Sawa Residences
Ras Al KhorQube
Sawa Residences is an off-plan project by Qube in Ras Al Khor, with 355 homes on 20 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q3 2030
- Sales in 12 months
- No sales
- Homes
- 355
Progress
- Q3 2026Building started
- Oct 2026Last inspection · 0%
- Q3 2030Planned handover
Homes
355 homes by size
- 1 bed69%246 homes · 385–1,820 sq ft · 23 layouts
- 2 beds26%91 homes · 891–3,114 sq ft · 12 layouts
- 3 beds5%18 homes · 1,254–1,558 sq ft · 6 layouts
Location
Drive times
- Downtown Dubai22min
- Dubai Marina34min
By car. La Mer Beach, the nearest beach, is 9.4 km away.
Rated schools
- Hartland International School - FZUK · Very good3.2 kmaway
Getting around
- Dubai SquareBlue Line · opens 20292.6 kmaway
- CreekGreen Line4.0 kmaway
- MeydanEtihad Rail · planned4.2 kmaway
- Al JaddafHigh-speed rail · planned4.6 kmaway
- Dubai InternationalDXB8.3 kmaway
Developer
- 1 finished
- 3 being built, on time
- Escrow bank
- Not on record
- Legal name
- Qube Development L.L.C
More by Qube
| Project | Handover | Built |
|---|---|---|
| Arisha TerracesDubai Studio City | Q4 2027Being built | 34% |
| ElireBusiness Bay | Q2 2029Being built | 8% |
| Cubix ResidencesJVC | Q4 2025Finished |
More questions about Sawa Residences
Q3 2030, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 years.
355 homes on 20 floors: 246 1-bed flats of 385–1,820 sq ft, 91 2-bed flats of 891–3,114 sq ft and 18 3-bed flats of 1,254–1,558 sq ft.
About AED 59k a year for a 1-bed in Ras Al Khor Ind. First.
Of Qube’s 4 projects on DLD’s record, 1 are finished. Of the 3 being built, none is past its planned date.
In Ras Al Khor, Ras Al Khor Ind. First, 22 minutes by car to Downtown Dubai and 34 to Dubai Marina. Creek Metro station on the Green Line is 4.0 km away.
More nearby
Off-plan nearby
- Amaal 8From AED 1.92M7% built · Planned Q4 2028
- EpoqueNo sales0% built · Planned Q3 2029
- Sanctuary by Prestige OneNo sales0% built · Planned Q3 2029
- Sobha OneFrom AED 1.69M86% built · Handover not on record
- Everly PlaceNo sales0% built · Planned Q2 2029
- The Element at Sobha OneFrom AED 1.86M11% built · Planned Q4 2029