Villea East is an off-plan project by Palmridge in Al Satwa, with 113 homes on 8 floors. DLD’s last inspection, on 20 Feb 2026, found it 0% built.
- Built
- 0%
- Handover
- Q3 2028
- Sales in 12 months
- No sales
- Homes
- 113
Progress
- Feb 2026Last inspection · 0%
- Q2 2026Building started
- Q3 2028Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
113 homes by size
- 1 bed55%62 homes · 888–963 sq ft · 6 layouts
- 2 beds42%47 homes · 1,179–2,178 sq ft · 10 layouts
- 3 beds2%2 homes · 2,012–2,709 sq ft · 2 layouts
- 4 beds2%2 homes · 3,697–4,358 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai15min
- Dubai Airport (DXB)24min
- Dubai Marina27min
By car. La Mer Beach, the nearest beach, is 2.2 km away.
Rated schools
- New Academy SchoolAmerican · Good3.4 kmaway
- JSS Private SchoolIndian · Very good4.0 kmaway
Getting around
- Emirates TowersRed Line8 minwalk
- Al Satwa RoadGold Line · opens 203211 minwalk
- Al JaddafHigh-speed rail · planned5.8 kmaway
- MeydanEtihad Rail · planned7.5 kmaway
- Dubai InternationalDXB9.5 kmaway
Area guideAl SatwaFinished homesAED 1,738/sq ft1-bed rentAED 73k/yrGross yieldEstimate5.5%Developer
- 1 being built, on time
- 1 not started
- Escrow bank
- Not on record
- Legal name
- Palmridge Real Estate Development L.L.C
Also being built by Palmridge
| Project | Handover | Built |
|---|---|---|
| Villea WestAl Satwa | Q4 2027Being built | 0% |
More questions about Villea East
Q3 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 20 Feb 2026, with handover planned in 22 months.
113 homes on 8 floors: 62 1-bed flats of 888–963 sq ft, 47 2-bed flats of 1,179–2,178 sq ft, 2 3-bed flats of 2,012–2,709 sq ft and 2 4+ bed flats of 3,697–4,358 sq ft.
About AED 73k a year for a 1-bed, AED 95k for a 2-bed and AED 272k for a 3-bed in Al Satwa, a gross yield of about 5.5% Estimate.
Of Palmridge’s 2 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.
In Al Satwa, 15 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Emirates Towers Metro station on the Red Line is a 8-minute walk.
More nearby
Off-plan nearby
- Villea WestFrom AED 1.2M0% built · Planned Q4 2027
- Stamn OneFrom AED 1.05M42% built · Planned Q4 2026
- Prestige Gardens by Prestige OneNo sales0% built · Planned Q3 2028
- Onaya Residences by KayaNo sales38% built · Past planned date
- Whitestone ResidenceFrom AED 1.4M3% built · Planned Q4 2026
- Elemental 22No sales26% built · Planned Q2 2028
Finished buildings nearby
Typical next door AED 2,289/sq ft · 3 buildings within a 10-minute walk