AED 118k for a 2-bed and AED 165k for a 3-bed in Motor City, a gross yield of about 7.6% Estimate.

Of Aqua Properties’ 8 projects on DLD’s record, 4 are finished. Of the 3 being built, 1 is past its planned date.

In Motor City, 26 minutes by car to Downtown Dubai and 33 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 8.0 km away.

More nearby

How the numbers work

FromAED 620kSee it on the map