Skip to content

Al Ezz Tower by Abu Alnaga

Dubai Production CityAbu Alnaga

Al Ezz Tower by Abu Alnaga is an off-plan project by Abu Alnaga in Dubai Production City, with 201 homes on 16 floors. DLD’s last inspection, on 28 Oct 2026, found it 3% built.

Built
3%
Handover
Q4 2029
Sales in 12 months
No sales
Homes
201

Progress

3%built
  1. Q3 2026Building started
  2. Oct 2026Last inspection · 3%
  3. Q4 2029Planned handover

Homes

201 homes by size

  • Studio16%33 homes · 452–771 sq ft · 7 layouts
  • 1 bed41%83 homes · 885–2,221 sq ft · 14 layouts
  • 2 beds29%59 homes · 1,269–3,175 sq ft · 22 layouts
  • 3 beds12%25 homes · 2,325–6,571 sq ft · 11 layouts
  • 4 beds1 home · 7,483 sq ft · 1 layout

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)36min
  • Dubai Marina19min

By car. JBR Beach, the nearest beach, is 7.4 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding3.4 kmaway
  • Dwight SchoolInternational Baccalaureate · Good4.0 kmaway

Getting around

  • Dubai Production CityGold Line · opens 203213 minwalk
  • Al YalayisEtihad Rail3.2 kmaway
  • Jumeirah Golf EstatesRed Line3.5 kmaway
  • Al Maktoum AirportHigh-speed rail · planned16 kmaway
  • Al Maktoum InternationalDWC16 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%

Developer

  • 3 not started
Escrow bank
Not on record
Legal name
Abualnaga Development L.L.C

More by Abu Alnaga

Abu Alnaga’s other projects
ProjectHandoverBuilt
ABU ALNAGA TOWERSama Al JadafQ4 2028Not startedNot on record
VALERIA BY ABU ALNAGASama Al JadafQ4 2029Not startedNot on record
All 3 Abu Alnaga projects
Questions

More questions about Al Ezz Tower by Abu Alnaga

Q4 2029, the planned date in DLD’s register.

It is not past its planned date. It was 3% built at DLD’s last inspection on 28 Oct 2026, with handover planned in 3 years.

201 homes on 16 floors: 33 studios of 452–771 sq ft, 83 1-bed flats of 885–2,221 sq ft, 59 2-bed flats of 1,269–3,175 sq ft, 25 3-bed flats of 2,325–6,571 sq ft and 1 4+ bed of 7,483 sq ft.

About AED 40k a year for a studio, AED 63k for a 1-bed, AED 90k for a 2-bed and AED 110k for a 3-bed in Dubai Production City, a gross yield of about 8.6% Estimate.

Of Abu Alnaga’s 3 projects on DLD’s record, 0 are finished.

In Dubai Production City, 26 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.5 km away.

More nearby

How the numbers work