Samana Resorts
Dubai Production CitySamana
Samana Resorts is an off-plan project by Samana in Dubai Production City, with 969 homes on 19 floors. DLD’s last inspection, on 26 Oct 2026, found it 6% built.
- Built
- 6%
- Handover
- Q2 2028
- Since launch
- Up 4%Studio price per sq ft
- Homes
- 969
About
Samana Resorts is a 19-floor building of 969 homes in Dubai Production City, close to City Centre Me’aisem. Just over half the homes are studios, with 1-bed and a few 2-bed flats, and every home has a private pool and smart home controls. Residents share a leisure pool deck, a sun deck with green space and a kids’ pool.
- Private pool in every home
- Smart home controls
- Near City Centre Me’aisem
Shared facilities
- Leisure pool deck
- Kids’ pool
- Sun deck
- Green space
- Pod parking
- Bicycle parking
Progress
- Jan–Mar 2025Launch sales · 155
- Q2 2025Building started
- Oct 2026Last inspection · 6%
- Q2 2028Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 751k433 sq ft · 62 sales
- 1 bed
- AED 1.16M923 sq ft · 111 sales
- 2 beds
- AED 1.51M1,306 sq ft · 12 sales
Against 20 Dubai Production City off-plan projects with 10 or more sales
- Lowest1,165AED/sq ft
- Samana Resorts1,307AED/sq ft
- Typical1,445AED/sq ft
- Highest1,650AED/sq ft
4th lowest of 20 · AED per sq ft in 12 months
Latest sales
Plus 3 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 13 Nov 2026 | Studio New | 434 | 1,760 | AED 764k |
| 9 Nov 2026 | Studio New | 434 | 1,754 | AED 761k |
| 4 Nov 2026 | 1 bed New | 782 | 1,614 | AED 1.26M |
| Oct 2026 · 1 sale | ||||
| 28 Oct 2026 | 1 bed | 800 | 1,471 | AED 1.18M |
| Sep 2026 · 6 sales | ||||
| 14 Sep 2026 | Studio | 433 | 1,627 | AED 704k |
| 10 Sep 2026 | Studio | 433 | 1,820 | AED 788k |
| 10 Sep 2026 | 1 bed | 1,205 | 1,091 | AED 1.31M |
| 10 Sep 2026 | 1 bed | 853 | 1,333 | AED 1.14M |
| 10 Sep 2026 | 2 beds | 1,143 | 1,188 | AED 1.36M |
| 10 Sep 2026 | Studio | 431 | 1,701 | AED 733k |
| Aug 2026 · 8 sales | ||||
| 26 Aug 2026 | 1 bed | 1,023 | 842 | AED 862k |
| 24 Aug 2026 | 1 bed | 878 | 990 | AED 869k |
| 24 Aug 2026 | 1 bed | 883 | 1,285 | AED 1.13M |
| 24 Aug 2026 | 1 bed | 884 | 1,409 | AED 1.25M |
| 6 Aug 2026 | 1 bed | 923 | 1,404 | AED 1.3M |
| 4 Aug 2026 | 1 bed | 973 | 1,437 | AED 1.4M |
| 4 Aug 2026 | 2 beds | 1,147 | 1,332 | AED 1.53M |
| 3 Aug 2026 | 1 bed | 923 | 1,325 | AED 1.22M |
| Jul 2026 · 6 sales | ||||
| 27 Jul 2026 | 2 beds | 1,592 | 970 | AED 1.54M |
| 23 Jul 2026 | 1 bed | 921 | 1,211 | AED 1.12M |
| 15 Jul 2026 | Studio | 431 | 1,835 | AED 791k |
| 7 Jul 2026 | Studio | 434 | 1,604 | AED 696k |
| 3 Jul 2026 | 1 bed | 1,022 | 1,186 | AED 1.21M |
| 3 Jul 2026 | 1 bed | 924 | 1,004 | AED 927k |
| Jun 2026 · 31 sales | ||||
| 29 Jun 2026 | 1 bed | 1,184 | 946 | AED 1.12M |
| 29 Jun 2026 | 1 bed | 917 | 1,088 | AED 997k |
| 29 Jun 2026 | 1 bed | 1,184 | 936 | AED 1.11M |
| 29 Jun 2026 | 1 bed | 864 | 1,145 | AED 989k |
| 29 Jun 2026 | 1 bed | 1,182 | 935 | AED 1.1M |
| 29 Jun 2026 | 1 bed | 1,184 | 946 | AED 1.12M |
| 29 Jun 2026 | 1 bed | 1,022 | 1,054 | AED 1.08M |
| 29 Jun 2026 | 1 bed | 1,184 | 939 | AED 1.11M |
| 29 Jun 2026 | 1 bed | 1,184 | 942 | AED 1.12M |
| 29 Jun 2026 | 1 bed | 1,182 | 928 | AED 1.1M |
| 29 Jun 2026 | 1 bed | 923 | 1,039 | AED 959k |
| 29 Jun 2026 | 1 bed | 1,023 | 977 | AED 999k |
| 29 Jun 2026 | 1 bed | 1,014 | 1,026 | AED 1.04M |
| 29 Jun 2026 | 1 bed | 1,182 | 925 | AED 1.09M |
| 29 Jun 2026 | 1 bed | 1,182 | 928 | AED 1.1M |
| 29 Jun 2026 | 1 bed | 1,182 | 925 | AED 1.09M |
| 29 Jun 2026 | 1 bed | 923 | 1,011 | AED 933k |
| 29 Jun 2026 | 1 bed | 1,182 | 918 | AED 1.09M |
| 29 Jun 2026 | 1 bed | 878 | 1,141 | AED 1M |
| 29 Jun 2026 | 1 bed | 1,184 | 939 | AED 1.11M |
| 29 Jun 2026 | 1 bed | 921 | 1,092 | AED 1.01M |
| 22 Jun 2026 | 1 bed | 1,022 | 1,201 | AED 1.23M |
| 22 Jun 2026 | 1 bed | 912 | 1,393 | AED 1.27M |
| 15 Jun 2026 | 1 bed | 863 | 1,376 | AED 1.19M |
| 15 Jun 2026 | 1 bed | 1,040 | 1,234 | AED 1.28M |
| 15 Jun 2026 | 1 bed | 1,144 | 1,143 | AED 1.31M |
Homes
969 homes by size
- Studio51%494 homes · 424–539 sq ft · 5 layouts
- 1 bed43%418 homes · 782–1,404 sq ft · 18 layouts
- 2 beds6%57 homes · 1,128–1,592 sq ft · 4 layouts
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)37min
- Dubai Marina21min
By car. JBR Beach, the nearest beach, is 7.6 km away.
Rated schools
- Victory Heights Primary SchoolUK · Outstanding3.0 kmaway
- Dwight SchoolInternational Baccalaureate · Good3.7 kmaway
Getting around
- Dubai Production CityGold Line · opens 203213 minwalk
- Al YalayisEtihad Rail3.5 kmaway
- Jumeirah Golf EstatesRed Line3.8 kmaway
- Al Maktoum AirportHigh-speed rail · planned16 kmaway
- Al Maktoum InternationalDWC16 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%Developer
- 6 finished
- 41 being built, on time
- 8 past their planned date
- 2 not started
- Escrow bank
- Dubai Islamic Bank
- Legal name
- Samana International Real Estate Development L.L.C
Also being built by Samana
| Project | Handover | Built |
|---|---|---|
| Samana MykonosDubai Studio City | Q2 2025Past planned date | 91% |
| Samana WavesJVC | Q4 2025Past planned date | 91% |
| Miami BY SDJumeirah Village Triangle | Q4 2025Past planned date | 71% |
| Samana Waves 2JVC | Q1 2026Past planned date | 52% |
| Samana Mykonos SignatureArjan | Q2 2026Past planned date | 86% |
More questions about Samana Resorts
From AED 751k for a 433 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.16M and 2-bed flats sell for about AED 1.51M.
Q2 2028, the planned date in DLD’s register.
It is not past its planned date. It was 6% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 19 months.
969 homes on 19 floors: 494 studios of 424–539 sq ft, 418 1-bed flats of 782–1,404 sq ft and 57 2-bed flats of 1,128–1,592 sq ft.
Down 6% for 1-bed flats, per sq ft. Against the launch sales of Jan 2025 – Mar 2025: studios up 4%, 2-bed flats down 5%.
About AED 40k a year for a studio, AED 63k for a 1-bed and AED 90k for a 2-bed in Dubai Production City, a gross yield of about 8.6% Estimate.
Of Samana’s 57 projects on DLD’s record, 6 are finished. Of the 49 being built, 8 are past their planned date.
In Dubai Production City, 27 minutes by car to Downtown Dubai and 37 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.8 km away.
More nearby
Off-plan nearby
- Samana Lake Views 2From AED 712k9% built · Handover not on record
- Binghatti EliteFrom AED 580k53% built · Past planned date
- Samana Sky ViewsFrom AED 753k2% built · Planned Q3 2028
- Vista by VisionFrom AED 655k12% built · Planned Q3 2027
- Al Ezz Tower by Abu AlnagaNo sales3% built · Planned Q4 2029
- Imperial ResidenceNo sales43% built · Past planned date
Finished buildings nearby
Typical next door AED 1,187/sq ft · 8 buildings within a 10-minute walk
- Oakwood Residency789AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Centrium Tower854AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr · 10-minute walk
- Seslia Tower1,330AED/sq ft1-bed rent AED 66k/yr · 10-minute walk
- Green Park940AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr · 10-minute walk
- Belmont Residences1,625AED/sq ftNot enough rents · 10-minute walk
- Bali Residences1,341AED/sq ft1-bed rent AED 77k/yr · 10-minute walk
- Lakeside1,043AED/sq ft1-bed rent AED 51k/yr
- Qasr Sabah I, II, III743AED/sq ft1-bed rent AED 45k/yr
- The Crescent832AED/sq ft1-bed rent AED 62k/yr
- Lago Vista827AED/sq ft1-bed rent AED 55k/yr
