Zeta is an off-plan project by Acube in Liwan, with 147 homes on 13 floors. DLD’s last inspection, on 6 Jul 2026, found it 0% built.

Built
0%
Handover
Q3 2031
Sales in 12 months
No sales
Homes
147

Progress

0%built
  1. Jul 2026Last inspection · 0%
  2. Q3 2026Building started
  3. Q3 2031Planned handover

DLD updates % built after each inspection, so work on site can be further along than this figure.

Homes

147 homes by size

  • Studio9%13 homes · 349–378 sq ft · 2 layouts
  • 1 bed50%73 homes · 703–913 sq ft · 10 layouts
  • 2 beds27%39 homes · 1,163–1,260 sq ft · 4 layouts
  • 3 beds15%22 homes · 1,516–1,536 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)26min
  • Dubai Marina35min

By car. Jumeirah Open Beach, the nearest beach, is 16.5 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good2.1 kmaway
  • Repton SchoolUK/IB (Y 13) · Outstanding3.8 kmaway

Getting around

  • Dubai Silicon OasisBlue Line · opens 20292.3 kmaway
  • MeydanEtihad Rail · planned8.1 kmaway
  • CreekGreen Line12 kmaway
  • Al JaddafHigh-speed rail · planned13 kmaway
  • Dubai InternationalDXB15 kmaway
Area guideLiwanFinished homesAED 851/sq ft1-bed rentAED 55k/yrGross yieldEstimate8.8%

Developer

  • 1 finished
  • 4 being built, on time
Escrow bank
Not on record
Legal name
Acube Zeta Real Estate Development L.L.C

More by Acube

Acube’s other projects
ProjectHandoverBuilt
VegaDubai Sports CityQ2 2027Being built20%
Altair 52Dubai SouthQ4 2027Being built10%
ElectraJVCNot on recordBeing built9%
Adhara StarArjanQ1 2025Finished
All 5 Acube projects
Questions

More questions about Zeta

Q3 2031, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 6 Jul 2026, with handover planned in 5 years.

147 homes on 13 floors: 13 studios of 349–378 sq ft, 73 1-bed flats of 703–913 sq ft, 39 2-bed flats of 1,163–1,260 sq ft and 22 3-bed flats of 1,516–1,536 sq ft.

About AED 42k a year for a studio, AED 55k for a 1-bed, AED 78k for a 2-bed and AED 93k for a 3-bed in Liwan, a gross yield of about 8.8% Estimate.

Of Acube’s 5 projects on DLD’s record, 1 are finished. Of the 4 being built, none is past its planned date.

In Liwan, 27 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Creek Metro station on the Green Line is 12 km away.