Al Ezz Tower by Abu Alnaga
Dubai Production CityAbu Alnaga
Al Ezz Tower by Abu Alnaga is an off-plan project by Abu Alnaga in Dubai Production City, with 201 homes on 16 floors. DLD’s last inspection, on 28 Oct 2026, found it 3% built.
- Built
- 3%
- Handover
- Q4 2029
- Sales in 12 months
- No sales
- Homes
- 201
Progress
- Q3 2026Building started
- Oct 2026Last inspection · 3%
- Q4 2029Planned handover
Homes
201 homes by size
- Studio16%33 homes · 452–771 sq ft · 7 layouts
- 1 bed41%83 homes · 885–2,221 sq ft · 14 layouts
- 2 beds29%59 homes · 1,269–3,175 sq ft · 22 layouts
- 3 beds12%25 homes · 2,325–6,571 sq ft · 11 layouts
- 4 beds1 home · 7,483 sq ft · 1 layout
Location
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)36min
- Dubai Marina19min
By car. JBR Beach, the nearest beach, is 7.4 km away.
Rated schools
- Victory Heights Primary SchoolUK · Outstanding3.4 kmaway
- Dwight SchoolInternational Baccalaureate · Good4.0 kmaway
Getting around
- Dubai Production CityGold Line · opens 203213 minwalk
- Al YalayisEtihad Rail3.2 kmaway
- Jumeirah Golf EstatesRed Line3.5 kmaway
- Al Maktoum AirportHigh-speed rail · planned16 kmaway
- Al Maktoum InternationalDWC16 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%Developer
- 3 not started
- Escrow bank
- Not on record
- Legal name
- Abualnaga Development L.L.C
More by Abu Alnaga
| Project | Handover | Built |
|---|---|---|
| ABU ALNAGA TOWERSama Al Jadaf | Q4 2028Not started | Not on record |
| VALERIA BY ABU ALNAGASama Al Jadaf | Q4 2029Not started | Not on record |
More questions about Al Ezz Tower by Abu Alnaga
Q4 2029, the planned date in DLD’s register.
It is not past its planned date. It was 3% built at DLD’s last inspection on 28 Oct 2026, with handover planned in 3 years.
201 homes on 16 floors: 33 studios of 452–771 sq ft, 83 1-bed flats of 885–2,221 sq ft, 59 2-bed flats of 1,269–3,175 sq ft, 25 3-bed flats of 2,325–6,571 sq ft and 1 4+ bed of 7,483 sq ft.
About AED 40k a year for a studio, AED 63k for a 1-bed, AED 90k for a 2-bed and AED 110k for a 3-bed in Dubai Production City, a gross yield of about 8.6% Estimate.
Of Abu Alnaga’s 3 projects on DLD’s record, 0 are finished.
In Dubai Production City, 26 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.5 km away.
More nearby
Off-plan nearby
- Vista by VisionFrom AED 655k12% built · Planned Q3 2027
- Samana Sky ViewsFrom AED 753k2% built · Planned Q3 2028
- Binghatti EliteFrom AED 580k53% built · Past planned date
- Samana Lake Views 2From AED 712k9% built · Handover not on record
- Samana ResortsFrom AED 751k6% built · Planned Q2 2028
- Samana PortofinoFrom AED 727k60% built · Handover not on record
Finished buildings nearby
Typical next door AED 1,341/sq ft · 7 buildings within a 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr · 10-minute walk
- Bali Residences1,341AED/sq ft1-bed rent AED 77k/yr · 10-minute walk
- Green Park940AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Oakwood Residency789AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Centrium Tower854AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Milestone Residences1,446AED/sq ft1-bed rent AED 87k/yr · 10-minute walk
- Forum Heights1,452AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Lakeside1,043AED/sq ft1-bed rent AED 51k/yr
- Qasr Sabah I, II, III743AED/sq ft1-bed rent AED 45k/yr
- The Crescent832AED/sq ft1-bed rent AED 62k/yr
- Lago Vista827AED/sq ft1-bed rent AED 55k/yr