Skip to content

Elire

Business BayQube

Elire is an off-plan project by Qube in Business Bay, with 100 homes on 16 floors. DLD’s last inspection, on 26 Oct 2026, found it 8% built.

Built
8%
Handover
Q2 2029
Sales in 12 months
1
Homes
100

About

Elire is a 16-floor building of 100 homes in Business Bay, facing inward onto gardens and managed by the hotel group LUX*. Homes run from 1-bed flats to 4-bed duplexes, with 1-bed flats the biggest share, all with custom-made furniture. Residents share a rooftop infinity pool, a Turkish hammam and a padel court, with a zone for teenagers.

  • Managed by LUX*
  • Rooftop infinity pool
  • Turkish hammam

Shared facilities

  • Rooftop infinity pool
  • Kids’ pool
  • Turkish hammam
  • Spa
  • Gym
  • Yoga and reformer Pilates studio
  • Padel court
  • Teenage zone

Progress

8%built
  1. Q2 2025Building started
  2. Oct 2026Last inspection · 8%
  3. Q4 2028Developer’s date
  4. Q2 2029Planned handover

Prices

Typical price by size

Typical price by size · Nov 2025 – Oct 2026
SizeTypical priceAED/sq ftSales
1 bedNot enough sales1

Against 31 Business Bay off-plan projects with 10 or more sales

  • Lowest1,536AED/sq ft
  • Typical2,766AED/sq ft
  • Elire4,263AED/sq ft
  • Highest7,048AED/sq ft

Latest sales

Newest first
1 off-plan sale · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Feb 2026 · 1 sale
19 Feb 20261 bed6554,263AED 2.79M

Homes

100 homes by size

  • 1 bed41%41 homes · 611–1,076 sq ft · 11 layouts
  • 2 beds18%18 homes · 1,446–1,564 sq ft · 3 layouts
  • 3 beds17%17 homes · 2,436–3,804 sq ft · 3 layouts
  • 4 beds24%24 homes · 5,389 sq ft · 1 layout

Option 1: 60% Before Handover · 40% On Handover. Option 2: 45% Before Handover · 55% On Handover

Payments go to the project’s escrow account at First Abu Dhabi Bank.

Location

Drive times

  • Downtown Dubai8min
  • Dubai Airport (DXB)24min
  • Dubai Marina24min

By car. Mercato Beach, the nearest beach, is 3.4 km away.

Rated schools

  • JSS Private SchoolIndian · Very good1.6 kmaway
  • Jumeirah English Speaking SchoolUK · Outstanding2.8 kmaway

Getting around

  • Burj Khalifa RoadGold Line · opens 203210 minwalk
  • Business BayRed Line12 minwalk
  • MeydanEtihad Rail · planned5.1 kmaway
  • Al JaddafHigh-speed rail · planned7.6 kmaway
  • Dubai InternationalDXB12 kmaway
Area guideBusiness BayFinished homesAED 1,866/sq ft1-bed rentAED 90k/yrGross yieldEstimate6.5%

Developer

  • 1 finished
  • 3 being built, on time
Escrow bank
First Abu Dhabi Bank
Legal name
Qube Development L.L.C

More by Qube

Qube’s other projects
ProjectHandoverBuilt
Arisha TerracesDubai Studio CityQ4 2027Being built34%
SAWA RESIDENCESRas Al Khor Ind. FirstQ3 2030Being built0%
Cubix ResidencesJVCQ4 2025Finished
All 4 Qube projects
Questions

More questions about Elire

Q2 2029, the planned date in DLD’s register.

It is not past its planned date. It was 8% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.

100 homes on 16 floors: 41 1-bed flats of 611–1,076 sq ft, 18 2-bed flats of 1,446–1,564 sq ft, 17 3-bed flats of 2,436–3,804 sq ft and 24 4+ bed flats of 5,389 sq ft.

About AED 90k a year for a 1-bed, AED 135k for a 2-bed, AED 185k for a 3-bed and AED 328k for a 4+ bed in Business Bay, a gross yield of about 6.5% Estimate.

Of Qube’s 4 projects on DLD’s record, 1 are finished. Of the 3 being built, none is past its planned date.

In Business Bay, 8 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Business Bay Metro station on the Red Line is a 12-minute walk.

More nearby

How the numbers work