Treppan Tower
Jumeirah Village TriangleFakhruddin
Treppan Tower is an off-plan project by Fakhruddin in Jumeirah Village Triangle, with 261 homes on 25 floors. DLD’s last inspection, on 26 Oct 2026, found it 12% built.
- Built
- 12%
- Handover
- Q2 2027
- Sales in 12 months
- 95
- Homes
- 261
About
Tréppan Tower is a 25-floor building of 261 homes in Jumeirah Village Triangle, with whole floors given over to shared spaces. Four in five homes are 1-bed flats, with 2-bed flats and a few 3-bed sky villas, all sold fully furnished with filtered water and air. Residents share an infinity pool, an outdoor theatre and a greenhouse café.
- Sold fully furnished
- 3-bed sky villas
- Greenhouse café and outdoor theatre
Shared facilities
- Infinity pool
- Kids’ pool
- Gym
- Outdoor calisthenics
- Yoga deck
- Greenhouse café
- Outdoor theatre
- Library
Progress
- Q1 2025Building started
- Feb–Apr 2025Launch sales · 0
- Oct 2026Last inspection · 12%
- Q2 2027Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.15M640 sq ft · 1,789 AED/sq ft · 3 sales
- 2 beds
- Not enough sales2 sales
Against 26 Jumeirah Village Triangle off-plan projects with 10 or more sales
- Lowest1,251AED/sq ft
- Typical1,604AED/sq ft
- Treppan Tower1,760AED/sq ft
- Highest1,950AED/sq ft
5th highest of 26 · AED per sq ft in 12 months
Latest sales
Plus 3 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 12 Nov 2026 | 1 bed New | 625 | 2,110 | AED 1.32M |
| 12 Nov 2026 | 2 beds New | 1,024 | 1,758 | AED 1.8M |
| 9 Nov 2026 | 1 bed New | 476 | 1,975 | AED 940k |
| Oct 2026 · 4 sales | ||||
| 20 Oct 2026 | 1 bed | 643 | 1,890 | AED 1.22M |
| 7 Oct 2026 | 2 beds | 1,024 | 1,582 | AED 1.62M |
| 7 Oct 2026 | 1 bed | 640 | 1,789 | AED 1.15M |
| 7 Oct 2026 | 2 beds | 1,024 | 1,693 | AED 1.73M |
| Sep 2026 · 1 sale | ||||
| 23 Sep 2026 | 1 bed | 621 | 1,691 | AED 1.05M |
| Aug 2026 · 3 sales | ||||
| 27 Aug 2026 | 1 bed | 647 | 1,629 | AED 1.05M |
| 20 Aug 2026 | 1 bed | 628 | 1,720 | AED 1.08M |
| 19 Aug 2026 | 1 bed | 630 | 1,792 | AED 1.13M |
| Jul 2026 · 3 sales | ||||
| 21 Jul 2026 | 1 bed | 479 | 2,329 | AED 1.12M |
| 3 Jul 2026 | 1 bed | 480 | 1,966 | AED 943k |
| 2 Jul 2026 | 1 bed | 479 | 1,958 | AED 938k |
| Jun 2026 · 6 sales | ||||
| 26 Jun 2026 | 1 bed | 647 | 1,777 | AED 1.15M |
| 26 Jun 2026 | 1 bed | 630 | 1,632 | AED 1.03M |
| 26 Jun 2026 | 1 bed | 630 | 1,602 | AED 1.01M |
| 4 Jun 2026 | 1 bed | 643 | 1,692 | AED 1.09M |
| 4 Jun 2026 | 1 bed | 643 | 1,933 | AED 1.24M |
| 3 Jun 2026 | 1 bed | 480 | 1,958 | AED 940k |
| May 2026 · 1 sale | ||||
| 12 May 2026 | 1 bed | 645 | 1,752 | AED 1.13M |
| Apr 2026 · 9 sales | ||||
| 27 Apr 2026 | 1 bed | 647 | 1,700 | AED 1.1M |
| 27 Apr 2026 | 2 beds | 1,031 | 1,443 | AED 1.49M |
| 27 Apr 2026 | 1 bed | 647 | 1,690 | AED 1.09M |
| 22 Apr 2026 | 2 beds | 1,028 | 1,542 | AED 1.59M |
| 8 Apr 2026 | 1 bed | 647 | 1,696 | AED 1.1M |
| 8 Apr 2026 | 1 bed | 645 | 1,800 | AED 1.16M |
| 8 Apr 2026 | 2 beds | 1,028 | 1,525 | AED 1.57M |
| 7 Apr 2026 | 1 bed | 643 | 1,813 | AED 1.17M |
| 7 Apr 2026 | 1 bed | 647 | 1,855 | AED 1.2M |
| Mar 2026 · 2 sales | ||||
| 2 Mar 2026 | 1 bed | 647 | 1,712 | AED 1.11M |
| 2 Mar 2026 | 1 bed | 480 | 2,292 | AED 1.1M |
| Feb 2026 · 4 sales | ||||
| 23 Feb 2026 | 2 beds | 1,031 | 1,484 | AED 1.53M |
| 4 Feb 2026 | 1 bed | 631 | 1,759 | AED 1.11M |
| 3 Feb 2026 | 1 bed | 1,017 | 1,131 | AED 1.15M |
| 3 Feb 2026 | 1 bed | 647 | 1,921 | AED 1.24M |
| Jan 2026 · 7 sales | ||||
| 30 Jan 2026 | 1 bed | 628 | 1,752 | AED 1.1M |
| 29 Jan 2026 | 1 bed | 631 | 1,776 | AED 1.12M |
| 20 Jan 2026 | 2 beds | 1,028 | 1,813 | AED 1.86M |
| 14 Jan 2026 | 1 bed | 630 | 1,794 | AED 1.13M |
| 13 Jan 2026 | 2 beds | 1,028 | 1,641 | AED 1.69M |
| 8 Jan 2026 | 3 beds | 2,641 | 1,484 | AED 3.92M |
| 5 Jan 2026 | 1 bed | 480 | 2,292 | AED 1.1M |
| Dec 2025 · 28 sales | ||||
| 29 Dec 2025 | 1 bed | 647 | 1,863 | AED 1.21M |
| 29 Dec 2025 | 1 bed | 643 | 1,859 | AED 1.2M |
| 29 Dec 2025 | 1 bed | 647 | 1,734 | AED 1.12M |
| 29 Dec 2025 | 2 beds | 1,028 | 1,620 | AED 1.67M |
| 29 Dec 2025 | 1 bed | 647 | 1,855 | AED 1.2M |
| 29 Dec 2025 | 1 bed | 628 | 1,732 | AED 1.09M |
| 29 Dec 2025 | 1 bed | 647 | 1,824 | AED 1.18M |
Homes
261 homes by size
- 1 bed81%211 homes · 476–1,164 sq ft · 10 layouts
- 2 beds18%46 homes · 1,024–1,569 sq ft · 2 layouts
- 3 beds2%4 homes · 2,621–2,879 sq ft · 2 layouts
Payment plan
Fakhruddin’s project page30 / 70
Payments go to the project’s escrow account at Emirates NBD Bank.
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)35min
- Dubai Marina18min
By car. JBR Beach, the nearest beach, is 6.7 km away.
Rated schools
- EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good3.9 kmaway
- The Arbor SchoolUK · Good3.9 kmaway
Getting around
- Dubai Production CityGold Line · opens 203229 minwalk
- Al YalayisEtihad Rail31 minwalk
- Jumeirah Golf EstatesRed Line2.0 kmaway
- Al Maktoum AirportHigh-speed rail · planned15 kmaway
- Al Maktoum InternationalDWC15 kmaway
Area guideJumeirah Village TriangleFinished homesAED 1,337/sq ft1-bed rentAED 72k/yrGross yieldEstimate7.5%Developer
- 3 being built, on time
- 2 past their planned date
- Escrow bank
- Emirates NBD Bank
- Legal name
- Fakhruddin Properties Development L.L.C
Also being built by Fakhruddin
| Project | Handover | Built |
|---|---|---|
| Maimoon GardensJVC | Q4 2025Past planned date | 78% |
| Hatimi Residences BY FakhruddinDubai Islands | Q4 2026Past planned date | 63% |
| Treppan Serenique ResidencesDubai Islands | Q4 2027Being built | 5% |
| Treppan Living PriveDubai Islands | Q4 2028Being built | 0% |
More questions about Treppan Tower
From AED 1.15M for a 640 sq ft 1-bed, the lowest typical price paid in the 12 months.
Q2 2027, the planned date in DLD’s register.
It is not past its planned date. It was 12% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.
261 homes on 25 floors: 211 1-bed flats of 476–1,164 sq ft, 46 2-bed flats of 1,024–1,569 sq ft and 4 3-bed flats of 2,621–2,879 sq ft.
About AED 72k a year for a 1-bed, AED 95k for a 2-bed and AED 164k for a 3-bed in Jumeirah Village Triangle, a gross yield of about 7.5% Estimate.
Of Fakhruddin’s 5 projects on DLD’s record, 0 are finished. Of the 5 being built, 2 are past their planned date.
In Jumeirah Village Triangle, 27 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 2.0 km away.
More nearby
Off-plan nearby
- Silver StallionsNo sales12% built · Past planned date
- Guzel TowersFrom AED 633k7% built · Planned Q4 2027
- Sol LevanteFrom AED 822k7% built · Planned Q3 2028
- Elaris AxisFrom AED 1.21M4% built · Planned Q4 2028
- Vivid TowerFrom AED 712k12% built · Planned Q4 2026
- Best Town VillasNo sales76% built · Past planned date
Finished buildings nearby
Typical next door AED 1,145/sq ft · 5 buildings within a 10-minute walk
- Park One1,121AED/sq ft1-bed rent AED 68k/yr · 10-minute walk
- 555 Park Views1,330AED/sq ft1-bed rent AED 88k/yr · 10-minute walk
- La Residence1,091AED/sq ftNot enough rents · 10-minute walk
- Maya Residences 51,388AED/sq ft1-bed rent AED 76k/yr · 10-minute walk
- Al Jawhara Tower1,145AED/sq ftNot enough rents · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr
- Imperial Residence1,005AED/sq ft1-bed rent AED 60k/yr
- Milestone Residences1,446AED/sq ft1-bed rent AED 87k/yr
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr
