Skip to content

Binghatti Elite

Dubai Production CityBinghatti

FromAED 580kStudio · 376 sq ft

Binghatti Elite is an off-plan project by Binghatti in Dubai Production City, with 1,745 homes on 23 floors. DLD’s last inspection, on 26 Oct 2026, found it 53% built.

Built
53%
Handover
Q2 2026
Since launch
Up 16%Studio price per sq ft
Payment plan
20/50/30
Homes
1,745

About

Binghatti Elite is a 23-floor building of 1,745 homes in Dubai Production City, its front picked out with metallic details. Almost all homes are studios, with a few 1-bed flats, and each is sold semi-furnished. Residents share a pool and a lounge, and Dubai Hills Mall and Mall of the Emirates are a short drive away.

  • Almost all studios
  • Sold semi-furnished
  • Metallic details on the front

Progress

53%built
  1. Q4 2024Building started
  2. Dec 2024 – Feb 2025Launch sales · 39
  3. Q2 2026Planned handover · passed
  4. Oct 2026Last inspection · 53%
5 months past the planned date

Prices

Price per sq ft

1,534 AED/sq ft144 sales in 12 months

Typical price by size

Studio
AED 580k376 sq ft · 1,542 AED/sq ft · 121 sales
1 bed
AED 1.21M821 sq ft · 1,471 AED/sq ft · 23 sales

Against 20 Dubai Production City off-plan projects with 10 or more sales

  • Lowest1,165AED/sq ft
  • Typical1,445AED/sq ft
  • Binghatti Elite1,534AED/sq ft
  • Highest1,650AED/sq ft

5th highest of 20 · AED per sq ft in 12 months

Binghatti’s own price starts at AED 600k. DLD’s AED 580k is the lowest typical price paid in the 12 months.

Latest sales

Plus 8 newer sales, newest first
144 off-plan sales · Nov 2025 – Oct 2026, plus 8 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
19 Nov 2026Studio New3741,497AED 560k
17 Nov 2026Studio New3791,438AED 545k
13 Nov 2026Studio New3761,327AED 499k
12 Nov 2026Studio New3741,604AED 600k
12 Nov 20261 bed New7141,471AED 1.05M
9 Nov 2026Studio New3781,455AED 550k
9 Nov 2026Studio New3761,489AED 560k
4 Nov 2026Studio New3791,530AED 580k
Oct 2026 · 5 sales
29 Oct 2026Studio3791,451AED 550k
12 Oct 2026Studio3761,356AED 510k
9 Oct 2026Studio3761,330AED 500k
5 Oct 20261 bed7141,471AED 1.05M
2 Oct 2026Studio3782,199AED 831k
Sep 2026 · 16 sales
22 Sep 2026Studio3811,352AED 515k
21 Sep 2026Studio5211,065AED 555k
21 Sep 20261 bed7141,401AED 1M
17 Sep 20261 bed1,062942AED 1M
17 Sep 2026Studio3781,481AED 560k
10 Sep 2026Studio3911,483AED 580k
9 Sep 2026Studio3761,543AED 580k
8 Sep 2026Studio3751,547AED 580k
8 Sep 2026Studio3761,995AED 750k
8 Sep 2026Studio3741,497AED 560k
8 Sep 2026Studio3751,547AED 580k
8 Sep 2026Studio3751,547AED 580k
8 Sep 2026Studio3761,995AED 750k
7 Sep 2026Studio3761,543AED 580k
2 Sep 2026Studio3782,249AED 850k
2 Sep 2026Studio3791,583AED 600k
Aug 2026 · 8 sales
26 Aug 2026Studio3761,662AED 625k
18 Aug 2026Studio3911,483AED 580k
17 Aug 2026Studio3761,503AED 565k
13 Aug 2026Studio3781,741AED 658k
13 Aug 2026Studio3761,410AED 530k
13 Aug 2026Studio3761,489AED 560k
10 Aug 2026Studio5211,056AED 550k
4 Aug 2026Studio3831,462AED 560k
Jul 2026 · 11 sales
20 Jul 2026Studio3761,330AED 500k
16 Jul 2026Studio3741,497AED 560k
15 Jul 2026Studio3761,396AED 525k
13 Jul 2026Studio3912,398AED 937k
13 Jul 2026Studio3711,348AED 500k
9 Jul 2026Studio3761,729AED 650k
8 Jul 2026Studio3821,466AED 560k
7 Jul 2026Studio3761,503AED 565k
7 Jul 2026Studio3761,503AED 565k
1 Jul 20261 bed6391,560AED 997k
1 Jul 2026Studio3761,543AED 580k
Jun 2026 · 13 sales
29 Jun 2026Studio3781,534AED 580k
24 Jun 20261 bed7571,400AED 1.06M

Homes

1,745 homes by size

  • Studio91%1,587 homes · 368–656 sq ft · 14 layouts
  • 1 bed9%158 homes · 639–1,115 sq ft · 10 layouts
  1. 20%On booking
  2. 50%During construction
  3. 30%On handover

Payments go to the project’s escrow account at Abu Dhabi Islamic Bank.

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)36min
  • Dubai Marina20min

By car. JBR Beach, the nearest beach, is 7.5 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding3.2 kmaway
  • Dwight SchoolInternational Baccalaureate · Good3.9 kmaway

Getting around

  • Dubai Production CityGold Line · opens 203212 minwalk
  • Al YalayisEtihad Rail3.3 kmaway
  • Jumeirah Golf EstatesRed Line3.6 kmaway
  • Al Maktoum AirportHigh-speed rail · planned16 kmaway
  • Al Maktoum InternationalDWC16 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%

Developer

  • 43 finished
  • 21 being built, on time
  • 15 past their planned date
  • 5 not started
Escrow bank
Abu Dhabi Islamic Bank
Legal name
Binghatti Developers FZE

Also being built by Binghatti

Binghatti’s other projects
ProjectHandoverBuilt
Bugatti Residences by BinghattiBusiness BayQ4 2025Past planned date66%
Binghatti AmberhallJVCQ1 2026Past planned date38%
Binghatti RubyJVCQ1 2026Past planned date46%
Binghatti HavenDubai Sports CityQ1 2026Past planned date76%
Binghatti StarlightSama Al JadafQ1 2026Past planned date63%
All 84 Binghatti projects
Questions

More questions about Binghatti Elite

From AED 580k for a 376 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.21M.

20/50/30: 20% on booking, 50% during construction, 30% on handover. Payments go to the project’s escrow account at Abu Dhabi Islamic Bank.

Q2 2026, the planned date in DLD’s register.

No. It is 5 months past its planned date, and was 53% built at DLD’s last inspection on 26 Oct 2026.

1,745 homes on 23 floors: 1,587 studios of 368–656 sq ft and 158 1-bed flats of 639–1,115 sq ft.

Up 16% for studios, per sq ft.

About AED 40k a year for a studio and AED 63k for a 1-bed in Dubai Production City, a gross yield of about 8.6% Estimate.

Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.

In Dubai Production City, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.6 km away.

More nearby

How the numbers work

FromAED 580kSee it on the map