Everly Place is an off-plan project by Ellington in Ras Al Khor, with 209 homes on 10 floors. DLD’s last inspection, on 3 Jul 2026, found it 0% built.
- Built
- 0%
- Handover
- Q2 2029
- Sales in 12 months
- No sales
- Homes
- 209
Progress
- Q2 2026Building started
- Jul 2026Last inspection · 0%
- Q2 2029Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
209 homes by size
- 1 bed68%142 homes · 694–1,485 sq ft · 8 layouts
- 2 beds24%50 homes · 1,176–2,048 sq ft · 7 layouts
- 3 beds8%17 homes · 1,705–1,819 sq ft · 5 layouts
Location
Drive times
- Downtown Dubai22min
- Dubai Marina34min
By car. Mercato Beach, the nearest beach, is 9.0 km away.
Rated schools
- Hartland International School - FZUK · Very good2.8 kmaway
Getting around
- Dubai SquareBlue Line · opens 20293.1 kmaway
- MeydanEtihad Rail · planned3.8 kmaway
- CreekGreen Line4.2 kmaway
- Al JaddafHigh-speed rail · planned4.8 kmaway
- Dubai InternationalDXB8.6 kmaway
Developer
- 18 finished
- 25 being built, on time
- 7 past their planned date
- 1 not started
- Escrow bank
- Not on record
- Legal name
- Epd BK Developers L.L.C
Also being built by Ellington
| Project | Handover | Built |
|---|---|---|
| The PortmanJVC | Q3 2025Past planned date | 79% |
| UH West BY EllingtonJLT | Q1 2026Past planned date | 71% |
| UH East BY EllingtonJLT | Q1 2026Past planned date | 47% |
| The QuaysideBusiness Bay | Q1 2026Past planned date | 55% |
| The Waterside Villas BY EllingtonMajan | Q2 2026Past planned date | 32% |
More questions about Everly Place
Q2 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 3 Jul 2026, with handover planned in 3 years.
209 homes on 10 floors: 142 1-bed flats of 694–1,485 sq ft, 50 2-bed flats of 1,176–2,048 sq ft and 17 3-bed flats of 1,705–1,819 sq ft.
About AED 59k a year for a 1-bed in Ras Al Khor Ind. First.
Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.
In Ras Al Khor, Ras Al Khor Ind. First, 22 minutes by car to Downtown Dubai and 34 to Dubai Marina. Creek Metro station on the Green Line is 4.2 km away.
More nearby
Off-plan nearby
- EpoqueNo sales0% built · Planned Q3 2029
- Sanctuary by Prestige OneNo sales0% built · Planned Q3 2029
- Sawa ResidencesNo sales0% built · Planned Q3 2030
- Amaal 8From AED 1.92M7% built · Planned Q4 2028
- Sobha OneFrom AED 1.69M86% built · Handover not on record