Binghatti Elite
Dubai Production CityBinghatti
Binghatti Elite is an off-plan project by Binghatti in Dubai Production City, with 1,745 homes on 23 floors. DLD’s last inspection, on 26 Oct 2026, found it 53% built.
- Built
- 53%
- Handover
- Q2 2026
- Since launch
- Up 16%Studio price per sq ft
- Payment plan
- 20/50/30
- Homes
- 1,745
About
Binghatti Elite is a 23-floor building of 1,745 homes in Dubai Production City, its front picked out with metallic details. Almost all homes are studios, with a few 1-bed flats, and each is sold semi-furnished. Residents share a pool and a lounge, and Dubai Hills Mall and Mall of the Emirates are a short drive away.
- Almost all studios
- Sold semi-furnished
- Metallic details on the front
Progress
- Q4 2024Building started
- Dec 2024 – Feb 2025Launch sales · 39
- Q2 2026Planned handover · passed
- Oct 2026Last inspection · 53%
Prices
Price per sq ft
Typical price by size
- Studio
- AED 580k376 sq ft · 1,542 AED/sq ft · 121 sales
- 1 bed
- AED 1.21M821 sq ft · 1,471 AED/sq ft · 23 sales
Against 20 Dubai Production City off-plan projects with 10 or more sales
- Lowest1,165AED/sq ft
- Typical1,445AED/sq ft
- Binghatti Elite1,534AED/sq ft
- Highest1,650AED/sq ft
5th highest of 20 · AED per sq ft in 12 months
Binghatti’s own price starts at AED 600k. DLD’s AED 580k is the lowest typical price paid in the 12 months.
Latest sales
Plus 8 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 19 Nov 2026 | Studio New | 374 | 1,497 | AED 560k |
| 17 Nov 2026 | Studio New | 379 | 1,438 | AED 545k |
| 13 Nov 2026 | Studio New | 376 | 1,327 | AED 499k |
| 12 Nov 2026 | Studio New | 374 | 1,604 | AED 600k |
| 12 Nov 2026 | 1 bed New | 714 | 1,471 | AED 1.05M |
| 9 Nov 2026 | Studio New | 378 | 1,455 | AED 550k |
| 9 Nov 2026 | Studio New | 376 | 1,489 | AED 560k |
| 4 Nov 2026 | Studio New | 379 | 1,530 | AED 580k |
| Oct 2026 · 5 sales | ||||
| 29 Oct 2026 | Studio | 379 | 1,451 | AED 550k |
| 12 Oct 2026 | Studio | 376 | 1,356 | AED 510k |
| 9 Oct 2026 | Studio | 376 | 1,330 | AED 500k |
| 5 Oct 2026 | 1 bed | 714 | 1,471 | AED 1.05M |
| 2 Oct 2026 | Studio | 378 | 2,199 | AED 831k |
| Sep 2026 · 16 sales | ||||
| 22 Sep 2026 | Studio | 381 | 1,352 | AED 515k |
| 21 Sep 2026 | Studio | 521 | 1,065 | AED 555k |
| 21 Sep 2026 | 1 bed | 714 | 1,401 | AED 1M |
| 17 Sep 2026 | 1 bed | 1,062 | 942 | AED 1M |
| 17 Sep 2026 | Studio | 378 | 1,481 | AED 560k |
| 10 Sep 2026 | Studio | 391 | 1,483 | AED 580k |
| 9 Sep 2026 | Studio | 376 | 1,543 | AED 580k |
| 8 Sep 2026 | Studio | 375 | 1,547 | AED 580k |
| 8 Sep 2026 | Studio | 376 | 1,995 | AED 750k |
| 8 Sep 2026 | Studio | 374 | 1,497 | AED 560k |
| 8 Sep 2026 | Studio | 375 | 1,547 | AED 580k |
| 8 Sep 2026 | Studio | 375 | 1,547 | AED 580k |
| 8 Sep 2026 | Studio | 376 | 1,995 | AED 750k |
| 7 Sep 2026 | Studio | 376 | 1,543 | AED 580k |
| 2 Sep 2026 | Studio | 378 | 2,249 | AED 850k |
| 2 Sep 2026 | Studio | 379 | 1,583 | AED 600k |
| Aug 2026 · 8 sales | ||||
| 26 Aug 2026 | Studio | 376 | 1,662 | AED 625k |
| 18 Aug 2026 | Studio | 391 | 1,483 | AED 580k |
| 17 Aug 2026 | Studio | 376 | 1,503 | AED 565k |
| 13 Aug 2026 | Studio | 378 | 1,741 | AED 658k |
| 13 Aug 2026 | Studio | 376 | 1,410 | AED 530k |
| 13 Aug 2026 | Studio | 376 | 1,489 | AED 560k |
| 10 Aug 2026 | Studio | 521 | 1,056 | AED 550k |
| 4 Aug 2026 | Studio | 383 | 1,462 | AED 560k |
| Jul 2026 · 11 sales | ||||
| 20 Jul 2026 | Studio | 376 | 1,330 | AED 500k |
| 16 Jul 2026 | Studio | 374 | 1,497 | AED 560k |
| 15 Jul 2026 | Studio | 376 | 1,396 | AED 525k |
| 13 Jul 2026 | Studio | 391 | 2,398 | AED 937k |
| 13 Jul 2026 | Studio | 371 | 1,348 | AED 500k |
| 9 Jul 2026 | Studio | 376 | 1,729 | AED 650k |
| 8 Jul 2026 | Studio | 382 | 1,466 | AED 560k |
| 7 Jul 2026 | Studio | 376 | 1,503 | AED 565k |
| 7 Jul 2026 | Studio | 376 | 1,503 | AED 565k |
| 1 Jul 2026 | 1 bed | 639 | 1,560 | AED 997k |
| 1 Jul 2026 | Studio | 376 | 1,543 | AED 580k |
| Jun 2026 · 13 sales | ||||
| 29 Jun 2026 | Studio | 378 | 1,534 | AED 580k |
| 24 Jun 2026 | 1 bed | 757 | 1,400 | AED 1.06M |
Homes
1,745 homes by size
- Studio91%1,587 homes · 368–656 sq ft · 14 layouts
- 1 bed9%158 homes · 639–1,115 sq ft · 10 layouts
Payment plan
Binghatti’s project page- 20%On booking
- 50%During construction
- 30%On handover
Payments go to the project’s escrow account at Abu Dhabi Islamic Bank.
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)36min
- Dubai Marina20min
By car. JBR Beach, the nearest beach, is 7.5 km away.
Rated schools
- Victory Heights Primary SchoolUK · Outstanding3.2 kmaway
- Dwight SchoolInternational Baccalaureate · Good3.9 kmaway
Getting around
- Dubai Production CityGold Line · opens 203212 minwalk
- Al YalayisEtihad Rail3.3 kmaway
- Jumeirah Golf EstatesRed Line3.6 kmaway
- Al Maktoum AirportHigh-speed rail · planned16 kmaway
- Al Maktoum InternationalDWC16 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%Developer
- 43 finished
- 21 being built, on time
- 15 past their planned date
- 5 not started
- Escrow bank
- Abu Dhabi Islamic Bank
- Legal name
- Binghatti Developers FZE
Also being built by Binghatti
| Project | Handover | Built |
|---|---|---|
| Bugatti Residences by BinghattiBusiness Bay | Q4 2025Past planned date | 66% |
| Binghatti AmberhallJVC | Q1 2026Past planned date | 38% |
| Binghatti RubyJVC | Q1 2026Past planned date | 46% |
| Binghatti HavenDubai Sports City | Q1 2026Past planned date | 76% |
| Binghatti StarlightSama Al Jadaf | Q1 2026Past planned date | 63% |
More questions about Binghatti Elite
From AED 580k for a 376 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.21M.
20/50/30: 20% on booking, 50% during construction, 30% on handover. Payments go to the project’s escrow account at Abu Dhabi Islamic Bank.
Q2 2026, the planned date in DLD’s register.
No. It is 5 months past its planned date, and was 53% built at DLD’s last inspection on 26 Oct 2026.
1,745 homes on 23 floors: 1,587 studios of 368–656 sq ft and 158 1-bed flats of 639–1,115 sq ft.
Up 16% for studios, per sq ft.
About AED 40k a year for a studio and AED 63k for a 1-bed in Dubai Production City, a gross yield of about 8.6% Estimate.
Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.
In Dubai Production City, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.6 km away.
More nearby
Off-plan nearby
- Samana Sky ViewsFrom AED 753k2% built · Planned Q3 2028
- Vista by VisionFrom AED 655k12% built · Planned Q3 2027
- Samana Lake Views 2From AED 712k9% built · Handover not on record
- Al Ezz Tower by Abu AlnagaNo sales3% built · Planned Q4 2029
- Samana ResortsFrom AED 751k6% built · Planned Q2 2028
- Samana PortofinoFrom AED 727k60% built · Handover not on record
Finished buildings nearby
Typical next door AED 992/sq ft · 6 buildings within a 10-minute walk
- Oakwood Residency789AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Centrium Tower854AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr · 10-minute walk
- Green Park940AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Bali Residences1,341AED/sq ft1-bed rent AED 77k/yr · 10-minute walk
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr · 10-minute walk
- Lakeside1,043AED/sq ft1-bed rent AED 51k/yr
- Qasr Sabah I, II, III743AED/sq ft1-bed rent AED 45k/yr
- The Crescent832AED/sq ft1-bed rent AED 62k/yr
- Lago Vista827AED/sq ft1-bed rent AED 55k/yr
