Skip to content

Arisha Terraces

Dubai Studio CityQube

FromAED 766kStudio · 418 sq ft

Arisha Terraces is an off-plan project by Qube in Dubai Studio City, with 414 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 34% built.

Built
34%
Handover
Q4 2027
Sales in 12 months
161
Homes
414

About

Arisha Terraces is four buildings of up to 8 floors with 414 homes in Dubai Studio City, shaded by pergolas and climbing plants. Most homes are 1-bed flats, with studios and 2-bed flats. Shared spaces include a rooftop hydroponic garden, a padel court and sauna and steam rooms.

  • Rooftop hydroponic garden
  • Padel court
  • Mostly 1-bed flats

Shared facilities

  • Adults’ and kids’ pools
  • Gym
  • Indoor and outdoor yoga spaces
  • Sauna and steam rooms
  • Rooftop hydroponic garden
  • Padel court
  • Indoor kids’ play area
  • Outdoor playground

Progress

34%built
  1. Q4 2024Building started
  2. Nov 2024 – Jan 2025Launch sales · 2
  3. Oct 2026Last inspection · 34%
  4. Q4 2027Planned handover

Prices

Price per sq ft

1,588 AED/sq ft161 sales in 12 months

Typical price by size

Studio
AED 766k418 sq ft · 1,788 AED/sq ft · 43 sales
1 bed
AED 1.15M726 sq ft · 1,566 AED/sq ft · 99 sales
2 beds
AED 1.68M1,111 sq ft · 1,481 AED/sq ft · 19 sales

Against 7 Dubai Studio City off-plan projects with 10 or more sales

  • Lowest1,246AED/sq ft
  • Typical1,549AED/sq ft
  • Arisha Terraces1,588AED/sq ft
  • Highest1,620AED/sq ft

2nd highest of 7 · AED per sq ft in 12 months

Latest sales

Newest first
161 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 2 sales
28 Oct 20261 bed8081,482AED 1.2M
13 Oct 2026Studio3581,807AED 647k
Sep 2026 · 2 sales
24 Sep 20262 beds1,1051,577AED 1.74M
3 Sep 20261 bed5931,678AED 995k
Aug 2026 · 4 sales
12 Aug 20261 bed7081,571AED 1.11M
3 Aug 20261 bed7241,593AED 1.15M
3 Aug 2026Studio4401,864AED 820k
3 Aug 20261 bed7281,601AED 1.17M
Jul 2026 · 5 sales
22 Jul 20262 beds1,2031,567AED 1.88M
22 Jul 20261 bed7181,558AED 1.12M
22 Jul 20261 bed7261,585AED 1.15M
22 Jul 20261 bed7181,564AED 1.12M
22 Jul 20261 bed7261,529AED 1.11M
Jun 2026 · 5 sales
12 Jun 20261 bed6031,635AED 986k
12 Jun 2026Studio5481,657AED 908k
8 Jun 2026Studio3591,786AED 641k
5 Jun 2026Studio4481,777AED 796k
3 Jun 2026Studio4042,104AED 850k
May 2026 · 4 sales
8 May 2026Studio3581,827AED 654k
8 May 20261 bed7251,621AED 1.18M
8 May 20261 bed7261,566AED 1.14M
6 May 20261 bed7261,652AED 1.2M
Apr 2026 · 5 sales
30 Apr 20261 bed8971,567AED 1.41M
21 Apr 2026Studio4481,783AED 799k
21 Apr 20261 bed8551,440AED 1.23M
15 Apr 20262 beds1,3571,486AED 2.02M
15 Apr 20261 bed7491,646AED 1.23M
Mar 2026 · 8 sales
30 Mar 20262 beds1,3601,448AED 1.97M
30 Mar 20261 bed8081,556AED 1.26M
25 Mar 2026Studio4121,988AED 819k
25 Mar 2026Studio4451,802AED 802k
25 Mar 2026Studio4181,890AED 790k
12 Mar 2026Studio4181,828AED 764k
11 Mar 20262 beds1,2331,385AED 1.71M
9 Mar 20262 beds1,2121,542AED 1.87M
Feb 2026 · 32 sales
26 Feb 2026Studio4111,664AED 684k
26 Feb 20261 bed5381,691AED 910k
26 Feb 20261 bed7171,633AED 1.17M
26 Feb 20261 bed7271,511AED 1.1M
25 Feb 20261 bed7271,735AED 1.26M
25 Feb 20261 bed7661,532AED 1.17M
24 Feb 2026Studio4511,727AED 779k
19 Feb 20262 beds1,2791,489AED 1.9M
19 Feb 20261 bed7931,513AED 1.2M
19 Feb 20261 bed7251,564AED 1.13M
13 Feb 2026Studio4131,818AED 751k
13 Feb 20261 bed6231,610AED 1M
13 Feb 20261 bed7261,591AED 1.16M
13 Feb 20261 bed7281,584AED 1.15M
13 Feb 20262 beds1,2011,480AED 1.78M

Homes

414 homes by size

  • Studio28%116 homes · 343–581 sq ft · 23 layouts
  • 1 bed56%230 homes · 523–1,421 sq ft · 37 layouts
  • 2 beds16%68 homes · 1,035–1,582 sq ft · 21 layouts

Several plans: Studio 60/40 post handover; 1-2 bed 60/40 post handover; 1-2 bed 35/65 (10% down · 1% monthly · 65% on handover); 1-2 bed 60/40 (10% down · 5% quarterly · 65% on handover)

Payments go to the project’s escrow account at Commercial Bank of Dubai.

Location

Drive times

  • Downtown Dubai30min
  • Dubai Airport (DXB)36min
  • Dubai Marina25min

By car. JBR Beach, the nearest beach, is 11.6 km away.

Rated schools

  • Dwight SchoolInternational Baccalaureate · Good0.7 kmaway
  • Victory Heights Primary SchoolUK · Outstanding1.3 kmaway

Getting around

  • Dubai Miracle GardenGold Line · opens 20322.9 kmaway
  • Al YalayisEtihad Rail7.1 kmaway
  • Jumeirah Golf EstatesRed Line7.5 kmaway
  • Al Maktoum AirportHigh-speed rail · planned17 kmaway
  • Al Maktoum InternationalDWC17 kmaway
Area guideDubai Studio CityFinished homesAED 1,393/sq ft1-bed rentAED 65k/yrGross yieldEstimate7.9%

Developer

  • 1 finished
  • 3 being built, on time
Escrow bank
Commercial Bank of Dubai
Legal name
Qube Development L.L.C

More by Qube

Qube’s other projects
ProjectHandoverBuilt
ElireBusiness BayQ2 2029Being built8%
SAWA RESIDENCESRas Al Khor Ind. FirstQ3 2030Being built0%
Cubix ResidencesJVCQ4 2025Finished
All 4 Qube projects
Questions

More questions about Arisha Terraces

From AED 766k for a 418 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.15M and 2-bed flats sell for about AED 1.68M.

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 34% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.

414 homes on 8 floors: 116 studios of 343–581 sq ft, 230 1-bed flats of 523–1,421 sq ft and 68 2-bed flats of 1,035–1,582 sq ft.

About AED 46k a year for a studio, AED 65k for a 1-bed and AED 88k for a 2-bed in Dubai Studio City, a gross yield of about 7.9% Estimate.

Of Qube’s 4 projects on DLD’s record, 1 are finished. Of the 3 being built, none is past its planned date.

In Dubai Studio City, 30 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 7.5 km away.

More nearby

How the numbers work

FromAED 766kSee it on the map